Loading…
Loading…
14,907 results • Best match
Custom Bid for Services - MAINTENANCE OF WATER PUMPS FOR A PERIOD OF TWO YEARS AT HALDIA DOCK COMPLEX SMPK Similar Category Operation And Maintenance Of Water Supply Systems
Custom Bid for Services - MAINTENANCE OF WATER PUMPS FOR A PERIOD OF TWO YEARS AT HALDIA DOCK COMPLEX SMPK Similar Category Operation And Maintenance Of Water Supply Systems
Refer SBD for description
Providing, Laying and Fitting of Light GI pipes complete excluding trenching and refilling. Providing and fixing of GI pipe Medium classwith MS Flanged Joints (12mm thick) for 100mm rising mains to double flanged MC, GI pipes including cutting of pipes, welding charges, cutting flanges, rubber gaskets, bolts nuts, including tesing of joints and all sorts of carriage incl. laying of pipe in trenches Complete Job
Job required for Manning and Operation of DK I STP and Arjan Vihar STP in the of AGE (U) Water Supply No II under GE (U) Water Supply Delhi Cantt-10
Open tender for Zonal works for all Service Buildings, Station Buildings such as Plateforms,circulating area,RRI,RPF buildings , RPF Mahila Batalian Asansol, Traffic and Domohani health units etc. including Barakar,Sitarampur Pump House etc. ... Wood, Pipe Laying ... Wood,Pipe Laying , ... Installation works within ... SSE/ Works /East/Asansol ...
Drilling of 8 inch dia 1 no of borewell for installation of Submersible set and development of tanker filling point with drainage facilities at 203 Army aviation Squadron at Spituk.
Transportation of boring equipment,machine,tools to the new site of bore work ,fixing of complete camp by way of erection of equipment, tools ,accessories attachment fixing of tent for labour and stacking of material at borewell site.The job also includes levelling of ground, drilling machine and other charges on account of POL etc. a)For 1st shifting of boring machine and equipment
REPAIR/ MAINT AND IMPROVEMENT OF WATER SUPPLY, SEWAGE PUMP REPAIR UNDER GE DRONACHAL
Supply and install desert cooler electric driven (single phase) three speed having nominal air flow capacity 5000CFM per hour, with propeller ISI cooler fan motor copper winding single phase fitted with / having aluminium blade of minimum size 500 mm ,submersible pump, Max power consumption of 325 Watts. Cooler body made out from 20 gauge mild steel galvanized iron sheet & water tank made out of 18 SWG, having capacity 40 Ltr minimum including three louvers with wood wool pad, flexible PVC distribution pipes and 3 way junction all as directed by Engr-in-Charge and of standard make as approved by GE” NOTE : 1. Three speed switch ISI Marked rotary type for propeller fan and one way switch pump with separate control. The switches shall have marking off- Low - medium and high. 2. float valve on water supply connection shall be deemed to be included in unit rate quoted