Loading…
Loading…
4,490 live3,459 closing this weekmost from Rural Development and Panchayati Raj and PWD
Published at jktenders.gov.in, Jammu and Kashmir's official e-procurement portal.
4,490 results • Latest
Construction of Drainage alongside Peer Mohalla Nargis Bagh Chandil link road.
Balance work of Auditorium Building at Hr. Sec. School Kunzer
Development/Levelling of Multipurpose ground near Adventure Hut at Gulmarg Phase -1st
Restoration of Gravity lines Sill to Kote and Hill Beli to Dharra Loharan under Disaster Management, Relief, Rehabiltaion and Re-construction debit to (MH4235)
Augmentation of Receiving Station Watlab from 2X6.3 MVA to 2X10 MVA under UT Capex
Providing and Fixing of Barbed Wire Fencing with Angle Iron fence posts in Cement Concrete Blocks and Planting of Conifer Plants, Dibbling and Patch sowing in compartment D-33a Gurwaith Forest Block (0.05 Hac - 315 rft) of Raithan Forest Range Budgam
Providing and Fixing of Barbed Wire Fencing with Angle Iron fence posts in Cement Concrete Blocks and Planting of Conifer Plants, Dibbling and Patch sowing in compartment D-19a Forest Negoo Block (0.61 Hac - 1162 rft) of Doodganga Forest Range Budgam
Repairs to various Snow Machines viz. Rolba 3000 and Liugong 848H of Mechanical and Hospital Sub-Division 2nd (Hq. Pulwama).
Repairs to various Snow Machines viz TATA LPT 713 MC26 Snow Cats Sonalika Cat 1st 2nd 3rd 5th and 6th Preet Snow Cat 7thand 8th Farmtrac (Snow Cat 9th and 18th), New Holland (Snow Cat 4th Rolba 1500 of SCCR Kulgam Bathipora of Mech
Construction of Link Road from Achgoze road to Digoo Mohalla CB Nath
Maintenance of existing electric fitting of Divisional office Building.
Development of Eco-Tourisim at Tosamaidan, Sukhnag Range by way of Providing and fixing of Chain link Fencing, Ornamental Fencing including Construction of Main Entrance Gate, Parking and Land Development. Pir Panjal Forest Division Budgam
Hiring of Manpower (Operators and Helpers) for operation of Snow Clearance Machinery of Mechanical and Hospital Division Anantnag for the Year 2026 27
Supply, Installation, Testing and Commissioning of 1 MVA Sub-Station alongwith 11KV CT/PT unit with Trivector meter and Strengthening of existing ACSR Rabbit with ACSR Dog on HT line at Indira Gandhi Govt. Dental Hospital, Jammu
Construction of damaged outlet pipe and raising of Tazipora canal at Baghbal.
Construction of machine drilled Deep Borewell Mohammad Maqbool dar and others at Naseem Bagh B Bacha bagh seer Road
Repairs to OTIS make G plus 2 26 Passenger Bed Lift installed near Burn Ward Section of SMHS Hospital, Srinagar followed by CMC for 01 Year
SITC of CCTV Camera and Allied Accessories along the Banganga Track.
Shifting of HT Line from Rangwadi Nowpora upto Shopping Complex of Ab Gani Sheikh Amlar.
Construction of Tile path from Shop of Mohammad Ashraf Khan to Ration Ghat Ishpeer Sahab.
Construction of tile path from H/o Mohamad Shaban Malla to H/o Imtiyaz Ahmad Dar Ward No.18
Construction of tile path from H/o Altaf Ahmad Ganie to H/o Mushtaq Ahmad Ganie ward No.18.
Construction of NTPHC at Gundshat Tangdar (Balance work and Electrification).
Comprehensive Annual Maintenance Contract and Operation charges for One Year of Onsite 300 LPM OGP at SDH Bani
Construction of NTPHC at Watlab Sopore (Balance work and Electrification).
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 14 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 15 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 13 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 11 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 12 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 10 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 09 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 08 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 07 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 06 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 05 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 04 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 03 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 01 As per Annexure
Snow clearance winter season for the year 2026-27 of RnB Division Kralpora Stage - 02 As per Annexure
Construction of Surface drain and tile path from Mushtaq Ahmad Kundroo via Mushtaq Ahmad Wani and connect with deep drain ward No.15 Hajama at Kraltang.
UPGRADATION BY WAY OF DOOR AND WINDOWS,TOILET SEAT AND OTHER ALLIED WORKS AT TEHSIL OFFICE DACHHAN