Loading…
Loading…
2,151 results • Best match
Balance work of W beam metal crash barrier safety fencing between BLQR-RUPC section. (Under sanction work of provision of safety fencing-88.12 Km) between RUPC-RMU section in connection with raising for speed up to 130Kmph under ADEN KPV of IZN ... N.E. Railway .
Metal beam Crash Barrier - Double W Single side : RM - Providing and erecting "W" metal beam 02 Nos barrier comprising of 2 mm thick corrugated sheet metal beam rail on 1.50m high channel post (150x75x4mm) above ground level and 1.20m below ground level, spaced at 2m centre to centre, all steel parts, all fittings and fitments to be galvanized by hot dip process confirm to IS 4759, metal beam rail to be fixed on the vertical post complete. Work will be carried out as per Railway approved drawing and as per specification and special condition of contract attached here with. The post should be placed below G.L.by Driven mechanism or auger mechanism as directed Engineer in-charge as per site conditions. The concrete and shuttering as and when required will be paid under the relevant items. Note :-The item rate includes with materials, labours, lead, lift, loading, unloading, Tools and plants, all taxes, site cleaning, bush cutting, preparation of approach path, manual carting of materials due to unavoidable site requirement, etc. with contractors own materials and labours necessary for doing all the work involved in constructing the metal beam railing barrier complete in place in all respects as per the Specifications. Work will be carried out as per direction and instruction of Engineer in charge of work/ Engineer representative. (No any extra payment shall be paid by Railway).
Balance work of Building Works, Earthwork in filling for new platform, for raising of platform no.1 and yard formation work, blanketing, protection works at B-Class Station LAV, balance works of D-class Station Building at SAJH, PQD and DVJ, Raising ... ancillary works in ... F. Railway (Construction).
Textile (JGT) in slopes of Railway
Supply and Fixing Complete Fitting of LED street lights 110-130 Watts on 7 meter high octanagonal single arm 15 poles Installation with tricolor rope strip light on one side of the road from Railway Station to Hariharganj Naka, Fatehpur
Supply & fixing of 7 meter long having hot dipped galvanized octagonal pole having 70 mm top, 130 mm bottom, 3 mm thickness, 220x220x12 mm base plate etc. with4 nos. J type M20X600 mm long foundation bolts & 1500mm single decorative arm bracket in 1:3:6 cement concrete foundation including excavation back filling etc (SI No.642)
General Civil Maintenance Work of Viaduct & 05 Metro Stations (i.e. Ranip, Sabarmati Railway, AEC, Sabarmati and Motera Stadium) of North-South Corridor NS-4 Section from Ranip to Motera Dead End of Ahmedabad Metro Rail Project Phase - 1
Sabarmati Railway, AEC, Sabarmati and Motera Stadium) of North-South Corridor NS-4
Provision of Wall mounted Industrial type Air Conditioner Unit in S&T installations work at various New EI installation buildings in connection with NGP-SEGM 3rd & 4th line and WR(SEGM)- BPQ 3rd line of Nagpur division Central Railway
Supply and erection of POP work for indoor unit,Civil work (Wall break) colouring etc.
Construction of 2 Lane ROB From Ujjain Tiraha to Nagukhedi Chouraha Road Dewas Parallel to Existing 2 Lane ROB at Old LC. No 29 at K.M 41/3-7 Including Electrical Work, Railway Portion District Dewas in EPC Mode
Construction of 2 Lane ROB From Ujjain Tiraha to Nagukhedi Chouraha Road Dewas Parallel to Existing 2 Lane ROB at Old LC. No 29 at K.M 41/3-7 Dwx Yard on IDU Section on Dewas-Ujjain Road Including Shifting 11KV/LT Line/ Xmer and Street Lighting, Service Road and Railway Portion District Dewas in EPC Mode