Mobilization and De-mobilization, Boring upto 10m, Boring 10m to 20 m, Drilling through rock, Determination Of GWL, Samples for GWL, Collection of UDS soil, Collection of DS soil, Test of natural moisture, Samples for natural moist, Test of dry density, Samples for dry density, Test for specific gravity, Samples for sp gravity, Test for atterberg limit, Samples for atterberg limit, Test for Permeability, Samples for permeability test, Test for UCS of soil, Samples for UCS of soil, Chemical analysis of soil, Samples for chemical analysis of soil, Test for SPT, Samples for SPT of soil, Submission of report, Test of dry density of rock, Sample for dry density of rock, Test of porosity of rock, Sample for porosity of rock, Test of water absorption of rock, Sam for water absorption of rock, Test of specific Gravity of rock, Sample for specific Gravity of rock, Test of UCS for rock, Sample of UCS for rock
Loading…