Loading…
Loading…
4,243 results • Latest
The proposed work includes Road Widening Road raising with GSB WMM and Providing Bituminous Macadam of 5cm thickness andbituminous concrete of 3cm thicknessconstruction of drain culverts Side protection androad safety items etc
In this estimate BM BC and road furnishing works are included.
Provision for Earth work, PCC for foundation, M15 grade concrete for Sidewalls, cover slabs GI hand rails, Painting to side wall
Urgent dumping work to the sea coast in between CP 1233 and CP 1234 in Sree Narayanapuram GP in Thrissur District
office amenities electrification and a battery operated inverter and supplying and fixing vitrified tiles on floor Providing and fixing aluminium work for doors windows and Providing wood work in frames of doors windows
2025-26 Eriyad GP Muhammed Abdhul Rahman vayanasala vinjanakendram naveekarannam-190/25-26
Annual Plan-2025-26 Thiruvilwamala GP - PRO.NO 70/26 Kulakkunnath Canal vazhi padam Road
ANNUAL PLAN 2025-26 PRO.NO253/26-PAVARATTY GP RESTORATION WORK OF PAVARATTY VENMANADU AMBALANADA ROAD IN WARD 6 ,14
ANNUAL PLAN PAVARATTY GP 2025-26 RESTORATION WORK OF KARSHAKA ROAD IN WARD 05-Pro.No.247
Second Hand Empty Gunny Bags(V2) (Q4)
Entryand Mid Level Desktop Computer (Q2)
Annual Plan 2025-26-Pro.No273- Pavaratty GP -Restoration of CH road in Ward -13
GENERAL PSM 2025-26-Improvement works to Puthur Branch canal in between Ch.7/200 to 7/700 km-General Civil Work
Dismantling earth work in excavation GSB dry lean concrete for sub base and construction of cement concrete pavement for road work PCC M15 RCC M20 HYSD supply etc.
GENERAL PSM 2025-26Emergency clearance, repairs and tree cutting on RBMC and branch canals during summer rains under Peechi Project section Thanippadam-General Civil Work
Items included are Excavation for road work for widening Scarifying GSB WMM prime coat Tack coat BM BC concrete works and Traffic safety items .
263/26-Maintenance of GHSLPSPeringo forWorking as aReliefCampThanniyam GP230,000/-Etender
MANNUTHY ELECTRICAL SECTION OFFICE RENOVATION WORK under Elcetrical Section Mannuthy
KAU, Mannuthy-Rewiring of Refurbishing area of Press Building-General Electrical Work.
ANNUAL PLAN 2025-26-Pro.No274/26-PAVARATTY GP-RESTORATION OF BADARIA ROAD IN WARD 09
KANNATH LANE MAINTENANCE WARD-10 R-CONCRETING
269/25-26 Ambady soling road maintenance ward 8 R-Concreting
ANNUAL PLAN 2025-26-Pro.No 264PAVARATTY GP-RESTORATION OF PAIKANNIYYUR THEERADESHA ROAD IN WARD 10
148/25-26 PUZHAKKAL AMBAKKAD SCHOOL SIDE ROAD MAINTENANCE- WARD 8 RConcreting
264/25-26 - CHUNGATH SUBLANE ROAD MAINTENANCE WARD 18 R-Concreting
DEPOSIT- KIIFB-2017- Development of Hill Highway-Vellikulangara - Vettilappara reach 3, shifting utilities Vellikulangara Vettilappara road in Mattathur Panchayath - Pipeline Work
147/25-26 Chemmangatt road maintenance ward 5 RInterlock
102/2025-26 MULLAPPONTHADAM ROAD MAINTENANCE WARD-11 R-Concreting
ANNUAL PLAN 2025-26 PAVARATTY GP RESTORATION WORK OF VETERINARY HOSPITAL ROAD IN WARD 04-Pro. No254.
DEPOSIT- Irinjalakuda Muncipality- Replacing the existing 150mm, 250mm, 300mm and 80 mm distribution lines at Puttingal road in connection with the culvert widening in IJK muncipality-puttingal road-Pipeline Work
155/2025-26 PUSHPAGIRI ROAD MAINTENANCE- WARD 13 R-concreting
ANNUAL PLAN 2025-26- PAVARATTY GP- Pro.No.231-RESTORATION OF UNITY ROAD IN WARD 04
GENERAL-CSM-Construction of Generator room near Cheerakuzhy Weir-General Civil Work
Concrete, draingae
GENERAL-Flood damages 2024-Cutting the trees on dangerous situation, removing breached earth from canal, UT and other necessary works from ch 0/000km to 22/950km of LBMC-General Civil Work
GENERAL-Flood damages 2024-Cutting trees in dangerous situation ,removing breached earth from canal, Cut and cover and other necessary works from ch 22/950 km to 40/900 km (Part 1)-General Civil Work
GENERAL-Flood damages 2024-Urgent Rectification and Maintenance for damaged canal from ch 22/950 km to 40/900 km.- General Civil Work
GENERAL-Flood damages 2024-Urgent Rectification of weir premises for canal protection-General Civil Work
ANNUAL PLAN -PAVARATTY GP-Pro.No235/26- RESTORATION OF KALLANTHODE ROAD IN WARD 03
GENERAL-Flood damages 2024-Urgent Rectification of damaged d/s intake and LBMC ch 0/000km to ch 22/950km.-General Civil Work
GENERAL-CSM 2025-26-Urgent Rectification of LBMC between ch.17/950 to 18/050 km General Civil Work
Pavaratty GPRestoration of Vellayiparambu Kalliyathpalli road in Ward -13-Pro.No266
Annual Plan-PAVARATTY GP-2024-2025-Maintenance of ST Thomas road 2nd reach in ward- 4-
ANNUAL PLAN 2025-26 -Pro.No.271/26-PAVARATTY GP- RESTORATION WORK OF IBRAHIM MUSLIYAR ROAD IN WARD 13
PRO.NO. 177/2025-26 PROVIDING HANDRAIL FOR C S NAGAR ROAD WARD-11 IN ARIMPUR GP - RETENDER
Construction of a Two storied Community Building for Cultural Activities in ward 2 in Nattika GP - MPLADS
PRO.NO. 176/2025-26 PROVIDING ADDITIONAL FACILITIES FOR LADIES GYM WARD-16 IN ARIMPUR GP - RETENDER
ANNUAL PLAN -PAVARATTY GP -RESTORATION WORK OF MARUTHAYOOR KALANI ROAD IN WARD 01 Pro.No.219
MPLADS- 2025-26 Concreting of Thandayamparambil Prasannan Road, in ward Talikulam GP
ANNAUL PLAN-2025-26 PAVARATTY GP RESTORATION OF HASSAN MUSLIYAR ROAD IN WARD 13 Pro.No.268