Loading…
Loading…
15,323 results • Latest
Creation of Out Village/ In Village RPWSS Support to provides real-time monitoring of water infrastructure.
Providing and fixing 8 nos LED high bay lighting of Havells Saucer Neo make180 watts including supply, installation, testing and commissioning in the machine hall one side bay
Overhauling of eroded break jet nozzle liner, repair of liner, spear dismantled and overhauling of decompression valve for Andhra Power House Division, HPSEB Ltd, Chirgaon complete in all respect as per direction of Engineer in charge
Providing and fixing of 01 No MOOG Electro Hydraulic Servo Valve at Andhra Power House HPSEBL Chirgaon complete in all respect as per direction of Engineer Incharge
Construction of link road from Sigar to Lower Tarala and Luhari to Jaon preparation of forest case
Engagement of Consultant for preparation of forest case
Restoration of rain damages on Ranabag to Kandibag road portion Guhatan to Lot km 0/000 to 10/800
Restoration of rain damages on Averi Bayal to Koil road km. 0/000 to 8/700
C/O B/wall at RD. 0/260 to 0/275
Widening and Improvement of narrow curves between km. 0/00 to 2/00
RR Damages on Badiyara Jangla Devidhar Road km 000 to 1100 Sh CO RWall in RR Stone Masonary cm 16 km RD at 10900 to 10920 UNDER PDNA
Maintenance of drain, Trimming of grass, maintenance of earthen shoulder and hume pipe, white washing and ,Removal of land slides etc at various Rds
R R Damages to Badiyara to Jangla Devidhar road km 0 0 11 100 SH C O R Wall in stone Masonary cm 1 6 RD 11 007 11 038 11 046 11 065
P/F Checkerred tiles in lawn area of Type-III Block-D under Parimahal Section
P/F Checkerred tiles in lawn area of Type-III Block-C under Parimahal Section
Covering of periphary of Type - IV set no. 15 to 26 under Kasumpti Section
Repair work Toilet , Bathroom, Kitchen , P/F Cupboard , white washing / distempering ,etc in Type- IV 52 under Parimahal Section
Sub head Construction of 6 No Chamber, laying, jointing, testing of HDPE pipe from Out-let No-17 to 18,18 to19,17to20,20 to21 and 14 to 23)
C/O Pump House at LIS Thora Bhaloon)
R R damage to link road Village Tandali to Dogda Khad KM 0 00 to 2 00 SH C O B Wall at RD 1 700 to 1 750
R R Damage on Pujatrli No 4 to Sitli Dhanknwar Jubbar road Km 0 00 3 00 SH C O B Wall in W C at RD 2 050 2 075
Formation Cutting at Rds from 81/930 to 82/015).
Formation Cutting at Rds from 82/015 to 82/120).
Formation Cutting at Rds from 81/825 to 81/930).
Collection of Monthly User Charges for Door-to-Door Garbage Collection from residential houses, shops, hospitals, hotels, institutions and other commercial as well as non-commercial establishments falling within the jurisdiction of Municipal Council
C/O 4 Nos. Check Dam at Charuri, Dhaneti, Rit and Bassa Waziran)
SH RR 10Mtr long RWall protect the JSV Section Bulding Tikkari at RD 00 to 010
Construction of Mahila Mandal Bhawan in GP Mangoo Tehsil Arki, Distt. Solan HP.(Under DMFT)
(SH-C/o Building Portion, Providing Water Supply, Sanitary Installation, C/o Septic Tank with Soak Pit, Rain Water Harvesting tank, and Site development i.e. Site Levelling C/o R/Wall B/Wall under ground storage tank dismantling of old structure)
SH RR Laying jointing of HDPE pipe of various dia and Co 4Nos RCC Intake chamber
Formation Cutting at Rds from 81/750to 81/825).
Providing and supplying of Lab Equipment Ion Meter Orion Thermofisher
SH RR Providing Trenching Laying and Jointing of GMS Tube of various Dia
SH RR Providing Trenching Laying and Jointing of GMS Tube of various DiaUnder PDNA 2023
Drilling and lowering and development of mini tube well bore well 60 metre deep
SH RR Providing Trenching Laying and Jointing of GMS Tube of various Dia Under PDNA 2023
R R damages on Tutupani kuthari khalgar ghasni road km 0 000 to 19 680 SH C O R wall at Rd 13 320 to 13 350 13 285 to 13 315 B wall at rd 10 960 to 10 985 11 630 to 11 650 11 960 to 11 990 13 900 13 915 19 105 19 120
Drilling by hand pumps with DTH/ ODEX / Percussion/ Calyx / Portable Rigs 60 mtrs deep at Khanni Jhikli ward N0-07 near Saria House and Village Gurchal ward No-04 near Amir Chand House).
Construction of RCC Branch Channel RD 200 to 390 190 Running metre
R/R damages to Subathu Bye Pass road in Km. 0/00 to 0/800.(SH P/L 50mm thick DBM and 30mm thick BC in Km. 0/00 to 0/800)Under PDNA
Construction of RCC Branch Channel RD 0 to 200 200 Running metre
Deposit estimate for R/M of Street lights point under Electrical Sub-Division No. I, HPSEBL, Joginder Nagar for period 01.07.2026 to 30.06.2027.
SH RM Deployed of 1No Chowkidar and 1No Sweeper for wash and cleaning of AE Office For 1 Year.
SH R R of 1No RCC storage tank 10000Ltr cap
C/o road from Pokhi to Shanthla (SH F/C 3/5 meter in Km. 0/675 to 0/895) Deposit VKVNY 2024/25
Maintenance of LT lines which are on the verge of damage in ( E) Section Kuthar, Chailla, under ESD, HPSEBL, Sainj.
Maintenance of HT lines which are on the verge of damage in ( E) Section Kuthar , Chailla under ESD, HPSEBL, Sainj.
Maintenance of LT lines which are on the verge of damage in (E) Section Deha , Sainj, under ESD, HPSEBL, Sainj
Maintenance of HT lines which are on the verge of damage in ( E) Section Deha , Sainj under ESD, HPSEBL, Sainj
Lopping of tree branches coming in the corridor of 22KV HT LT lines in (E) Section Matiana , Shilaroo, under ESD HPSEBL Matiana.