Loading…
Loading…
6,984 results • Latest
Installation of submersible with water tank at Nandamohanpur Mete para at Baruibera
Installation of submersible with water tank at Kundapukarini Ruidaspara
Excavation of WHS at Lapuria Mouza- Lapuria, J.L. No.-02, On Plot No- 949,879,952, G.P-Mankanali, Block-Bankura-II, Bnakura, of NRM activity under WDC-PMKSY 2.0-Bnk-01-2021-22.
KITCHEN SHED CONSTRUCTION AND BUILDING REPAIRING OF UPORPARA ICDS CENTRE
Renovation of 33 kV Switchyard and water drainage system near the 11 KV outgoing isolator Structures , Control Room Building painting along with other tit-bit maintenance at Indpur sub-Station under Khatra (D) Division
NIT-145 Installation of Solar Submerisible Pump at Bansgara JFMC of Patrasayer FMU under Bankura (North) DMU.
CONSTRUCTION OF DRAIN AT KUMORPARA ICDS CENTRE
Installation of submersible with water tank at Banprulia ICDS
Construction of cable trench, 11 KV OG switchyard, installation of chequered tiles on pathway and other tit-bit maintenance work including painting of CRB and Boundary wall at Kamalpur SS under Bankura (D) Division
NIT-144 Excavation of New Pond at Vedua JFMC of Beliatore FMU under Bankura (North) DMU.
Supply of Day-Old Layer Parent Chicks at Ranjitpur, Saltora, Dist.-Bankura, PIN-722158 under West Bengal Livestock Development Corporation Limited, LB-2, Sector-III, Salt Lake City Kolkata -700106 for the year 2026-27.
Installation of submersible with water tank at Tetultola Pan Pukur south side at Ranpur
Installation of submersible with water tank near Rabi Karati house at Ranpur
NIT-143 Excavation of New Pond at Siara JFMC of Beliatore FMU under Bankura (North) DMU.
Custom Bid for Services - Overhauling related work/job such as de-watering, desludging, cleaning of NDCT basin, re- fixing & re-installing of Splash V- bar with necessary erection of Scaffolding/Movable platform as required, cleaning of nozzles etc .. Similar Category Repair and Overhauling Service
Installation of submersible with water tank at Deria east bagdi para near Shanta bagdi house at Deriapur
Installation of submersible with water tank near Banparulia Azad Sangha
NIT-142 Excavation of New Pond at Natungram JFMC of Beliatore FMU under Bankura (North) DMU
REPAIRING OF KUMORPARA ICDS CENTRE
Construction of drain at Udainagar Adibasipara tematha towards Forest
REPAIRING OF CHARKI ICDS CENTRE
2 NOS SOLAR LIGHT AT DAHIGORA VILLAGE
Construction of drain from Sanat Pal house to Asim Pal house at Nischintapur
NIT-141 Excavation of New Pond at Chandaidanga JFMC of Beliatore FMU under Bankura (North) DMU.
Construction of drain fromk Prabir Sutradhar house towards Joydeb Chatterjee house at Kundapuskarini
2 NOS SOLAR LIGHT AT KHEJURBEDYA VILLAGE
TOILET REPAIRING AND KITCHEN REPAIRING OF KHEJURBEDYA PRIMARY SCHOOL
Construction of Drain from Ganesh Ghosh house To Battola at Sonadwipa
REPAIRING OF INDRAJHORE ICDS
Construction of drain fromk Dilip Lohar house to Mathur Lohar house at Kundapukarini
REPAIRING OF BANAKHARANG ICDS
NIT-140 Excavation of New Pond at Badhkona JFMC of Beliatore FMU under Bankura (North) DMU.
SEAMLESS PIPE, SIZE 25NB, SCHEDULE 40, MATERIAL MS, SEAMLESS PIPE SIZE 40 NB, SHEDULE 80, MATERIAL MS, MS Seamless Pipe, Plain end, Size- 65mm, SEAMLESS PIPE SIZE 80NB, SHEDULE 40, MATERIAL MS, SEAMLESS PIPE SIZE 80NB, SHEDULE 80, MATERIAL MS, SEAMLESS PIPE SIZE 100NB, SHEDULE 40, MATERIAL MS, SEAMLESS PIPE SIZE 100NB, SHEDULE 80, MATERIAL MS, MS Seamless Pipe, Plain end, Size- 125 mm, M.S. Seamless Pipe, Nominal Diameter 150 mm, Thickness 7.11 mm, Schedule-40, SEAMLESS PIPE SIZE 150NB, SHEDULE 80, MATERIAL MS, Carbon Steel Black Seamless pipe. Grade- ASTM A 106 Gr., G I PIPE SIZE 32 MM OR 1 1by4, NB 40 mm ERW Carbon Steel GI Pipes, NB 50 mm ERW Carbon Steel GI Pipes, NB 65 mm ERW Carbon Steel GI Pipes, 150NB 90 DEG. SHORT RADIUS MS BEND, SCHEDULED 40, pipe flange as per BS 10, Table-E, OD- of pipe 141.3, OD of flang, Seam less mild steel pipe bend 900 Class Medium Schedule 40 Nominal bore 100 mm bevel end, 45 degree Short Bend for 150mm NB pipe, Material Alloy Cast Steel, 90 degree Short Bend for 100 mm NB pipe, Material, 90Degree Heavy Duty Elbow for 65NB MS Pipe, 90Degree Heavy Duty Elbow for 80NB MS Pipe, MS heavy duty 90 deg. elbow size-125 NB, MS BEND WELDED END SEAMLESS, SCHEDULE 40 SIZE -1 ANGLE 90 DEGREE HEAVY DUTY, LONG BEND, 90Degree Heavy Duty Elbow for 50NB MS Pipe, Union, Size 1by2, Material GI Bid Number : GEM/2025/B/6584820 Dated : 20-08-2025 Bid Document 1/31
NIT-137 Construction of Community Hall at Gopinathpur JFMC of Beliatore FMU under Bankura (North) DMU.
Drain from Banka Chowdhury Khamar to Shankar Das house at Nischintapur
Construction of concrete road from Masjidtola towards Bapan house at Panasole
CC Road from Lalta Chowdhury house towards Netaji Club at Uttar Bora
CC Road from Bhoro Ankure house towards Biswanath Ghosh house at Nabasan
SOLAR LIGHT AT MADHUPUR NEAR MATHUR MURMU HOUSE
SOLAR LIGHT AT MADHUPUR NEAR AVINASH HANSDA HOUSE
SOLAR LIGHT AT MADHUPUR PANCHUDI
SOLAR LIGHT AT TENTULDANGA NEAR TUBEWELL
SOLAR LIGHT AT MADHUPUR NEAR CLUB GHAR
SOLAR LIGHT AT BANAKHARANG CHARANDI BELTALA
CC Road from Sudhir Ghosh house towards Nandamohanpur main road
SOLAR LIGHT AT BANAKHARANG SHIBTHAN
CC Road from Subodh Ghosh house towards Shyamal Mondal house at Saldaha
SOLAR LIGHT AT BANAKHARANG NEAR NAKUL MURMU HOUSE
SOLAR LIGHT AT BANAKHARANG PRABIR MURMU SHOP
SOLAR LIGHT AT INDRAJHORE SADHUGRAM NEAR SUKLAL SAREN HOUSE