Loading…
Loading…
15,377 results • Latest
C/o link road village Baddu GP Kothi SH C/o Hume pipe culvert at RD 0/550 and R/wall at RD 0/850 to 0/864.50 under MMSY.
CO Phina Singh Deployment of 3 No Multipurpose worker 1 No. Sweeper for various work under PSMIP Division Sadwan for the period of one year 365 days
C/o link road to village Sanour Tikkari in GP Panoh SH Providing and laying cement concrete pavement at RD 0/00 to 0/258 under MMSY.
CO of 3 NoMultoipurpose worker 1 No Sweeper for various work under PSMIP Division Sadwan For the period of one year 365 days
C/o link road to village Luharwin GP Luharwin SH Providing andlaying cement concrete pavement at RD 0/00 to 0/256 under SDRF/NDRF.
Construction of link road to Kaloh Babali from Babali SH Construction of R.C.C Slab culvert 3.00 mtr span at Rd 3/215.Under MMSY
Construction of link road to S.C. Basti Mundhkar G.P. Paplah SH Providing and laying cement concrete pavement at various damaged reaches Under SDRF/NDRF
SH- Providing E.I. work.
Tender on turnkey basis for improvement of supply reliability in the areas under Electrical Division, HPSEBL, Nalagarh by replacing of existing conductor with HTLS 100sq.mm and replacing of damaged PCC Pole with S/T Poles of 11/13 mtr long
Providing fencing in Banuri section fodder project area.
Construction of Heliport building at Rakkar in Tehsil Dharamshala, Distt. Kangra (H.P.).(Sh Providing Air Conditioning system in passengers terminal and fire station building therein).
construction of edge wall, U shape drain and parapets, P/L GSB, Gr-II, Gr-III and Tarring in km 4/420 to 4/510)
Renovation in Office Building of National Bank for Agriculture and Rural Development NABARD, Block No. 32 in SDA Complex, Kasumpti, Shimla 9 and 43 Nos Staff Quarters at New Shimla and Vikasnagar, Shimla including Internal Water Supply and Sanitary
C/O RCC intake chamber 2 Nos, Laying jointing of GMS (M) pipe, C/o protection wall and cutting work at various RDs
SH Repair and painting of Jal Shakti Divisional Office Building Solan Tehsil and Distt Solan.
Construction of R/wall at GSSS Balu SH-C/O Balance work of PCC R/wall at Playground of GSSS Balu Deposit work.
Balance work for M/T on Segli to Burahta Road km. 0/00 to 7/500(SH Retaining walls, Breast walls, V-Shape drain, road Marking with Hot Applied Thermoplastic Compound, Road Stud, Delinator etc.) Under NABARD RIDF-XXVII
Maintenance of four laining of end by pass to Takoli Kullu section of NH-21 Km. 222/700 to 227/600 under Hybrid Mode in State of Himachal Pradesh. SH-Preparation of detail project report DPR Working Estimate and DNIT.
Renovation of accommodation allotted to RME section in COE building by providing cup board, iron grill an existing windows including paint and white washing in HP University, Shimla-5
Construction of 1st Floor on the existing ground floor for storing the Soil Plant and Seed sample at Research Farm of the Deptt. of Agronomy at CSKHPKV, Palampur.
CO Decanting unit
Repair -cum-Renovation of old Milking Parlour, Deptt. of Live Stock Farm, COVAS, CSKHPKV, Palampur.(SH Providing and laying Partition wall, Cement Concrete flooring, wood work etc.)
CO manhole chambers and protection wall at various locations
HP SH RR of 1No RCC storage tank 20000Ltr cap PL Jointing of GI Pipes of Various dia PDNA 2023
SH Providing and laying Kota stone on terrace
Providing store room facility for recruitment branch in parking floor of Multi Faculty Phase-II (Swami Vivekanand Bhawan) in HP University, Shimla-5
Construction of overhead storage tank 20000 liter capacity with 8 meter staging height
Fencing work with MS Square bar and pipe, Plain Cement Concrete and Painting work).
Tender for providing and conversion of the existing 11 kV Single Circuit to Double Circuit from the Dam site to the CT Gate of 126 MW Larji Power House under the Resident Engineer, Larji Power House Division HPSEBL Thalout Mandi
Tender for procurement, transportation, insurance, programming, testing and successful commissioning of 50 HP, 37 kW VFD Drive for Turbine and MIV hydraulic Oil pressure units of 3x42 MW Larji Power House
SH R R of PCC Retaining Wall to Protect The front side of the pump House at RD 0 0 to 0 34 50 1st Step and 15 Mte long PCC Retaining wall to Protect the clear water Tank at RD 0 0 to 0 15 2nd Step
Prep. of Forest Diversion case with including online submission). 1. Nerchowk Ratti Kalkhar road km 0/0 to 13/500. 2. Chakkar Chandyal road i/c Bridge km 0/0 to 1/200. 3. Bhiura Rajgarh Sakroha road km 0/0 to 5/565. 4. Rigger to Chuwari road km
Execution of works for Develpoment I e C o additional class room in 13 Nos Schools under Samagra Shiksha SH C O 1 No. Class Room at GPS Nihalgarh Paonta Sahib Distt Sirmour HP
Execution of works for Develpoment I e C O additional class room in 13 Nos Schools under Samagra Shiksha SH C O 1 No Class Room at GPS Kheri at Kala Amb Distt. Sirmour HP
Preparation of Forest Diversion case with including online submission). 1. Shri Naina Devi Ji at Rewalsar road km 0/0 to 7/0. 2. Reur Durgapur road km 0/0 to 4/0.
RR Providing and fixing of Valves NRV and MCCB etc
A R and M O of 52 Nos Addiotional shops in Commercial Complex near HIMUDA Office Building and HIMUDA office Building in Sector 1 Parwanoo Distt Solan HP Sub Head Providing Chowkidar Sweeper etc For the Year 2026-27 One Year
SH RR of 1No RCC storage tank 40000Ltr cap
Restoration of rain damage on Bakani Dharbeta road under PDNA ( SH Construction of Retaining wall at RD 3/650 to 3/680, 3/510 to 3/520 and 4/750 to 4/765.
SH RM Deployed of 1No Sweeper for wash and cleaning of AE Office Tikkar For 3 Year
RRD on Sandhapattan Bharol Bagora Hard Ropri Kalang Drubal Charonj Banwar Kun Ka Tar Mandhokhar Bhargaon Kotli road km. 70/600 to 85/00 (SH- C/o Balance work for RCC slab culvert at km. 73/500) (Under PDNA 2023)
Removal and Re-installed of existing 50KWp Grid connected rooftop solar plants including solar PV modules, installed on roof of Law faculty Building at HPU Shimla-5
Annual repair and maintenance of residential building under Mandi Division No.II at Jail raod District Mandi (H.P) (SH- Providing and fixing steel work, ceiling work in cement bonded wood particle board, prepainted sheet and tile work etcetera in Qtr
P/F Cupboard, P/F wooden Flooring, Panelling , in Type-IV 42 Under Kasumpti section
Raising of Nursery of Bio-engineering plants for SDRF (SH Construction of shade Net House in Tamboo Ka Mor Nursery).
Restoration of Rain damges to WSS Naini to Bagru in GP Poolan Tehsil Bharmour Distt Chamba (SH-Construction of zinc Aluminium tank 20000 letrs cap at Bagru under PDNA 2023
Raising of Nursery of Bio-engineering plants for SDRF (SH Construction of shade Net House in Nagali Nursery).
Up-gradation of Lab table by raising the height and providing partition at each seat for conductiong CBT exam in Computer Sceince Department in HP University, Shimla-5
Providing and installation of 1.5 tone Split Air conditioner (3star having pure copper condenser and evaporator coils of havvels make and LLOYD make to prevent equipment failure by dssipating extreme heat, managing humidity levels and moisture and p
Supply Installation and Commissioning of additional 02 Nos 3 Ton Air Conditioners in HPSLDC Main Control Centre Totu Shimla HP and additional 03 Nos 3 Ton Air Conditioners in HPSLDC Backup Control Centre Mattansidh Hamirpur HP