Loading…
Loading…
980 results • Latest
02 x 5 KVA Solar Supply and Construction
CA NO. CWE/HILLS/PGH/180 OF 2025-2026 REPAIRS TO ROADS/PATH, ROAD FURNITURE, AND OTHER RELATED WORK AT 7E AREA AND OTHER LOCATIONS AT MIL STN PITHORAGARH UNDER GE (MES) PITHORAGARH
Construction of L046-Darati To Phalyati Motor Road Stage I and II with 5 Year Maintenance Under PBMC
GE/PGH/91 OF 2025-26
GE/PGH/03 OF 2026-27
Repair and Painting of Dhaulisadan Transit Camp (VIP Guest House ) Tapovan DGPS
Hiring OF Vehicle with Diesel for AE (M), ETL Dharchula under ETD Pithoragarh
Stainless steel dust bin fixing arrangement with frame for LHB coaches to RCF Drg No. MI004725, Alt-k, Items 1 and 3 only. SS commercial-grade wire rope with a minimum diameter of 3 mm and a length of 1.5 meters, with a protective layer of transparent plastic coating or tubing is to be provided (This wire rope is to be fixed with items 1 and 3 to prevent pilferage of the dust bin)
CA NO. CWE/HILLS/PGH/14 OF 2026-2027 SPL REPAIR TO ROAD FROM NEAR BLDG NO P-108 TO P-04 (OFFRS MD ACCN) AT MIL STN DHARCHULA
M. S. heavy Duty Scrap bin
Bus Hiring Service - Regular Basis - Local 24*7; 31-33; Bus 32 Seater; 3000 Km(s), Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Premium SUV; Toyota Innova; 2025; 0-25, 000 kms; A/C; As per SCC and Scope of works
Construction Work of the Non-Residential (Office) Building in Thal Tehsil under Pithoragarh District
Construction of a Rural Motor Road from Mahadev Dhare to Takadi Kapleshwar Temple in Bin Block of Pithoragarh District (Stage-1) Length 2.00 km
Construction work of non-residential building of Tehsil Devalthal under Pithoragarh District
Construction of a Rural Motor Road from Kilometer 10 of the Ganai Bankot Motor Road to Jamtola (Stage-1) Length 2.40 km
Construction of new residential buildings in Tehsil Didihat (Type-1 (05 units) Type-2 (04 units) Type-3 (01 unit) Type-4 (01 unit) and remaining work on previously constructed residential buildings (Type-2 (05 units)
Solid Cushion Tyres (V3) (Q3)
Collection, Lifting, Transportation, Unloading, Segregationof garbage, Waysofdisposal; Dry Waste
Decorative Flag (Q4)
DUST BIN ENCLOSURE
CA NO. CWE/HILLS/PGH/167 OF 2025-2026 SPL REPAIR OF BLDG NO P-13 AND P-42 (COY COOK HOUSE) AT MIL STN DHARCHULA
CA NO. CWE/HILLS/PGH/179 OF 2025-2026 REPAIRS TO ROAD/ PATH, ROAD FURNITURE, ROAD, ROAD PROTECTIVE WORKS SUCH AS DRAINAGE AND RETAINING WALL ETC AT 7A, 7C AND 7D AREA AT MIL STN PITHORAGARH UNDER GE PITHORAGARH
Quilted cloth (Q3)
Markin Cloth (V2) (Q3)
Supply and Onsite installation of dustbin 2 bin mounted as per schedule of requirements
chair mat-cushion (Q3)
Steel Countersunk Head Wire Nails Conforming To IS 723 (Q3)
Bamboo Tent Poles (V2) as per IS 7344 (Q3)
Metal Polish, Liquid (V2) Conforming to IS 5487 (Q3)
Tress Name Plate (V2) (Q3)
Limestone Powder (ONGC) (Q3)
Supply and Retrofitment of Ni Cd Battery Banks at Various
Construction work of the Late Shri Prakash Pant Memorial Gate, situated near the GGIC Gate within the Pithoragarh Assembly Constituency of District Pithoragarh.
Construction work for a modern public toilet near Takana Clock Tower.
Stitching and Tailoring Service - Cutting + Stitching + Tailoring; Cotton; Para Military, Stitching and Tailoring Service - Cutting + Stitching + Tailoring; Angola; Para Military
UNBRANDED