Loading…
Loading…
17,420 results • Best match
PROVISION OF SEWAGE TREATMENT PLANT STP AT ICGS VADINAR
SEWAGE TREATMENT PLANT AND COMPREHENSIVE MAINTENANCE AND OPERATION: (Comprising of Item No 1.00 to 1.07 in Phase-I & II) PHASE-I : (ITEM No. 01.00 to 86.00 except item No 1.06 & 1.07) Design, supply, construction, installation, testing, commissioning and comprehensive maintenance and operations of the STP for 10 years after completion of fully advanced automatic Sewage Treatment Plant of 180 KLD capacity based on MBBR technology and process with three process streams of 60 KLD each for part operation of plant with tertiary treatment complete based on following parameters and including all civil and electrical works after end of sewage line till end of tertiary treatment and including the raw sewage collection tank and treated water storage tank complete all as specified here in below and in particular specifications and as directed. (a) The raw sewage to be treated shall be domestic sewage. The characteristics of raw sewage and treated sewage shall be as below:- Parameter Raw sewage characteristics Treated sewage characteristics pH 7.6 to 7.9 6.5 to 8.3 TSS 460-590 mg/L 10 mg/L BOD 5 at 20°C 350-540 mg/L 10 mg/L COD 520-850 mg/L 50 mg/L Oil and Grease 20-30 mg/L 10 mg/L Total Nitrogen (as N) 83-105 mg/L ≤10 mg/L Total Phosphorus 35-39 mg/L 1 mg/L Faecal coliform - Nil Odour Actual No Foul Odour
Maintenance and repair of flowmeter and sterilizer at Sewage Treatment Plant, Barshi Kurduwadi and Chandani water supply scheme
Annual maintenance charges for Analyiser at STP
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR BIJAWAR TOWN
1. Design and build sewage treatment plant of installed capacity 1.3 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs including survey, design, Providing , Supplying, erection and construction of 1 No. of Pumping stations and all appurtenant structures and allied works; 3. Providing, laying, jointing, testing, commissioning of (i) Sewage pumping main of DI K-7 pipe having length of 1600 m of dia 80 mm and DI K-7 pipe having length of 1365 m and dia 150 mm (ii) Treated water pumping main of DI K-7 pipe having length of 52 m of dia 150 mm and from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete. 4. Treated Water Sump with Pump House 5. Providing , Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipments and fittings complete in all respect
Facility Management Service- Manpower based (Version 2) - Industrial; Operation of pumps, sewage treatment plant, water treatment plant & routine checking, cleaning and arresting leakages of foot valve, operation of gate valves at different levels of..
sewage treatment plant
Interception and Diversion for tapping nallah and setup of sewage treatment plant for Used Water Management of Kukshi Town 3rd call
1. Survey, review the designs, Construction of I&D work (solid waste trap) , I&D Work for connect drain to SPS and RCC drains. 2. Nallah Dressing, Cleaning of identified nallahs in town. 3. Providing Slope Protection, Provision for protection against major flooding in 2 primary drains (3.5 m wide, 88 m long along both sides each) prior to point of convergence. 4. Providing Interception Structure, catch basin based interception of main nallah. 5. Providing Screens, For segregation of solid waste. 6. Design and build 1 NOS Sewage pumping Station of installed capacity Peak Flow 1 Hr. Detention and all appurtenant structures and allied works. 7. Design and build sewage treatment plant of installed capacity 3.5 MLD using Rotating Media Bio Reactor (RMBR) and all appurtenant structures and allied works. 8. Force Main: 1500 m, 300 mm DI K9 9. Electrical Arrangement At SPS & STP 2 Nos. Transformer (One each at STP & SPS) ; 2.3 Km cumulative 33 KV HT Line 10. Providing Solar Plant of 100 KW. 11. STP Land Boundary wall 125m length, 7 feet height
sewerage network in recently merged 11 No. villages in MC area, Construction of 2.00 MLD Sewage Treatment Plant at existing STP Nayagaon, Construction of 2.00 MLD Sewage Treatment Plant for village Kanwla and 60.00 MLD Sewage Treatment Plant
SEWERAGE TREATMENT PLANT (2.00 MLD) a) Design, construction, erection, testing and commissioning of 2.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping, MCC Panel Room, all other contingent ie. Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS at STP including furniture and laboratory equipments and following components. b) Supplying and installation of 2 Nos. (1W plus 1S) Fine screens of suitable size along with screw conveyor for 2.00 MLD average flow with peak factor 2.25. c) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED suitable size, outdoor type energy efficient lamps on each pole, 20 no. LED outdoor light with 7 m. high GI pole along road / path including all accessories complete in all respects. d) Supply and installation of 1 No. 6.00 m wide Main Gate of MS and 1.80 m. wide wicket gate at STP to the entire satisfaction of Engineer-in-charge and as per the design. e) Providing and installing 2 No. centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentation, electric panel board etc. as per design complete in all respects as per the design and direction of the Engineer in charge.