Loading…
Loading…
20,858 results • Latest
Urgent roof treatment works of C1 Block by application of P U Roof coat in Bidhan Sishu, P.H.E. during the year 2024-2025.
Repairing and painting of 04 nos. officers Quarters at NSATI, Block FC, Sector-III, Salt Lake, Kolkata -700106 during the year 2024-2025.
Repairing and renovation of entire Boundary wall (489.00 Mtr.) and guard rooms, Erection of decorative main gate and security enclosure, refitting of RBT at required places and repairing of damaged road at Shymali Housing Estate, Salt Lake
Provision for motor bike parking shed insdie of stack yard premises of Purta Bhavan during the year 2024-2025.
Land Scaping work near entry points with supply and maintenance of plants at different floor under School and Higher Education Department of Bikash Bhavan, Sector-I, Salt Lake City, Kolkata-91 during the year 2024-2025.
Special Repair and Renovation of block no. O1, O2, P1, P2, Q1, Q2, R1, R2, S1, S2, T1, T2, U-(13 Nos) at Shymali Housing Estate, Salt Lake, Kolkata-64-Through outside repairing including plinth protection and painting during the year 2024-2025.
P.C.C. WORK OF CONCRETE ROAD FOR THE FOLLOWING LOCATION IN WARD NO.12, PART NO. 68 UNDER APAS WITHIN HALISAHAR MUNICIPALITY LOCATION. H/O GANESH BISWAS
CONSTRUCTION OF CONCRETE ROAD OF BIVA ADHIKARY TO PARIMOL CHAKRABORTY AT WARD NO. 1 AND BOOTH NO 12 UNDER HALISAHAR MUNICIPALITY
CONSTRUCTION OF DRAIN AT BOOTH No 22, WARD NO. 04, LOCATION CONSTRUCTION OF DRAIN AT BOOTH No 22, WARD NO. 04, LOCATION FROM PURNIMA BARUYA TO BIZPUR WORKSHOP ROAD WITHIN HALISAHAR MUNICIPALITY.
Manufacturing ,Testing, Supply and Delivery of 250KVA Distribution Transformer
Additional Earthen gallery, external fishing including mural and painting work at Vivekananda Yuba Bharati Krirangan, Salt Lake, Kolkata during the year 2024-2025.
SUPPLY AMBULANCE FOR HALISAHAR MUNICIPALITY.
Manufacture, testing, supply and delivery of Oil Cooled Distribution Transformers
SUPPLY FLUORESCENCE IMMUNOASSAY ANALYZER MACHINE FOR HALISAHAR MUNICIPALITY
De-silting of Canal-A from DPS at City Centre-II (CC-II) to Ram mandir at Action Area-II, New Town.
Manufacture, testing, supply and delivery of EHV Grade Transformer Oil conforming to IS_335-2018
De-silting of Canal-B from back side of Malancha to Eden Court at AA-II, New Town.
Supply and Delivery of LT DISTRIBUTION KIOSK for 63 KVA DTR
Manufacture, testing, supply and delivery of G.I. Wire and G.I. Stay Wire
Construction of Concrete Road from Abusiddik Sekh House towards Abukalam Sekh
Supply of Chemical Glassware at Mangal Pandey Water Testing Laboratory under office of the Executive Engineer, North 24 Pgs. W/S. Division-I, PHE. Dte.
Manufacture, testing, supply and delivery of G.I. Wire and G.I. Stay Wire of different sizes
ASCERTAIN THE RATE OF LOW TEMPERATURE PIGMENT FREE HOT MELT BOOK BINDING ADHESIVE
Internal finishing work of Hocky Stadium at Vivekananda Yuba Bharati Krirangan, Salt Lake, Kolkata during the year 2024-2025.
Urgent Repair and Restoration of Potholes and Damage Road Surfaces at Various Locationns within Dum Dum Municipality during Monsoon period in ward no.10 of Dum Dum Municipality ( Rate based on NH Schedule of Rates 2019-20)
Patch work and Pot holes repairing at W. No. 18 (different places) of Dum Dum Municipality ( Rate based on NH Schedule of Rates 2019-20)
Car parking near Training Ground 1 and 2 at Vivekananda Yuba Bharati Krirangan, Salt Lake, Kolkata during the year 2024-2025.
Annual Maintenance of Electrical and allied installation with provision of materials and manpower at Barasat Govt. College, Barasat, North 24 Pgs.-- AMC of E.I. work for the period of 01 (One) year.
Urgent Repair and Restoration of Potholes and Damage Road Surfaces at Various Locationns within Dum Dum Municipality during Monsoon period in ward no.17 of Dum Dum Municipality ( Rate based on NH Schedule of Rates 2019-20)
Separate entry gate and internal pavement work near Training Ground 1 and 2 at Vivekananda Yuba Bharati Krirangan, Salt Lake, Kolkata during the year 2024-2025.
Urgent Repair Damage Road Surfaces at Pulin Avenue( Starting from Narayan Villa to H/O A.Chackraborty and infront of Sonali Apartment within Dum Dum Municipality during Monsoon period in ward no.4 of Dum Dum Municipality (based on NH Schedule 19-20)
Operation and Maintenance of Iron Elimination Plants at Berachampa Zone-I Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Operation and Maintenance of Iron Elimination Plants at Berachampa Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
LINE INTERACTIVE UPS WITH AVA AS PER SPECIFICATION
Day to day repair, Operation, Maintenance of Distribution Syste, rising main and allied pipelines including FHTC connection (CI /DI / UPVC /HDPE /GI, valves, valves chambers, stand posts in Humaipur Water Supply Scheme scheme under Barasat Sub Div
MAINTENANCE OF 02 NOS. PASSENGER ELEVATOR CARRYING CAPACITY MAX. 08 PERSONS-544 KG PER LIFT AT BHEL-PSERS KOLKATA OFFICE FOR THREE YEARS.
Facility Management Service- Manpower based (Version 2) - Commercial, Residential; Housekeeping Security Services; Unskilled, Residential; Housekeeping; Unskilled, Residential; Housekeeping; Skilled
Emergent Fitting Fixing of overflow line of 30 Nos. 5000 lit. capacity Overhead PVC Tank 10 Places under Vivekananda Yuba Bharati Krirangan, within the jurisdiction of Barasat Sub Division under Barasat Division, P.H.E. Dte.
Construction of Cement Concrete Road with Drain from Yubak Sangha to House of Bishnu Kundu under Bilkanda-I GP under Barrackpore-II Panchayat Samity
engagement of road transport contractor for West Bengal State Seed Corporation Ltd. WBSSCL, Barasat, North 24 Prgs District Unit offices for transportation of different types of seed and other agricultural inputs
Construction of Cement Concrete Road from Land of Najibul Sheik to Pirtala Math in Mouza Mastikari and Padmerhaat , G. P. Dakshin Barasat, Block Joynagar I under Bishnupur Sub-Division of Civil Engineering Division No.I
Manufacture, testing, supply and delivery of G.I. Wire and G.I. Stay Wire
Network Attached Storage (V2) (Q2)
Repairing of Black Top Road in Different Area W. no. 21, 22 under Dum Dum Municipality, Rate based on PWD (Rds) NH Wing
Plumbing and Pipeline Work at Kundubagan RadhaKrishna Mondir ward 16,Babiana Angwanwari School ward 03, Ward Office of ward 16.
SITC of UPS system for SNCU OT ANW and Battery replacement of UPS for SNCU OT and Antenatal ward for emergency back up power And replacement of old batteries for the UPS installed at CCU and USG department of Basirhat DH, Basirhat HD.
Operation Maintenance of CI /DI / HDPE / UPVC / AC /GI Rising Main Distribution System for Bodai Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Repairing of Black Top Road in Different Area W. no. 15,16 under Dum Dum Municipality, Rate based on PWD (Rds) NH Wing
Urgent Electrical installation works and repairing of faults at Govt. ITI-Halisashar running under PTP under Nodal ITI Barrackpore.
Operation Maintenance of CI /DI / HDPE / UPVC / AC /GI Rising Main Distribution System for Chandrapur Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.