Loading…
Loading…
17,415 results • Best match
sewerage network in recently merged 11 No. villages in MC area, Construction of 2.00 MLD Sewage Treatment Plant at existing STP Nayagaon, Construction of 2.00 MLD Sewage Treatment Plant for village Kanwla and 60.00 MLD Sewage Treatment Plant
Sewer line installation and Pressure pipe installation Installation of HEPE product pipe by HDD method for on grade gravity sewer including preparing and setting up the plant and equipment, preparing new pipe - work material, making of entry and exit pits upto 3 meter depth, installing new pipe - work and commissioning system or making the system ready for commissioning by HDD operating including, all related civil and mechanical works like excavation, shoring / strutting, etc. drilling, stringing, reaming and pulling back the new pipe - work on the desinged bore path alignment, proper disposal of drilling fluid and back fill of site after completion all inclusive as per IndSTT : 101-2018: Code of Practice for Horizontal Directional Drilling Technique Suiting Indian Conditions. ` Generic Definition : The work involves installation product pipe of HDPE using Horizontal Directional Drilling (HDD) technique to the required grade and alignment using appropriate drilling rig, drilling tools, product pipes, using appropriate drilling fluid including disposal of drilled muck, separation of drilling fluid as necessary etc. Generic Deliverables : By employing the HDD technique following outputs can be achieved: o Creation of a stable tunnel in the ground under a difficult crossing in which installation work of product pipe of water supply, sewerage, telecom duct or gas transmission etc. can take place. o With special attachments installation of pipes in correct grade and alignment. o Creation of boreholes for extraction of groundwater from mountainous regions o Creation of boreholes for environmental protection activities. HDPE Pipes 225 mm Outer Dia.
sewerage network in recently merged 11 No. villages in MC area Construction of 2.00 MLD Sewage Treatment Plant at existing STP Nayagaon Construction of 200 MLD Sewage Treatment Plant for village Kanwla and 60.00 MLD Sewage Treatment Plant
sewerage network in recently merged 11 No. villages in MC area Construction of 2.00 MLD Sewage Treatment Plant at existing STP Nayagaon, Construction of 2.00 MLD Sewage Treatment Plant for village Kanwla and 60 MLD Sewage Treatment Plant
Providing and filling BIO Media Anox Kaldnes series K3 MBBR media having specific surface area of 500 m2/m3 of media volume complete in all respects in the following STP`s.5.00 161 Baldev Nagar Unit I ( Year of Commissioning - 2010) Baldev Nagar Unit II ( Year of Commissioning - 2016) Moti Nagar Unit I ( Year of Commissioning - 2013) Moti Nagar Unit II ( Year of Commissioning - 2016) Naya Gaon Unit I ( Year of Commissioning - 2015) Naya Gaon Unit II ( Year of Commissioning - 2011) Naseerpur ( Year of Commissioning - 2016) Model Town ( Year of Commissioning - 2012)
sewerage network in recently merged 11 No. villages in MC area, Construction of 2.00 MLD Sewage Treatment Plant at existing STP Nayagaon, Construction of 2.00 MLD Sewage Treatment Plant for village Kanwla and 60.00 MLD Sewage Treatment Plant
Comprehensive maintenance contract of the Sewage Treatment Plant STP, Water Treatment Plant WTP, Effluent Treatment Plant ETP and RO Plant at M.R. Bangur SSH and Metiabruz SSH Package D 3rd call
TENDER DOCUMENT FOR INTERCEPTION and DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR SHADORA TOWN
1. Design and build 1 Nos. sewage treatment plant of installed capacity 0.8 KLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 1.330 Km length which includes Pumping Main Comprising of DI-K7 class pipe of 150mm diameter having length of 430m & Gravity Main Comprising of RCC NP3 Pipe of 500 mm diameter having length of 900m, Construction of 1nos. I&D Structure at Nallah and Construction of Screen Chamber, Construction of 1 no. Intermediate Pumping station having capacity 0.8 MLD & Strengthening of drain having length 145 m including survey, design and all appurtenant structures and allied works; and