Loading…
Loading…
1,265 live763 closing this weekmost from GREATER HYDERABAD MUNICIPAL CORPORATION and Department Of Defence Research & Development
1,265 results • Latest
Renovation of Corridor, Conference Hall and adjoining rooms at QCL south block first floor, MIDHANI plant
REPAIR/MAINTENANCE AND REPLACEMENT OF UNSERVICEABLE LT UG CABLES AND LT PANELS INSTALLED AT SCIENTIST HOSTEL, OFFICERS MESS AND PUMP HOUSE AT DRDO TOWNSHIP KANCHANBAGH UNDER GE (I) RND KANCHANBAGH
Supply, Installation and Commissioning of Automatic Water Level Station
Providing of 2nd Alternate Source to 33/11KV Srinagar Colony Indoor SS from 132/33KV NIMS EHT SS by laying of 4.5 km Single Run 33KV 400Sqmm XLPE UG Cable pertaining to Kalyan Nagar Lines Section and Sub Division of Banjarahills Lines Division of SCADA circle and work executed by the Master plan SD-IV Section and Sub-Division of MP-1 Division of Hyderabad Master plan Circle under T and D Improvement Works
Safe Deposit Locker Cabinets conforming to IS 5244 (V2) (Q2) (3 (3 ) )
Providing of 3rd alternate source to 33/11kV Film Nagar Indoor SS by laying of 4.9KM of 33KV 3X400sq.mm XLPE UG Cable (Single Run) from 33/11kV Sandhya SS to 33/11kV Film Nagar SS (Utilizing one cable of Triple Run Cable proposed from 132/33kV Manikonda EHT SS pertaining to Kalyan Nagar Lines Section and Sub Division of Banjarahills Lines Division of SCADA circle and work executed by the Master plan SD-IV Section and Sub-Division of MP-1 Division of Hyderabad Master Plan Circle under T and D Improvements to original works (Reserved for ST Category).
Providing of 2nd alternate source to 33/11kV Kundanbagh Indoor SS by laying of 1.2KM 33kV 3X400Sq.mm. XLPE UG Cable (Double Run) from 33/11kV Green lands SS to 33/11kV Kundanbagh Indoor SS pertaining to Allwyn Lines Section and Sub Division of Banjara Hills Lines Division of SCADA circle and work executed by the Master plan SD-IV Section and Sub-Division of MP-1 Division of Master Plan Hyderabad Circle under T and D Improvements to original works (Reserved for SC Category).
SC-WD Section: SW 1) Lingampally: Construction of New Running Room at LPI with 40 beds. SW 2) Lingampalli: New TTE Rest House with 30 Beds (24-M, 06-F TTEs with separate toilets), ACs, Kitchen, Store, R.O water and Further Provision. SW 3) Lingampalli: Provision CC pathway 200x1.5m from C & W office to station platform, Provision of 4x3 m room for R&D staff on PF 4 & 5 under FOB and Provision of Rolling in huts & lights on PF3 side SC end.
SPECIAL REPAIRS / REPLACEMENT TO LT OH / UG CABLES INCLUDING CONNECTED WORKS AT CERTAIN LOCATIONS AT AFA HYDERABAD
BPQ-KZJ, MAGH-GDCR, PDPL-NZB, KZJ-MTMI, DKJ-MUGR, BDCR-STPL, MTMI-JNPD, PGDP-VUNP, WD-SC, WD-RC, SC-KZJ, SNF-MLY, KHNP-HMBD, VKB-PRLI Sections: Reconditioning of worn out CMS Crossing by using Robotic Welding Machine under Sr.DEN/Co-Ord/SC of entire Secunderabad Division.
SC-KZJ Section: Repairs and improvements to RUB No. 251, 251A & 251B at Km. 194A/25-27 between Secunderabad Jn. and Lallaguda stations.
Procurement of Tablet Devices and Printers for Telangana Transport Department
Design, Supply, Install, Commission, Warrant Support and Maintenance of IP-Based High Definition HD CCTV System in the Cyberabad Police Commissionerate Jurisdiction in a Phase Manner
SC Division: Proposed construction of Limited Height Subway as Precast RCC Box of size 1X2.6X2.60m by Air Pushing Method using 20.4 m RH girder at 1. KM 147/27-29 and 2. KM 148/10-12 between MAGH-WHIRGOAN stations for wildlife crossing under Sr. DEN/North Jurisdiction.
Setting up of 187.5 MW/750MWH(187.5MWX4 Hrs) Battery Energy Storage Systems(BESS) in Telangana under Tariff-Based Global Competitive Bidding(TBCB) at Maheswaram 400/220KV Sub Station of TGTRANSCO with Viability Gap Funding(VGF) Supported through PSDF under “B.O.O” model With 15 Years Tenure.
KZJ - BPQ section: Construction of New Running Room at PRPI with 30 Beds.
REPAIR/ MAINT TO KITCHEN AND TOILETS WITH PLUMBING WORK AND SANITARY FITTINGS IN E TYPE QTRS SH UNDER AGE B/R-II KANCHANBAGH HYDERABAD
SW-I - Manchiryal-Provision of additional facilities at Manchiryal Goods shed. SW-II - Manchiryal - Development of Manchiryal Parcel Office. SW-III - Sig. arrangement in connection with Interlocking of Three (3) number of LC gates (LC. No. 42, 24 & 15) of NZB - PDPL section (construction of Relay hut for LC 15 & 24).
KZJ - BPQ section: Odela - Upgradation of Passenger amenities at Odela Railway Station as per NSG-4 category norms (Building Portion)
CLEANING OF SEWAGE LINES, SEPTIC TANKS, MANHOLES AND REPAIRS TO GATES, CERTAIN FLOORS/ WALLS CHEQURED, INTERLOCKING TILES ETC FOR CE RND AND DMDE AREA UNDER AGE B/R-II SECUNDRABAD
Supply, Installation and Commissioning of Seismograph with 6 Channel 32 bit recorder and Seismograph with 3 Channel 32 bit recorder
KZJ - BPQ section: Uppal-OPL- Improvements to Uppal Goods shed.
TERM CONTRACT FOR ARTIFICER WORKS AT DMRL, ATC DEVATHALAGUTTA, RCMA (MAT) DSC LINE ATC DEVATHALAGUTTA AND PCDA UNDER AGE B/R-II KANCHANBAGH HYDERABAD
REPAIRS/ MAINT OF BLDG SECURITY LIGHTS,STREET LIGHTS,FLOOD LIGHTS, GARDEN LIGHT AND ITS CONNECTED ITEMS AT SERA, VVR, DMDE TRANSIT MESS, PRATAP COLONY, OMBIR COLONY AND CE OFFICE COMPLEX UNDER GE (I) RND KBAGH, HYDERABAD
CERTAIN B/R COMPREHENSIVE MAINT WORKS OF DRDO TOWNSHIP ZONE B AREA AT KANCHANBAGH
REPAIR/ MAINT TO MES INSTALN WITH REPLACEMENT OF SANITARY FITTINGS, FLOORING,PLASTERING,ROLLING SHUTTERS, JOINERIES AND CERTAIN MISC B/R WORKS AT DMRL, ATC DGUTTA, RCMA (MAT), DSC LINE ATC DGUTTA AND PCDA UNDER AGE B/R -II KANCHANBAGH
REPAIR TO EXTERNAL PLASTER, CEILING PLASTER, FLOORING AND CONNECTED WORKS OF CERTAIN D TYPE, F TYPE AND GARRAGE IN ZONE B AREA DRDO TOWNSHIP KANCHANBAGH UNEDR AGE B/R-II, HYDERABAD
MISC REPAIR MAINTENANCE OF ELECTRIC AND WATER SUPPLY INSTALLATION, IMPROVEMENT OF EARTHING INFRA, FLOOD LIGHTING IN VIP AREA AND CERTAIN LOCATION IN BOWENPALLY/ KOMPALLY AREA UNDER AGE EM I OF GE(U) SECUNDERABAD
REPAIR TO LT OH LINE, LT UG CABLE, LT PANELS, STREET LIGHTS AND REPAIR/ RENEWAL OF WATER SUPPLY DISTRIBUTION LINE AND ALLIED WORKS AT CERTAIN UNITS UNDER GE(UTILITY) SECUNDERABAD.
Supply, Installation and Commissioning of Infrasound Sensor/Microbarometer
SC Division: 1. Improvement of reliability for OHE/PSI infrastructure in SC Division- (Stone filling, AMCD and Misc). 2. Provision of Earth filling & stone pitching for OHE foundation near bridges /culverts/curves over SC Division.
Hyderabad Division: 1) Proposed construction of Road Over Bridge (4 lanes on bridge proper and 2 lanes on each arm (3 arms) and LHS in lieu of LC No.27 at Km. 58460.00 m proposed span as 1x43.760 m clear span composite girder and LHS at Km.58357.900 m of size 1x5.00x2.50m (Min. clear height) RCC box (Box pushing & Cast-In-Situ) between Timmapur and Shadnagar Stations - Electrical arrangements 2) SC-DHNE section: Proposed construction of ROB in lieu of existing LC No.90A between WPR and SRNR Stations - Electrical arrangements
PROVN OF 29 X 25 LTRS GEYSERS AND 29 X EXHAUST FANS FOR MD ACCN OF JCOs/OR FOR FY 2026-27 UNDER GE GOLCONDA
Hyderabad Division: 1) Signalling arrangement in connection with Interlocking of LC Gate Nos. 57, 95 &174 on DTP-MBNR, SRNR-GWD & KEK-DAB Section over Hyderabad Division 2) ZRTI/MLY: Development of CBT Lab - Electrical Arrangements
Hyderabad division: Improvements to infrastructure facilities at Railway Officers Club SC (Package-1) - Electrical Arrangements
Hyderabad Division: 1) Construction of RPF Out Post Building with Lock up room, toilets, etc. and 06 Bed RPF Barrack with Furniture at Gadwal- Electrical Arrangements 2) Construction of 10 Bed Female RPF Barrack with Kitchen including Furniture at Kurnool Town- Electrical Arrangements
Six-laning of Hyderabad-Vijayawada Section of NH-65 Section Ch.39.85 to Ch.221.15 (181.30 Km) (Pkg-1) in the States of Telangana and Andhra Pradesh under BOT Mode
Conservancy services for Estate areas of CCE (RnD) South, SA Camp office and Chief Engineer (RnD), Secunderabad
Revolving Chair (V5) (Q2), Executive Table (V4) (Q2), Steel Almirah/Cabinets (V4) (Q2), Wooden Shelf/Case/Rack Credenza/Modular Storage (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No