Loading…
Loading…
2,191 results • Best match
Provision of Wall mounted Industrial type Air Conditioner Unit in S&T installations work at various New EI installation buildings in connection with NGP-SEGM 3rd & 4th line and WR(SEGM)- BPQ 3rd line of Nagpur division Central Railway
Supply and erection of POP work for indoor unit,Civil work (Wall break) colouring etc.
Construction of 2 Lane ROB From Ujjain Tiraha to Nagukhedi Chouraha Road Dewas Parallel to Existing 2 Lane ROB at Old LC. No 29 at K.M 41/3-7 Including Electrical Work, Railway Portion District Dewas in EPC Mode
Construction of 2 Lane ROB From Ujjain Tiraha to Nagukhedi Chouraha Road Dewas Parallel to Existing 2 Lane ROB at Old LC. No 29 at K.M 41/3-7 Dwx Yard on IDU Section on Dewas-Ujjain Road Including Shifting 11KV/LT Line/ Xmer and Street Lighting, Service Road and Railway Portion District Dewas in EPC Mode
Open e-Tender for Repairs, maintenance & execution of all works including new works [i.e. General work, Wood works, Water Pipeline and sanitary works] of all service building at Malda Station area, Goods Shed, Cabins, Divl. Rly. Hospital, coaching ... building, Railway Stadium, ...
General Service Electrification works for provision of Stabling lines at Ujjain NC yard/Loco yard, Relocation of PQRS siding lines at Ujjain Loco Yard, Provision of Additional loop line at Chintaman Ganesh Station yard of Ratlam Division of Western ... Western Railway , ...
A-Electrification works
Subwork-1: Provision of Electronic Interlocking System including outdoor signalling works and Telecom arrangements in connection with the commissioning of additional loop lines and yard remodelling suitable for doubling at Haliyuru (HLV), ... Western Railway . ... signalling works and ... Western Railway .
88.00 track circuiting Point zone to suit RE/Non-RE areas as per approved signaling plan using Plug-in type track relays. This work includes provision of double bonding, and parallel jumpers, provision of bond wire clips, provision of track lead connections using 2c X 2.5 sq.mm cable, provision of TLJB boxes 2 Nos. at Relay end, 2 Nos. at Feed end and 2 Nos for parallel jumpers as necessary to suit layouts, for each Track Circuit, and termination of jumpers and tail cables in track lead junction boxes, installation of relays, track feed battery chargers to charge up to 4 cells, track feed resistance, B type choke and secondary cells - 80 AH capacity in apparatus cases and wiring with wire PVC 3/0.75mm copper. The work also includes painting of track Circuit No. with Feed end/ Relay end details on the TLJB boxes. The work also includes provision of insulations for gauge tie plates and nose crossing plates wherever required. (Provision of rail joint insulation is not covered in this item) (Uninsulated gauge type plate and nose crossing plate will be supplied by Railways. Supply of track feed battery charger, B type choke, track relays, uncharged secondary cells (2V - 80AH), TLJB boxes with stumps, 2cX2.5 sq.mm cable, is not covered in this item). [track feed resistance, Gauge tie plate and nose crossing plate insulations, PVC/Nylon bushes for TLJB boxes, PVC sleeves, all types of fixing bolts and nuts with spring and flat washers, teakwood stand for fixing track feed resistance, GI bond wire 8 SWG, Channel bond pins, bond wire clips, paints and all other miscellaneous materials shall be supplied by the contractor. Secondary cells-80 AH capacity shall be charged by the contractor through reputed charging agencies]. SWR-CONST-UBL-S AND T/SOUTH WESTERN RLY
Conducting Final Location Survey, including collection of field details for geotechnical investigation, preparation of GADs & other drawings and preparation of survey report & estimate etc for the work of construction of doubling of BG line between ... S.E.C. Railway .
Conducting Aerial Topographical Survey with DGPS integrated RTK/PPK UAS DRONE basedphotogrammetric and Lidar to capture ground features and assets along the given alignment 1 including Yards. TerrestrialBased Lidar System shall also be conducted to get uniform accuracy and data through out on the final approvedalignment. Survey will be done for width of around 100m. In mid-section and around 250 m in yard. However finalwidth requirement shall be as approved by Engineer-in-charge. Following output should be delivered: 1. Topographicalbase map in AutoCAD format of 1:500 scale having all the naturals & manmade features such as buildings, road, tracks,platforms, walls, yards boundaries, fences, signals, electrical mast, FOBs, LCs, RUB/ROBs etc. In .DWG or .DXF format.2. Contours at an interval of 50 cm in DWG or DXF format. 3. Digital Elevation Model of 1m resolution in ASCII formatand DWG format. 4. 3cm resolution (GSD) Ortho- photo in ECW or TIFF format which can be opened in CAD. 5. List ofControl points established onto the Ground using DGPS (every 2 km as primary control points on existing permanentStructures.) 6. RTK (every 250 m) along with their Latitude, Longitude and elevation. 7. NSSDA report showingaccuracy achieved in comparison to control points established. 8. Digital Terrain Model showing accuracy achieved incomparison to control points established. 9. Preparation and supplying of Yard Plans (ESPs) of various Stations alongthe alignment showing proposed position of track and related structures based on concept plan on Auto Cad and submitin CD along with miniature A4 size yard diagram. 10. The levels shall be provided at every 25 M interval and each 5 Mfor cross section upto 30 M beyond toe/edge of bank/cutting of BG formation for cross section and must be shown inplan. 11. The Reduced level/Rail level shall be connected with standard bench mark. 12. Longitudinal section (L-Section)/Cross section and alignment plan will be prepared on computer in Auto CAD and submitted in soft copy as wellas hard copy. 13. Index plan and index section in soft copy as well as hard copy. 14. Processed 3D point cloud in LASformat. The item also include staking of approved alignment with RCC Pillars (150 x 150x 900mm size with 300mmprojected above ground level) at an interval of 500m, (with wooden pegs 50 x 50 x 450mm size) at every 20m wheretrack is away from the existing track or where it is advised by Engineer-in-charge. (Cost of wooden pegs is inclusive).The RCC Pillars shall also be fixed on curves indicating transition portion, apex point, crown of curve, beginning and endpoint of circular curves, (5 locations for each curve) at major bridges two pillars one or either side, including submittinglist of distance and coordinates of centre line of proposed BG line from centre line of existing BG line at every 25minterval. He shall also submit the list of existing infringement to the proposed BG alignment as per latest SOD for BG.The proforma for the same shall be approved by Engineer-in-charge. Payment Schedule for Item No.1 of Schedule : A.70% payment shall be made on submission of the report. B. 30% payment shall be made on approval of the work bythe Railways.