Loading…
Loading…
1,741 results • Latest
Providing, Laying and Jointing 15/50 mm dia GI/PVC pipe line and Connecting with Tube well at Ward No. 51
Providing, Laying and Jointing 15/50 mm dia GI and PVC pipe line and Installation submersible motor pump in Tube well at Ward No. 51 Mahasweta Nagar.
Gap filling work by PVC pipe line in ward No. 03, Khilchipur OHT Zone
OVERHEAD SIGN BOARD AT DEWAS, INFORMATION SIGN BOARD AT DEWAS, DISMANTLING BOARDS AT DEWAS, OVERHEAD SIGN BOARD AT MAKSI, INFORMATION SIGN BOARD AT MAKSI, DISMANTLING BOARDS AT MAKSI
High-capacity Agricultural Haulage
DAINIK UPYOG SAMGARI RATE CONTRACT
Monthly Basis Cab & Taxi Hiring Services - MUV; 1500 km x 320 hours; Outstation 24*7
DAINIK UPYOG SAMGARI RATE CONTRACT
KIRANA SAMGRI SUPPLY
DAINIK UPYOG SAMGARI FOR HOSTEL
A/R & M/O to Residential and Non-Residential Buildings for MSRVVP Ujjain (SH:- Annual comprehensive maintainance of Airconditioning system, water cooler system and CCTV System installed at MSRVVP campus ).
supply, Refilling, maintenance of egov equipments and parts.
Minor Repairing works at Gambhir Dam
Providing Renuation and Repair of Electrical Accessories at Gambhir DAM
Plantation work at various Places in Zone 01
Development And Beautification work Of Sadhna Ujjainkar Udhyan And Naag Mandir Udhyan In w-49 Zone 06
Development And Beautification work Of Lokmanya Tilak Udhyan In w-49 Zone 06
Installation of Flower Pots Gamle
DTR Fencing at Maxi Road Zone Under City Division East
DTR Fencing at Kiosk Zone Under City Division East.
Construction of Control room, boundary wall, Chain link mesh fencing, yard leveling and Metaling, Drilling of tubewell and other civil work for New 33 11KV S s Near Char Dham Mandir under City Dn. West Ujjain.
Construction Of Community Hall At Jabran Colony In Ward No 36
Construction Of CC Road And RCC Drain Work From Shankar Painter House To Ram Temple Hamukhedi In Ward 54
Special repair work of Police thana bhawan Mahidpur city Distt. Ujjain and Police thana Bhawan Mahidpur Road Distt. Ujjain
Outdoor/Indoor Fountain (Q3)
Renovation of Principal Commissioner Cabin at Ground Floor of Income Tax Office at Ujjain. (MP)
Construction Of CC Road Work At Panwasa Behind Bharat Petrol Pump In W- 40
REGARDING INSTALLATION OF SPEED BREAKERS AT VARIOUS PLACES UNDER WARD NO. 05
Supply & fixing of KLCR boxes & fixing of KLCR Relays
External Electrification work for 20 G.O. Qrts., DRP Line Ujjain (11/0.433 KV, 1x200 KVA Transformer with HT line)
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Construction of Ananta IT Park Building Ph2, Ujjain, M.P. (Second Call)
Repairing and maintenance of 20 HP aqua make raw water submersible motor pump set at Sahibkhedi WTP
supply of khadhyaan samagri at central jail ujjain
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2)
Providing ,Placing And Fixing of CC Chairs At Various places In ward 29 Zone 03
Neelkanth van shop 01
AR, SR, MOW WATER SUPPLY AND SANITARY FITTING RB SECTION NO. 1 AT SUB DN. UJJAIN.
Construction work of 500 MT Godown For PACS-Unhel At Village-Pankhedi, District-Ujjain Under RKVY Scheme (1st call)
Tender for Supply of sanitation ITEMs(Swachhta Samagri) for financial year 2026-27
Conducting IECActivities for creating awareness at makdoneCity to support Swachh Bharat Mission under SwachhSurvekshan 2026-27
Tender for JCB, moorum, churi(cube stone) and other construction materials for financial year 2026-27
Tender for Loha jali (including fitting, labour and material cost) in various wards for financial year 2026-27
Tender for Supply of Electric ITEMs for financial year 2026-27
Construction of Hall for Solar Lab at Polytechnic College, Ujjain
Integrated Surface Modulation & Overhead Grid Assembly, Dynamic Acoustic Output & Capture Infrastructure, Concealed Conduction & Coating Application System, Load- Bearing Modular Joinery Assemblies, Integrated Climate Module, Illumination Control Module
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Bankbookor Passbook Update Machines-Printer (Q3) (PACOnly)
All in One PC (V2) (Q2), Entry and Mid Level Desktop Computer (Q2), Computer Printer (V2) (Q2), Scanner (V3) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
A4and Legal Size Multifunction Printer (MFP) (Q2) (PACOnly)