Shifting of HT/LT lines under 132KV transmission line at Gurshale
Procurement of A4 Size Coloured Paper For NTPC Solapur
Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3) (3 (3 ))
Copper Silver Corrosion Test Bath, ASTM Copper Corrosion Chart, ASTM Silver Corrosion Chart, CALIBRATED DIP ROD 2.5 mtr, All Level Sampler, Steel Funnel 12, Calibrated Dip Tape 15Mtr, Measuring can 20 Ltr, HPT Block Out Device 2 inch, HPT Block Out Device 2.5 inch 1, Fuel Spill Kit 35Ltr, HALF Cut barrels with lid 100 ltr, SS QC Tray, Pressure Gauge 0 160 PSI LS 1PSI DIAL SI, Pressure Gauge 0 400 PSI LC. 1PSI DIAL S, 0 160 PSI 63 MM PRESSURE GAUGE FOR TK AN, MEASURING CAN 5 ltr, MEASURING CAN 20 LTR, STEEL FUNNEL 12, SOAK MAT, ELECTRONIC LOCKER
Construction of Road from Ramchandra Survase Vasti up to Manjari road at Methwade.Tal.Sangola
Etender/JS/PS/29/2026-27
Etender/JS/PS/29/2026-27
GPK/ET/01/2026
Etender/JS/PS/30/2026-27
Etender/JS/PS/28/2026-27
Providing and Erecting Crash Barrie on both Side of Main Approach Road of Ujjani Dam
Removal of collapsed geru and silt from Direct Minor No. 4 along the main canal of sina madha lift irrigation schme (chainage 0/00 to 5/120 as well as repair of the bead regulator service path and construction of a platform at minor no. 8 of the mod
Construction of compound wall Around the Pump House of Sina Madha LIS.
Providing and Engaging Manpower for Maintenance, Surveillance, Upkeep of Masonry portion of Ujjani Dam in Kharip, Rabbi and Hot Weather Season.
Sushobhikaran to V.P Office At Undargaon
Construction of Underground Closed Gutter in Waghwasti at Bagechiwadi Tal Malshiras
FFC/GPB/ET/01/2026-27
E-Auction Cum Tender for with environmental clearance Sand Ghat Under ARDHANARI BATHAN SATHA NO 02 Division Dist. Solapur ( As Per Tender Document)
Custom Bid for Services - Supply of 6 Head Pneumatic Testing M/c, Custom Bid for Services - Installation and Commissioning of Pneumatic Testing M/c Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - SUPPLY AND INSTALLATION OF OVCM, Custom Bid for Services - SUPPLY AND INSTALLATION OF ROBOTIC ARM Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, and Installation of Plant Systems/Equipments (Version 2)
Painting of MS Water Tanks in M2, Painting of Structure in M2, Painting of Grating in M2, Painting of Conveyor in meter, Painting of Equipment in each, letter Art 1 to 4 inch in each, White Wash in M2, External paint in M2, Internal paint in M2
Replacement of overaged gate pedestal and associated accessories at LC gates in Solapur division of Central Railway.
Signalling work in connection with "Construction of ROB in lieu of LC-40 and LC-42 in Solapur-Kurduwadi section of Solapur Division".
1.(A) Replacement of pipe line of Kunnor pump house 300mm dia of length 9000M at Wadi under ADEN/KLBG sub division. (B) [i] Replacement of pipe line Bablad pump house to KLBG filter plant 200mm dia of length 4500M ADEN/KLBG sub division. [ii] Replacement of pipe line from Shahabad pump house to Shahabad filter plant 200mm dia of length 3650M ADEN/KLBG sub division 2. Construction of store, dormitory & garden development at railway hospital Solapur.
Miscellaneous P.way Work under SSE/Pway/Jeur under ADEN/KWV(BG) Sub-division for a period of two years.
i) Extension of shunting neck and converted into DN goods loop line at Tilati station. ii) Provision of additional loop lines at BRB. iii) Conversion of loop line in common loop line where favorable crossover is available (1.SVG, 2.KUL, 3. DUD, 4. BOT, 5. MKPT, 6. AAG, 7. WKA, 8. BLNI, 9. JNTR & 10 BGVN) iv) Gharni- Creation of New Block station between Latur-Latur Road section.
1)Improvement of Arch Bridges by extending barrel length and construction of Retaining wall, wing wall and ballast retainer on Bridge no 561/2 DN(span 3 x 5.60m), 577/1 DN(span 2 x 6.10m) , 581/1 DN(span 2 x 6.10m) and 587/2 UP&DN(span 5 x 8.10m) in DUD-WD section of Solapur Division.( Re-invitation) 2) Rebuilding of 04 ORN-3 Bridges ( 536/1A, 589/2, 589/3DN SUR-WD section & 427/3 KWV-MRJ section) in Solapur Division.( Re-invitation)
1) Construction of Cement Concrete road from Kurduwadi-Karmala road to Kem road chauk At - Ropale K 2) Construction of internal Gaothan Cement Concrete road At - Ropale K 3) Providing and fixing Paving Block in Ambedkar Garden At - Ropale K 4) Provid
Providing , Supplying , Instalation LED flood light in Tembhurni Tal-Madha Dist-Solapur
Providing , Supplying , Instalation LED light in Magasvargiy Wasti Tembhurni Tal-Madha Dist-Solapur
Tubular Stay Adjuster(Large) 16 Hole As per RDSO Drawing No. ETI/OHE/P/2402- 1 Rev- B or latest and RI No. 2402-1.
Proposed Vulnerable Witness Deposition Center at Taluka Court Building Madha, Dist. Solapur
DECORATIVE FLAG
Construction of Lawyers Hall at Taluka Court Madha Taluka Madha Dist. Solapur
MANGALVEDHA(G.C.) INDUSTRIAL AREA. M and R to W.S. Scheme at Mangalwedha Industrial Area. Operation and Maintenance of water supply scheme for one year period
One year maintainence of Pande Shelgaon Sade Ghoti Kem road MDR 10 km 0/00 to 3/00 and km 12/500 to 25/00 ,Tal Karmala,Dist Solapur
Implementation of Solar Energy based Dual pump mini water supply scheme Bodare Wasti at Falwani Tal Malshiras
Complete Mobile Data Processing Machine
Construction of Concrete Road From Mahanavar Wasti To Pawar Wasti Village Gursale, Dist - Solapur,
Isolating Cock 22 MM OD with Vent hole
Aluminium Anodized Metal tag numbering plate for (LHB WHEELS) As per is737 86, size:length 70 mmx35 mm width x 1mm thick, hole size 15 mm dia as per enclosed DRG NO SK.NO.WHL/04/1096.
Constructing Road From Suresh Shirke Home to Wargad Wasti Road At Ramwadi
Mini water supply scheme In 1) Gaothan 2) Z.P School 3) Pandurang Wasti At Bitargaon (Shri) Tal-Karmala Dist-Solapur
Providing/delivering hard Murum and soft Murum at the workplace in Gram Panchayat Bitargaon (Shri),
Constructing CC Road Ambedkar Nagar At Sogaon (W)
Constructoin of Class Room For Z.P School in 15 Section At Jambud Tal Malshiras
Supply of Heavy Duty Storage Racks & Supply of Steel Almirah with five shelve.