Widening to 2 and 4 lane with PS of Left out portion of NH 30 from existing Ch. 125.285 to 115.485 Design Ch. 0.000 to Ch. 9.800 Length 8.600 Km including utility shiftingon EPC mode in the state of Bihar for the year 2021 22 (JobNo.NH-30-BR-2021-22)
Loading…