Loading…
Loading…
2,097 results • Best match
P/Laying Interlocking Tiles (Steel Mould) in Link Road to Railway Line on Kheri Nud Singh Road.
P/Laying Interlocking Tiles (Steel Mould) in Link Road to Railway Line on Kheri Nud Singh Road.
RAILWAY ROAD SE GULZAR KE GHAR TAK ME 110 MM PEYJAL PIPE LINE DALE JANE KA KARYA
RAILWAY ROAD SE GULZAR KE GHAR TAK ME 110 MM PEYJAL PIPE LINE DALE JANE KA KARYA NAGAR PANCHAYAT SAHAWAR KASGANJ
Road widening from Lohsara tiraha via CLK school to railway over bridgeincludingBTand Paver block in footpath Area
RoadwideningfromLohsaratirahaviaCLKschoolto railway over bridge including BT and Paver block in footpath area
ROUND AIR VENT FOR LHB AC ECONOMY COACHES AS PER CENTRAL RAILWAY DRG. NO. MISC SK.NO.4021.
Description :ROUND AIR VENT FOR LHB AC ECONOMY COACHES AS PER CENTRAL RAILWAY DRG. NO. MISC SK.NO .4021. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SSE/TL/AGC, NCR Uttar Pradesh 1500.00 Numbers
Removal of earth at Railway siding No. 09 from platform area under Balram OCP of Hingula Area
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Construction of a two-lane end-to-end Road Over Bridge (ROB) with LHS in lieu of LC No. 295/A at Km. 702/9 - 703/0 between Sarju - Jarwal Road stations in Gonda - Barabanki section and Construction of two-lane ROB (Railway portion only) in lieu of ... Burhwal Railway stations ... N.E. Railway .
Launching of Railways relieving girder of MT overall length up to 12 to 22 m after removing track ballast, excavation earth on properly prepared wooden/CC Cribs supports as per the approved scheme of launching, railway drawing and specifications by contractor's road crane including all tools, plants, machineries, labour, equipments etc. The work includes fixing of track i.e. steel channel sleeper, rails and fixing as per railway's specifications and standards on the relieving girder and necessary adjusment in the longitudinal x-levels including lifting and packing of approaches of girders after insertion of relieving girders in track to maintain safety of cranes on the relieving girders and its approaches. Note:- Rails will be provided by railway. CAO-C-RSP-NER-ENGINEERING/NORTH EASTERN RLY