Used Water Management Project in Badhni Bazar Nagar Panchayat Distt- Siddharthnagar.
Survey (GIS based), Soil investigation, Engineering, Design (hydraulic and structural) as required, procurement of all labour & material, T&P etc. for completion of various components under “Used Water Management Project in Shohratgarh Nagar Panchayat Distt. Siddharthnagar”. It includes Interception and Diversion works of all existing drains, conveyance network and establishment of Centralized/ De-centralized Sewage Treatment Plant(s) based on open technology, inclusive of 5 KLD Co-Treatment facility for Fecal Sludge/ Septage, ensuring the final effluent parameter strictly complies with the National Green Tribunal (NGT) latest guidelines i.e. BOD10mg/l, TSS 20mg/l, Nitrogen-Total10mg/l, Total Phosphorus 1mg/l, Fecal coliform100 MPN & COD50mg/l The cost includes cost of Civil, E&M and instrumentation works in suitable foundation for I&D, conveyance network, STP(s) with inlet chamber, pre-treatment units (including one stand-by unit), Primary/ Secondary Treatments, Disinfection, Disposal of treated sewage by gravity/pumping (as required), Sludge Thickening, Sludge dewatering units with necessary piping work with valves, gates, drains, pathways etc. all complete as turnkey job. The STP shall also have flow meters installed at inlet, outlet and bypass, level sensors, PLC/SCADA Automation and required instrumentations including IP based CCTV during construction. The cost shall also include required power DG sets, Electric Substation, Transformers and foundation, pumps and Control Panels, SCADA & Meter room, Administrative building cum Laboratory cum Store room, boundary wall 1.8 m high with main gate wicket gate & other required buildings) and disposal of treated effluent, with all other associated works at Badhni Bazar Nagar Panchayat District Siddharthnagar, U.P, India.
Preparation of Detailed Project Report (DPR) for Sewerage line System Under Phase-II in Municipal Area Sumerpur
Preparation of Detailed Project Report (DPR) for the Sewerage System/sewer gap and related works in Sumerpur.The scope of work included survey, planning, design, and preparation of the DPR for the sewerage system; providing, laying, jointing, testing, and commissioning of sewerage infrastructure and allied works; design, construction, supply, installation, testing, and commissioning of Sewage Pumping Station (MPS), if required; preparation of DPR for Sewage Treatment Plant based on SBR process; shifting of main trunk lines from escape channels; and planning for reuse of treated waste water for SumerpurTown.
Providing laying cutting testing of Sewer RCC Np 3 with HDPE lining and Rising main D I K 9 pipe const M H Chamber Hatch box MPS and Survey Design Supply and Soil Testing Const Inst Comm of 20 MLD STP cum 60 KLD FSTP including O and M Gurdaspur
Survey, Design, Supply & Soil Testing Construction, Installation, Commissioning of 20.00 MLD Sewerage Treatment Plant Cum (60.0 KLD) FSTP respectively based on any suitable sustainable & proven biological technology works including O & M sixty months only for STP & FSTP after stabilization period of 3 months or more at Town & Distt. Gurdaspur. (SBM 2.0 Scheme).
USED WATER MANAGEMENT PROJECT IN HATHGAON NP DISTRICT FATEHPUR UNDER SBM 2.0 PROGRAMME
Survey, Design, Procurement & Conducting a GIS-based survey and soil investigation. Performing necessary hydraulic and structural engineering and design. Procuringall required labor, materials, and Tools & Plants (T&P) for Network and Treatment Facilities. Executing Interception and Diversion (I&D) works for all existing drains and establishing a conveyance network. Establishing Centralized/ De-centralized Sewage Treatment Plant(s) (STP) based on open technology including a 4 KLD Co-Treatment facility specifically for Fecal Sludge/Septage.Constructing Civil, Electrical & Mechanical (E&M), and instrumentation works with suitable foundations for the I&D, conveyance network, and STP(s). Building STP components including an inlet chamber, pre-treatment units components including an inlet chamber, pre-treatment units (including one standby unit), Primary/Secondary Treatments, and Disinfection units. Setting up Sludge Thickening and Sludge dewatering units ensuring the final treated effluent strictly complies with the latest National Green Tribunal (NGT) guidelines (BOD10mg/l, TSS20mg/l, Nitrogen-Total 10mg/l, Total Phosphorus 1mg/l, Fecal coliform100 MPN & COD50mg/l).Executing necessary piping work including valves, gates, drains, and pathways. Setting up mechanisms for the disposal of treated sewage and effluent by gravity/ pumping. Constructing an Administrative building cum Laboratory cum Store room, and a SCADA & Meter room. Erecting a 1.8 m high boundary wall equipped with a main gate, wicket gate, and other required buildings. Electrical, Instrumentation, and Automation Installing flow meters at the inlet, outlet, and bypass, alongside level sensors.Implementing PLC/SCADA Automation and required instrumentation. Setting up IP-based CCTV for monitoring during the construction and Operation & Maintenance (O&M) periods. Providing necessary power infrastructure, including DG sets, an Electric Substation, Transformers with foundations, pumps, and Control Panels. Testing,Commissioning, and Handover Completing successful testing, commissioning, and a 3-month trial run of the facilities. Handing over all completed works to the concerned department/Urban Local Body (ULB). Coveringa defect liability period of 12 months for Civil works and 24 months for E&M works.
Augmentation of Water supply , Sewerage , Drainage System and Street Lightening in Village Sihi, Faridabad in Ward No 39 (Recall)
Cost of Construction of Sewage Treatment Plant including Tertiary Treatment
REPLACEMENT OF EXISTING LT OH CONDUCTOR TO UG LT XLPE CABLE, LT PANEL FEEDER PILLAR WITH CONNECTED ITEMS IN BLDG. NO P-7 TO P-11, P-18 TO P-21, P-59, P-60, P-61 TO P-72, P-222, P-447 AND STP MD ACCN AT JAK LI RC SRINAGAR UNDER GE 970 EWS
S&F of LT feeder pillar compartmentalised cubical outdoor type Floor mounted suitable for , 415 volts 3 phase, 4 wire,50 HZ AC supply system having bus bar chamber with insulated aluminium bus bar of rating 400 Amp installed on proceline/ SMC insulator. The panel should be dust and vermin proof IP -65 class protection and made of 3.15 mm CRCA MS sheet and 50X50X6 mm thick MS angle iron frame work, powder coated finesh over one coat of red oxide on out side surface and painted in side with two coated of red oxide primer and rear opening type with apran for cable entry, closing locking arrangement including internal wiring with PVC insulated solid copper conductor FRLS cable IS 694 marked , 1100 volts grade of appropriate size and comprising of the following including necessary PCC platform of suitable size.(Loc :- Near STP) INCOMING:- (i) MCCB 4 pole , LT 415 Volts, 50 Hz AC grade of 250 Amps rating 36 KA rupturing capacitiy with adjustable Themal and Meganetic setting releases - 01 No. (ii) Digital Voltmeter 0-500 volts, square, 96 mm,flush pattern with 3 way selector switch - 01 No (iii) Digital Ammeter 96mm x 96 mm, flush pattern with 3 way selector switch - 01 No. (iv) 3 Nos of CTs of ratio 250/5 copper wound, Class 1.0, 10 VA – 1 Set (iv) Indicating lamps R,Y and B Phase : 01 set of three OUTGOING (i) MCCB 4 pole , LT 415 Volts, 50 Hz AC grade of 100 Amps rating 25 KA rupturing capacitiy with adjustable Themal and Meganetic setting releases, - 02 Nos. (ii) MCCB 4 pole , LT 415 Volts, 50 Hz AC grade of 63 Amps rating 25 KA rupturing capacitiy with adjustable Themal and Meganetic setting releases, - 02 Nos. (ii) MCCB 4 pole , LT 415 Volts, 50 Hz AC grade of 40 Amps rating 25 KA rupturing capacitiy with adjustable Themal and Meganetic setting releases, - 02 Nos.