Loading…
Loading…
93,191 results • Best match
Routine and Breakdown Maintenance of BCW System Unit 1 to 5, Service Water System Unit 1 to 7 and all pumps installed at old and new Thermal Colony for Potable water supply and Sewage Water Treatment Plant at KSTPS, RVUNL, Kota.
Routine and Breakdown Maintenance of BCW System Unit # 1 to 5, Service Water System Unit # 1 to 7 and all pumps installed at old and new Thermal Colony for Potable water supply and Sewage Water Treatment Plant at KSTPS, RVUNL, Kota (As per Part A of G-Schedule and scope of work)
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR LAHARTOWN
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR LAHAR TOWN Under Swachh Bharat Mission (Urban) 2.0
Laying Jointing and testing of GI pipe line 80mm Dia LC from HAmgram Source to Water Treatment plant Dhangsidhar Deposit Work
Laying, jointing and testing of GMS pipe bevelled edged conforming to 15:1239 of following size and class in trenches having random lengths of 5-7 mtrs including cost of fabrication of minimum 3 cut bends of required degree The pipe shall have inside & out side Galvanisation at manufacturer work conforming to 15:4736 (with upto date ammendments). The pipe shall be jointed with circumferencial butt welded joints by electric arc welding with minimum three layers of welds so as to achive the minimum effective thorat thickness and strength of weld conforming to IS: 816-1969 sepecification, by using welding electrodes of 2.50 mm to 6.30 mm of Advanı Oerlikon (Ador) CITOJET/Esab make, conforming to IS:814-1991, at site of work complete in all respects. Each butt welded joint shall be tested with dye-penetration test (with the kit consisting of 3 sprays of 250 ML each includes (a) Cleaner CL-96 (b) Penetrant PT-97 (c) Developer Div-98 of checkmate make) complete in all respects, including manual / mechanical handling of pipes in all leads and lifts to the entire satisfication of Engineer-in-charge (The earth work in treches and cost of MS flanges to be measured and paid for separately).GMS Pipe 80 mm dia (MC) (P/E)
Design and Construction of Water Supply, Sewerage System and Sewage Treatment Plant, House Service Connections and Allied Works with 5 Years Operation and Maintenance Period in Jyotirmath Town, Chamoli District, Uttarakhand
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR BIJAWAR TOWN
1. Design and build sewage treatment plant of installed capacity 1.3 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs including survey, design, Providing , Supplying, erection and construction of 1 No. of Pumping stations and all appurtenant structures and allied works; 3. Providing, laying, jointing, testing, commissioning of (i) Sewage pumping main of DI K-7 pipe having length of 1600 m of dia 80 mm and DI K-7 pipe having length of 1365 m and dia 150 mm (ii) Treated water pumping main of DI K-7 pipe having length of 52 m of dia 150 mm and from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete. 4. Treated Water Sump with Pump House 5. Providing , Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipments and fittings complete in all respect
Facility Management Service- Manpower based (Version 2) - Industrial; Operation of pumps, sewage treatment plant, water treatment plant & routine checking, cleaning and arresting leakages of foot valve, operation of gate valves at different levels of..
sewage treatment plant