Loading…
Loading…
4,597 results • Latest
Resotoration of lane which has undergone drian cut ay Shall Mohalla West Maloora
Resotoration of lane which has undergone drian cut at Galibabad Lane Lane No 01 Shalteng
Resotoration of lane which has undergone drian cut at Chinar Colony Umarabad Zainakote
Const of lane BWO of grade II AND penidng portion of drain from Ho Bashir Ah dar to Dr Nazir Ahmad at Usman Abad Lane No 03 Shalteng Srinagar
Development of link road by way of cement concrete near the house of Ghulam Nabi Kuchay Ghulam Rasool and others at Qalamdan Pora
Upgradation of Lane by way of concrete from house of Shabir Ahmad to Syed Abdullah at Firdous Abad Lane No 15 Sector F
Improvement/ upgradation of various links / Lanes at Gund Hassi Bhat BWO Macadamization Phase 1st
Improvement/ upgradation of various links/ Lanes at Mujgund BWO Macadamization Phase 1st
Macdamisation of road at Housing Colony near ghat park Bagh e Mehtab
Macdamisation of road from h/o late feroz ahmad bakal to h/o sabiya parveen at baghe mehtab
Macdamisation of road from h/o abdul khaliq bhat to h/o naseer ahmad rather at ismail colony methan chanapora
Upgradation of lane bwo solling and metalling of link road at Hyderiya Colony Arabal Shalimar Sgr
Upgradation of balance portion of inner link roads of Shah-Firdous Colony Tull Bagh Syedpora Hamchi bwo surface dressing, nallah muck/ khak bajri and WBM Grade 2nd
Construction of lane BWO soling, matalling from main road via house of Abdul Hamid Bhat, Shamim Ahmad Bhat and others at Dangerpora Tailbal ward 67
Imp/upgradation of link road near H/o Nazir Ahmad at Kreshbal Astan Mohalla, Kreshbal Plastic Factory road by way of GSB nallah muck filling and Grade 2nd (Phase Ist)
Development of road at Noorani Colony near Masjid Aqsa
Shifting of 33 KV Shriefabad Narbal Line from Toyota Ansari to Receiving station Narbal along the National Highway Road Part A overhead line.
Flood restoration and reconstruction of play field at Arhama Shopian.
Slope Stabilization and Toe protection of left protection embankment of River Jhelum at RD 855 KM DS at spots
Maintenance and repair of guest house at ram munshi bagh and guest house chattabal by way of electric plumbing mechanical wooden furniture etc including repair of damaged picket fencing at chattabal weir premises
Repair to the Masonary wall by way of RCC Jacketing on left side of Ket Khul DS Tankipora Bridge RD 0 20 km
PLEASE REFER TO BOQ
FILTERS
PLEASE REFER TO BOQ
PLEASE REFER TO BOQ
PLEASE REFER TO BOQ
PLEASE REFER TO BOQ
Flag with RR Logo, Walnut Tray, Linoleum Sheet, Plywood 10 mm 4 x 8 ft, Balli Wood, Iron Mesh Net, Green Cloth Combat, Home Theater with Tower Speaker, Flexible Water Pipe, Colour Chair 10 Mtr, Water Bottle 20 Ltr, Stool Bar, Broom Twigs, MOP Pocha Large, Cloth Drying and Washing machine Semi Automatic 8 Kg capacity, Curtain 3 x 7 ft, Double Bedsheet Best Quality, Air Cooling Machine 22 Ltr capacity, Air Cooler for Window, Pillow best quality, Bucket Plastic, Cup and Saucer, Knife, Spoon, Bowl Katori, Small Plastic Container, Rack Cover, Plastic Gamla, Fancy Night Light
Upgradation of Electric system at SKICC for the year 2026-27
Remodelling of Office Chamber of worthy Chief Engineer, PW (RnB) Department Central Kashmir alongwith pantry Retiring Room and Personal Section, at Engineering Complex Rajbagh Srinagar
High End Furniture
Rate Contract for Providing of Vehicle on Hire basis along with Driver excluding fuel for inspection and other official duties for FY 2026-27 for ED-IV, Khanyar
H16 12 V 19 W Bulb, H8 12V 100W Bulb, H8 12 V 35W Bulb, H7 12V 55W Bulb, 12V 21 5W Double Filament Bulb, 12V 10 W Halogen Bulb, H7 12V 55 W Pheonix Bulb
Drugs
Special repair to Bldg No P 208 at JAK LI RC Srinagar under GE 970 EWS
Conservation / Restoration of Historical Ancient Gopi Nath Terath near water treatment plant Nishat (A)
Providing and replacement of old spare parts along with surge protection device with Earthing of 11KV HT/LT panel in substation, AG office complex, Srinagar (J&K)
Customized AMC/CMC for Pre-owned Products - CTP Machine and Plate Processor; Kodak; Annual Maintenance Contract (AMC); Quarterly; No
Improvement of Ventilation system in lift machine room by way of providing and fitting of industrial grade exhaust fan at Govt LD Hospital Srinagar
Development of playfield by way of Earth filling and Levelling at Government GHSS Soura, Srinagar
Shirt (Winter Uniform) (IAF) (Q3), Trouser (Summer Uniform) (IAF) (Q3)
Repair of Decory Genr Cover for Gun
Civil Maintenance of BSNL Buildings under the jurisdiction of BSNL Civil Division Srinagar SH Day to Day Maintenance and Essential repairs 2026-27