Loading…
Loading…
145 results • Latest
Maintenance of Transformer, Feeder Junction Box, WRA, REBC, Battery Box, Underslung Electrical Panel, IV Coupler and Underframe Cable along with D2/D3/SS1 maintenance schedule of LHB type coaches at PUI coaching depot as per CAMTECH guidelines for a period of three years..
Low Maintenance Stationary Lead Acid Battery sets along with all accessories for installation in the control room at unattended TSS consisting of Set of 55 cells of 2 Volt, 200AH conforming to RDSO Spec. RDSO/PE/SPEC/TL/0040 (Rev.2) 2021. Lead Acid (Tubular positive and pasted negative plates) stationary Batteries 110V 200Ah (comprising 55 cells of 2V each) capacity at 10Hrs. rate of discharge assembled in PPCP Container with intercell connectors, inter row connectors, inter tier connectors, stainless steel fasteners, micro porous vent plug, electrolyte level indicators, and porcelain cells insulators in dry and uncharged condition and Electrolyte, User manual, Routine and Acceptance test reports as per RDSO spec. to be supplied along with battery test. Maintenance Accessories and Electrolyte
Removal of vegetation, bushes in midsection along side track in between the tracks, side drain, catch water drain cleaning in Senior Section Engineer/Permanent Way/Shoranur section for a period of 1 year.
Synthetic Enamel Interior, Undercoating, Smoke Grey ISC No. 692 of of IS 5 : 2007 (Reaffirmed-2022) conforming to IS 133 : 2023 Fifth revision (Reaffirmed 2018) along with additional requirements of ICF/MD/Spec-052, issue status 02, Rev 01 dt. 26.05.2006 under RDSO Amendment No. 1A (Rev. 1.0 Effective from June 2020) as an additional requirement. Packing in 20 Ltrs. New non-returnable M.S. Drums to IS 2552 : 1989 (Reaffirmed-2018), with amendment no. 1 of 1999, Gr. B2 .
Turnkey contract for supply, installation and commissioning of Plant & Equipment along with related infrastructure and operation of Mechanized Laundry at DBRG, collection of soiled linen from coaches at DBRG, NTSK and TSK Railway Stations and loading of washed linen in coaches at DBRG, NTSK and TSK Railway Stations for a period of 10 years under BOOT (Build-Own-Operate-Transfer) Model.
COMPLETION OF INCOMPLETE WORK FOR PROVISION OF OTM ACCN and ALLIED FACILITIES AT ALONG UNDER CCE (ARMY) NO 1 DINJAN