Loading…
Loading…
4,831 results • Latest
UPGRADATION,REPAIR AND RENOVATION WORK IN EDUCATIONAL INSTITUTIONS
Upgradation of Babbar hall
REPAIRING,MAINTAINANCE AND UPGRADATION OF CEMENT CONCRETE ROAD GUARD WALL CULVERT AND DRAIN
Supplying 01 Non-AC Diesel driven commercial vehicle with driver and valid Contract Carriage Permit on monthly hire basis for official use of the Assistant Engineer (PWD), SCSD-II, Siliguri, for movement within Darjeeling, Jalpaiguri and other etc.
Refined Sunflower Oil (V4) (Defence) (Q3)
SITC of new Split ac machines and allied EI works at office of the Commissioner, Jalpaiguri Division.
Precast Concrete Blocks for Paving as per IS 15658 (Q3) (3 (3 ))
Trg Boards (4x3) for Tech Trg Class Room, Trg Boards (3.5x1) for Tech Trg Class Room, Trg Boards (4x2) for Tech Trg Class Room
Ultra High Power 400 Watt Digital Soldering Station
Calibration Services - PARTICLE COUNT MACHINE; AS PER SCOPE OF WORK; OEM (PAMAS PARTICLE COUNTERS INDIA PVT LTD); Hybrid (detailed in scope of work)
Repair and Overhauling Service - cars; REPAIR OF TATA 3 TON AND ASHOK LAYLAND 6 TON; Yes; Service Provider Premises
UPGRADATION OF KALIPADA SANGHA SSK NET FENCING. PART- 16/11 AT RAMSHAI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCTION OF SOLAR WATER ATM NEAR NAREN ROY HOUSE. PART- 16/07 AT RAMSHAI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCTION OF HUME PIPE CULVERT OVER CHENGMARI RIVER BRIDGE NEAR KAMAL BISWAS HOUSE. PART- 16/05 AT RAMSHAI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCATION OF CC ROAD FROM CHURCH TO SAMSANGHAT PART NO. 20/103 UNDER RUNGAMUTTEE GP MAL BLOCK. Project ID- TW252649167S000
CONSTRUCTION OF CC ROAD FROM UPEN ROY HOUSE TO PUCCA ROAD. PART- 16/20 AT RAMSHAI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCTION OF CC ROAD BIMAL BISWAS TO RAMSHAI GRAM PANCHAYATPART- 16/12 AT RAMSHAI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCATION OF CC ROAD FROM RITA LAMA HOUSE TO 13 NO SECTION PART NO. 20/105 UNDER RUNGAMUTTEE GP MAL BLOCK, Project ID- TW252649157S000
REPAIR WITH RBM PATCH WITH METAL CONSOLIDATION FROM HOUSE OF MALOY ROY TO GUNA ROY, UPEN ROY TO YOGI PRADHAN, KHARYA NARAYAN ROPY TO PUCCA ROAD TO SHYAMALI ROY, HIMADRI ROY TO GOKUL, MANIK TO ANIL DEBNATH, BHAWANI SCHOOL TO KHERIYA PARA. PART- 16/16
CONSTRUCATION OF CC ROAD FROM LALITA MUNDA HOUSE TO JAGGU ORAON HOUSE PART NO. 20/101 UNDER RUNGAMUTTEE GP MAL BLOCK, Project ID- TW252649234S000
CONSTRUCTION OF CC ROAD FROM RABI CHETTRI HOUSE TO BHAWANI ORAON HOUSE PART NO. 20/96 UNDER RUNGAMUTTEE GP MAL BLOCK, Project ID- TW252649103S000
UPGRADATION AND RENOVATION AT OFFICE PARA MANATALI ICDS. PART- 16/12 AT RAMSHAI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCTION OF CC ROAD FROM FARM GATE TO CHETRA SENHOUSE. PART- 16/20 AT RAMSHAI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCTION OF CC ROAD FROM PMGSY ROAD TO BHANGAR HAT POST OFFICE AT PART NO. 16/178 UNDER CHURABHANDAR G.P. IN MAYNAGURI BLOCK
CONSTRUCTION OF RBM ROAD AT BARMAN PARA FROM BIREN ROY HOUSE TO HRIDAY BARMAN HOUSE IN THE PART NO 16/188 UNDER CHURABHANDAR G.P. IN MAYNAGURI BLOCK
CONSTRUCTION OF CC ROAD LOHADANGIRBARI MADAN MANDAL HOUSE TO BALARAM MANDAL HOUSE AT PART NO. 16/184 UNDER CHURABHANDAR G.P. IN MAYANGURI BLOCK
CONSTRUCTION OF 2NOS CC ROAD CHAMPA HALDER HOUSE TO NANDA ROY HOUSE,RANU RAHA HOUSE TO SHIB MANDIR AT PART NO. 16/183 UNDER CHURABHANDAR G.P. IN MAYNAGURI BLOCK
INSTALLATION OF LED SOLAR STREET LIGHT
UPGRADATION,REPAIR AND RENOVATION WORK IN EDUCATIONAL INSTITUTIONS
INSTALLATION OF LED SOLAR STREET LIGHT
CONSTRUCTION OF CC ROAD KHALPARA HIRALAL MANDAL HOUSE TO PWD AT PART NO. 16/184 UNDER CHURABHANDAR G.P. IN MAYNAGURI BLOCK
CONSTRUCTION 2 NOS OF CC ROAD FROM NARAYAN SARKAR HOUSE TO SHAMBHU SARKAR ,FROM BALARAM SARKAR TO SUSHIL BISWAS HOUSE AT PART NO. 16/182 UNDER CHURABHANDAR G.P. IN MAYNAGURI BLOCK
REPAIRING OF CC ROAD FROM HARI ROY HOUSE TO MANORANJAN MANDAL HOUSE AT PART NO. 16
CONSTRUCTION OF RBM ROAD FROM PMG ROAD TO BIJAY ROYS HOUSE IN THE PART NO 16/178 UNDER CHURABHANDAR G.P. IN MAYNAGURI BLOCK
CONSTRUCTION OF CC ROAD FROM PARESH MANDAL HOUSE TO KRISHANU DAS HOUSE OF 16/95 AT MAYNAGURI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCTION OF 2 NOS CC ROAD FROM PWD ROAD TO HALDIBALA ROY HOUSE AND FROM PMGSY ROAD TO SUBAL ROY HOUSE OF 16/96 AT MAYNAGURI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCTION OF ROAD PATCH WORK FROM SACHIN KARMAKAR HOUSE TO PRASHAD ROY HOUSE OF 16/95 AT MAYNAGURI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
INSTALLATION OF SOLAR LIGHT AT DIFFERENT PLACES ( 9 NOS) AS LISTED IN RESOLUTION COPY AT PART NO 16/99 UNDER MAYNAGURI GRAM PANCHAYET UNDER MAYNAGURI BLOCK
REPAIRING OF CC ROAD NEAR HOUSE OF SABBONATH ROY TO DHANANJAY ROY OF 16/99 AT MAYNAGURI GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCTION OF CC DRAIN FROM PRADIP SHIL TO PARIMAL BISWAS PART- 16/59 AT DOMOHANI-II GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCATION OF CC ROAD FROM RAMCHANDAR BARAIK HOUSE TO KAMAL ORAON HOUSE PART NO. 20/99 UNDER RUNGAMUTTEE GP MAL BLOCK, Project ID- TW252649077S000
CONSTRUCTION OF CC ROAD FROM ALOK PAUL SHOP TO PARITOSH ROY HOUSE PART- 16/59 AT DOMOHANI-II GP UNDER MAYNAGURI DEVELOPMENT BLOCK
CONSTRUCTION OF C C ROAD FROM THE HOUSE OF SARIFUL ISLAM TO ZILLA PARISHED ROAD VIA RAFIKUL ISLAM AT PART NO 20/144 TESIMLA G P WITHIN MAL PANCHAYAT SAMITY, FOR THE YEAR OF 2025-26. UNDER THE FUND OF 15TH F.C.(UN-TIED).
CONSTRUCTION OF C C ROAD FROM THE HOUSE OF AMIRUL HOUSE TO JAHIRUL HAQUE HOUSE PART NO 20/143 TESIMLA G P WITHIN MAL PANCHAYAT SAMITY, UNDER JALPAIGURI DISTRICT FOR THE YEAR OF 2025-26. UNDER THE FUND OF 15TH F.C.(UN-TIED).
Drone Simulator Set (5 Set)
SUPPLY WORK