Loading…
Loading…
1,796 results • Latest
One year Maintenence Repairs to SH 139 to Andhali Boratwadi Bidal Phulenagar Hingalkarwasti to Dahiwadi Siddhanath Mandir Road MDR 160Km 0/00 to 15/00 Tal - Man, Dist- Satara
Improvements of Internal Roads at Menvali Tal.Wai Dist.Satara
109/11.Construction of Concrete Road VR 289 Balawadi to Dattamandir Road Tal. Bhor Dist. Pune
Providing illumination in Dam Gallary at Dhom balakwadi Dam Providing power cables for radial gate motors and providing erecting testing and commissioning of new Diesel Generator
Construction of Internal Concrete Road and R.C.C. Gutter at Malkapur NagarParishad Owned Land At Lahotinagar in Indumatinagar At Malkapur Tal -Karad Dist -Satara.
Providing Power Supply to Drinking water well of Samarthgaon and Jambgaon with Supply erection testing and commissioning of DTC and 11 KV line from existing Khodad DTC and Gavthan Feeder
Construction of concrete Road at ITI College to AAshram School for Medha Nagarpanchayat Medha
Providing Power Supply to Samarthgaon and Jambgaon Rehabilated Village from AG Feeder to VG Feeder with Supply erection testing and commissioning of DTC and 11 KV Line from 132 33 11 KV Atit S S Tal and Dist Satara AND Providing electric supply and l
Construction of concrete Road And Gutter From Baban Jadhav House to sanjay sapkal Land ,Gandhinagar at prabhag no.2 for Medha Nagarpanchayat Medha
Renewation and Beautification of Well in front of Mahadev Mandir ,Medha
Development of Namo Udyan at survey no.15B/4A in Medha city under Vaishishtyapurna Yojana
Providing New street lighting system on Dam top at yeralwadi Medium project Tal Khatav
Supply of spare parts for power transformer and other electrical equipments changing of trench cover in switchyard at wangana lift irrigation scheme stage 1 and painting of transmission line from Wangana LIS stage 2 to stage 3
Providing of 1 Core 400 Sqmm XLPE copper cable at Urmodi Lift Irrigation scheme stage 1 Wathar Kiroli
Costruction of 1 room school building Z.P. Primary School at Aaddev No.02 Tal-Patan
Maintenance of LT line in Krishnanagar Govt colony at Satara
Special repairs of internal electrification at Sinchan Bhavan Satara
Oil filteration and oil toup for switchyard transformation repair work of 33 KV line for Jihe Kathapur Lift Irrigation Scheme Stage 1_2 and 3 Tal Koregoan Dist Satara
Providing manpower for operation and maintenance of Switchyard area and Transmission lines of vasana lift irrigation scheme stage 1 and 2 for One year
Providing manpower for operation and maintenance of switchyard area and transmission line of Wangana Lift Irrigation Scheme for one year
Providing private vehicle on rental agreement to subdivision offices Satara /Rahimatpur / Koregaon / Phaltan under Satara Irrigation Division, Satara .
Providing manpower for operation and maintenance of switchyard area and transmission line at Urmodi Lift Irrigation Scheme Stage 1 and 2 for the period of one year
Providing manpower for operation and maintenance of switchyard area and transmission lines of Jihe Kathapur Lift Irrigation Scheme Stage 1 2 and 3 for one year
Providing manpower for operation and maintenance of switchyard area and transmission line of Kawathe Kenjal Lift Irrigation Scheme Stage 1 and 2 for one calendar year
Supply erection testing and commissioning of 30 Kwp On grid solar project at Dhom Balakawadi Division Wai Tal Wai Dist Satara
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) (3 (3 ))
CONSTRUCTION OF CNB AT KINHAI (1/CCNB/17) TAL. KOREGAON, DIST. SATARA
CONSTRUCTION OF CNB AT KINHAI (1/CCNB/16 ) TAL. KOREGAON, DIST. SATARA
Construction of sabhamandap at village Aarvi Tal Koregaon Dist Satara
CONSTRUCTION OF GRAMPANCHYAT OFFICE BUILDING AT DEUR TAL KOREGAON DIST SATARA
Grampanchyat Yashwantnagar Yearly Maintance Of Street Light 2026-27
Tree Plantation and Three Year Maintenance on MDR-19 to Eksar Kusgaon Pasarni Rajewadi Wai Bavdhan Kanur Darewadi Road MDR-92 Km 0/00 to 20/700 Tal. Wai Dist.Satara (Km 15/00 to 20/700)
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) (3 (3 ))
Tree Plantation and Three Year Maintenance on Wai Parkhandi Mungasewadi Chandak Gulumb Vele Solashi Road MDR - 18 Km 0/00 to 21/600 Tal.Wai Dist.Satara ( Km 10/00 to 16/00)
Construction of landslide mitigation structures at Dusale Tal - Patan Dist - satara.
One Year Maintenance for Charegaon Chafal Dadholi road MDR 53 KM 0/00 to 15/300 Taluka Patan Dist Satara
One Year Maintenance for Gamewadi Kadavwadi Padloshi Masugadewadi road MDR 136 KM 0/00 to 10/00 Taluka Patan Dist Satara
Improvements to Approach Road at Marad Misalwadi .Tal.Patan.Dist- Satara.
Improvements to Approach Road at Misalwadi .Tal.Patan.Dist- Satara.
FURNITURE
Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3) (3 (3 ))
One Years Maintenance and Repairs to S.H. 139 to Ozarde Maldara Anavadi Shirgaon Bhosalewasti Degaon Kikali Nikamwadi Jamb Chandwadi Road MDR-91 Km 0/00 to 24/500 Tal. Wai Dist.Satara
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) (3 (3 ))
Improvement to Dheb Aali Road At Mandrulkole, Taluka Patan ,Dist satara
Improvement to Paneri Walmiki Mandir to Palashi road at Paneri, Taluka Patan , Dist satara
Construction of sakav on Baudhwasti Road At Mandrulkole Tal-patan Dist-Satara
Improvement of Kalgaon to Kumal Road Tal-Patan,Dist- Satara
Exacavation and Concreting work of Vardhangad Tunnel ( Ch. 0 to 4/095) and Andhali Tunnel (Ch. 0 to 12/979) as per revised bed slope under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme ( Jihe Kathapur) Dist. Satara
Construction of Sakav On Chinchekadil Odha At Aarewadi Tal. Karad Dist.Satara.
Construction Of Compound Wall At Arewadi North Tambave Tal-Karad, Dist-Satara.