Loading…
Loading…
1,113 results • Latest
Construction of an RCC drain from Ashok Kumar house to the Sant Nagar drain on Phulwadi Road, Ward No. 19.
Construction of an RCC drain and a CC road in Ward No. 19, Sant Nagar from Premchandra property to Sarvesh Kumari property, near the Om Nagar culvert.
Construction of an RCC drain and a CC road from Rajendra Bohre shop to Rahman Bhai place in Ward No. 39, Chhoti Chhapeti locality.
Hopper Tipper Dumper for Garbage (Q2) (3 (3 ))
Hiring of Professionals for Application Development and Maintenance - Signalling system; railway signalling system; 9 years and Less than 12 years
90mm quick coupled polyethylene pipe (HDPE Pipe) & fitting sets conforming to IS 17425: 2020
110 mm quick coupled polyethylene pipe (HDPE Pipe) & fitting sets conforming to IS 17425: 2020
Unplasticized Polyvinyl Chloride (PVC - U) Screen and Casing Pipes for Bore/Tubewells (V2) as per IS 12818 (Q2) ( ( 3 3 ))
Unplasticized Polyvinyl Chloride (PVC - U) Screen and Casing Pipes for Bore/Tubewells (V2) as per IS 12818 (Q2) ( ( 3 3 ))
Unplasticized Polyvinyl Chloride (PVC - U) Screen and Casing Pipes for Bore/Tubewells (V2) as per IS 12818 (Q2) ( ( 3 3 ))
Periodical Service and Minor Maintenance of Type-3,4 and 5 Qtrs. at OEFHz
Construction of 500 KLD STP and associated works for Awas Yojana Urban at Usaini Firozabad
Facility Management Services - LumpSum Based - SUPPLY WITH INSTALLATION OF RO DRINKING WATER COOLER; MAIN 02 PUBLIC PLACE AT NP JASRANA; Consumables to be provided by service provider (inclusive in contract cost)
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation, Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Outstation, Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation, Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Outstation
Integrated development and upgradation work from Kakrau Kothi Junction to Sailayi Puliya Junction
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
RCC Drain from Tadon Wali Bagiya Road Chauraha to Existing Circular Road Drain Near Rasoolpur Thana Chauraha, Firozabad.
Drain repair and CC construction work from Raju Dukanwali to M.R. Public School in Ward No. 06, Azad Nagar.
Construction of an RCC drain and CC road in Ward No. 55 Baghdad Nagar, Lane No. 2 from Tau house to Shaukat Chaudhary house and in Nagla Kothi from Lalla house to Parvez house.
Construction of an RCC drain and CC road from Vinod house to Prashant house in Ward No. 10, Kailash Nagar.
Construction of a CC road and repair of drains in Ward No. 28 Humayupur II from Mahendra Rathore place to Rameshwar place, and from Jawahar Singh house to Chuchu place.
Construction of a boundary wall at Ambedkar Park under Ward No. 18, Mau Basath.
Construction of an RCC drain and a CC road in Ward No. 34, Shriram Colony (in the lane near Viresh Sharma house the temple under construction).
Construction of a CC road and RCC drain in Ward No. 55 Ajmeri Gate in Gali No. 5 from Haji house to Ishub house and in Gali No. 8 of Mohalla Nagla Kothi, from Aas Mohammad house to Shamsher house.
Road improvement work using CC and drain repair from Lane No. 2 Chhotelal lane to the Dharamshala and Kashiram and Narsingh Pal Singh, Suresh Chandra, Amrender Kumar Verma and Jagdish, Tarachand and Dharmendra in Ward No. 10, Nagla Karan Singh.
Drain repair and CC road construction work in Ward No. 50 Mohammadganj from Shahid Manager to Ayub Bhai, the lane near Advocate Mohsin Khan, the route via Dr. Usman and Babbu Bhai to the lanes of Suhan Ali and Baqar Ahmed, and the link lane.
Ward No. 46, Badi Chhapeti Drain repair and CC road construction work from Appu house to Sanjay house.
Construction of RCC drains and CC roads in Lane Nos. 1 and 2 of Tado Wali Bagiya Ward No. 55 spanning the stretch from Rashid alias Dablu to Abdul Khalid alias Raja Qureshi.
Construction work for drain repair and a CC road in Ward Nos. 57 and 59 Qadri Masjid Road area, spanning from Sabbir ki Taal to Rizwan Halwai shop.
Construction of an RCC drain and a CC road in Ward No. 40 Harikishan Puram spanning the stretch from Ramkumar Gupta place via Sunil to Porwal Ji and in Katra, along the lane known as Wasim Bhai Wali Gali.
Construction of an RCC drain and a CC road in Ward No. 19, Sant Nagar, stretching from the lane near Keshav Fauji house, past Chaudhary house, up to Radha house.
Construction of an RCC drain and CC road in Ward No. 63, Momin Nagar (Naini Road), from Sandali Masjid to Nasreen house.
Construction of a CC road and repair of the drain in the lane of Ward No. 61, Madina Colony, stretching from Bablu house to Aslam Tar Wala house.
Road improvement work involving drain repair and CC surfacing in Ward No. 64 (Holi Wali Bhatti Wali Gali), covering the stretch from Majid to Savir, Farman to Jamil, Haji to Ansar, Mobina to Akram, and Nazim to Madari.
Construction of a CC road and drain repair work from Tasleem house to Azam house in Tower Wali Gali (Madina Colony, Ward No. 61), and from Ahsan Sahib house in Gali No. 4 to Kohinoor Road.
Work related to the supply of various types of lubricants for vehicles in the workshop department.
Drain repair and road improvement using CC in Ward No. 03, Jagdamba Nagar specifically on Lane No. 03 from Mahavir Singh Fauji house to Anil Master Ji house, and from Chintaharan School to Ashok Kumar house.
Construction of an RCC drain and a CC road from Virendra Yadav place to Hariom Gupta place in Ward No. 19, Kanhaiya Nagar.
Drain repair and road improvement using CC from the temple to Aagashahab Mosque in Ward No. 67, Mohalla Hajarpura.
Drain repair and road improvement work using CC in Ward No. 59, Noor Nagar in Lane No. 25, from the house of Rafiq Mohammad to the house of Rahoof Qureshi.
Improvement work involving RCC drains and CC roads in Ward No. 54 Noor Nagar Lane No. 32 from Farjan Khan to Wasim Bhai, Lane No. 33 from Niyamat Khan to Mubarak Bhai, and Lane No. 34 from Sabir Hussain to Shahid Mohammad.
Construction of a drain and a CC road from Chandrawar Gate Road via Saurabh Halwai to Harishankar, as well as the unpaved lane known as Premchandra Wali Gali in Ward No. 06 Shyam Nagar.
Construction of an RCC drain and a CC road in Ward No. 64, from Dr. Ahmad to Haji Majid.
Drain repair and CC road construction work in Ward No. 51 Lohiyan Wali Gali from Sadar Bazar Road via Pradeep Kumar to Digambar Jain Mandir, and from Sachin Verma to Ashok Jain and from Aamir to Manoj up to the intersection (Chowk).
Construction of RCC drains and CC roads in the unpaved lanes of Ward No. 34, Balaji Nagar from Fancy Babu to Kalicharan, Virendra to Mishri Lal, and Ramsanehi to Prem Niwas.
Construction of an RCC drain and CC road in Ward No. 47, Kishan Nagar, from Shanu Rain place to the house of Gulfan/Aehjad Qureshi.
Construction of an RCC drain and a CC road in Ward No. 49 Moh. Sarai North from the house of Israr Ahmed alias Pappu to the Ek-Minar Wali Masjid.
Road improvement work in Ward No. 65 Mashroor Ganj drain repairs and the construction of a CC road on the stretch from Nado to Rosar Bhai house, from Kalu house to Evav house, and from Sursad to Asim house.
Drain repair work in Ward No. 68 Mohalla Jatavpuri from Vasalla to Mehraj in Hajipura from Iqbal to Babu, Kafir to Farad Pehalwan, Aadil to Mantri, and Bunda Babu and construction of a drain and a CC road in Jatavpuri from Imran to Nishad house.
Construction of a CC road and repair of the drain from Rashid house to Sammu house in Ward No. 68, Mohalla Hajipura.