HMWSSB
Project Construction Circle 2
Awarded
Laying of 400mm RCC NP3 Rider Main to carry out the lateral sewage flow of all connecting lanes to the existing 1600mm dia RCC pipeline all along the Mir Alam Tank Bund from 5 MLD STP at Mir Alam-II to 41.5 MLD STP at Miralam-I
TelanganaAOC Awarded 12 Sept 2023
Telangana
AOC
Telangana
AOC
Est₹1.6 CrEst
₹1.6 Cr
L1
This company