Loading…
Loading…
2,648 results • Latest
Carrier Quad Cable (CQC) as per (CRPF) QRs (Q3) (3 (3 ))
Nucleic Acid Sequencing and Genotyping Service - DNA sequencing; Plant; Leaf; To be collected by the service provider from the buyer; Illumina, Pac Bio; 95% and above; 100x; High throughput; Raw data, Primary analysis, Secondary analysis; Physical me..
Renovation
Renovation
Consultancy
Renovation
Renovation
Renovation
Macadamization of link road from main bridge to the house of Hilal Ahmad Dar village Nowbugh.
Sheikh Dawood Colony road sector ANB at B.K.Pora including Ibrahim Lane.
Inner roads at Town Chadoora.
Wathoora Bonhar road last Km at Bonhar.
Upgradation of Narpora Alamkote road (Remaining portion)
Upgradation of inner links at Hayatpora/ Takiya Hayatpora.
Gowharpora Khanda road via Sanzipora
Inner links at Kaisermulla.
Upgradation of link road from main road to Mukdam Mohalla at Wanpora (near Qazipora).
Pigtail SC 5 Mtr, Pigtail LC 5 Mtr, Connector LC 0db, Insulation Tape, Amplifier Cable Mono type, Camera Cable 20 Mtr, Camera Cable 15 Mtr, Audio cable for speaker 100 Mtr, Earthing Cable, Speaker Cable 15 Mtr, HDMI Cable 30 Mtr, Mono Cable 1.5 Mtr for collar mic, Dual band WiFi Router, Hard Disk SSD 512 GB, RJ 45 Connector, T Echo Meshtastic WiFi wireless module
Passenger Seat for State Road Buses (Q3)
Bullet Proof Wind Shield Glass, Glass Frame, Lock Nut with Bolt, Frame Work, Flat Rod for Frame Work
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 260 hours; Local, Monthly Basis Cab & Taxi Hiring Services - Premium Sedan; 1500 km x 260 hours; Local
Cleaning, Sanitation and Disinfection Service - Outcome Based - Healthcare; Deep Cleaning; Indoor
DESIGN AND DEVELOPMENT OF AUTONOMOUS DRONE WITH LIDAR MAPPING (NON-CORRS)
LIBRA ANT, MOSFET 28100V, RA 30H 1317, LEO RF CABLE
Construction and Maintenance of L041 (Link Road) L047 Magam Beeru Budgam Road Km 17th to Sechin Complete Package No JK02-4012, Length 1.50 KM Carriage way width- 3.75 m Under PMGSY IV, Batch I, FY 2026-27, Block Beerwa PMGSY Division Budgam
Construction and Maintenance of from L045(Link Road) Shunglipora Sochalpathri Km 2nd to Lone Mohalla Shunglipora Complete P.No Jk02-4020, L.1.68 KM Carriage way width- 3.75 m Under PMGSY IV, Batch I, FY 2026-27, Block Khag PMGSY Div Budgam
Construction and Maintenance of from L035-(Link Road) ChariSharief -Yousmarg Rd Km12th RD 350 to Ahangar Mohalla Complete P. No Jk02-4017 L. 1.51 KM Carriage way width- 3.75m Under PMGSY IV, Batch I, FY 2026-27, Block Pakherpora PMGSY Div Budgam
Construction and Maintenance of Link Road from L050-(Link Road) L030 Km 5th to Punjabi Mohlla Complete Package No JK02-4021, Length 1.55KM Carriage way width- 3.75 m Under PMGSY IV, Batch I, FY 2026-27, Block KhanSahib PMGSY Division Budgam
Spark Plug, Kick Starter, Gear, Handle Door Catch, Coolant Hose Pipe, Pipe Assy Fuel Line, Rubber Hose, Field Coil
Manpower Outsourcing Services - Minimum wage - Semi- skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Admin
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2) ( ( 3 3 ))
Chain link fencing of camping site near Raikote and Cafeteria near Jamia Masjid at Yousmarg
Repair and Renovation of Swami Nand Lalji Ashram Hoshru Chadoora
Development of Chowkidar Quarters at Yousmarg, Furniture and furnishing along with Sinages for various assets at Yousmarg
Repair and Overhauling Service - Diesel Generators- Dg Sets (DFM); Mobile Air Charging Vehicle 350; Yes; Buyer Premises
Development and beautification of Darwan Basti at Yousmarg
PROCUREMENT OF RADIO SET STARS V MK II SPARES
engine
Repair and Overhauling Service - Diesel Generators- Dg Sets (DFM); UGSS N2 Nitrogen Generation Storage and Distribution System; Yes; Buyer Premises
Renovation