Loading…
Loading…
28,370 results • Latest
Construction of Compound wall for SWM site in Huliyar TP Limits
e-Tender for supply and commissioning of Frontend Wheel Loader (Min 225 HP) for Subbarayanhalli, Thimmappangudi Iron Ore Mine,Sandur, Bellary -Dist of KSMCL ,Bangalore, Karnataka
CONSTRUCTION OF ROOMS AT GHPS SCHOOL AT CHILAKAMUKHI VILLAGE IN KOPPAL TALUKA
Comprehensive Development of Road, Drains and Providing Water Supply and other Allied works at old Masjid Mohalla, Madeena Masjid Mohalla, Anjum Masjid Mohalla Minorities dominated areas of Magadi Assembly Constituency.
Comprehensive Development of Road, Drains and Providing Water Supply and other Allied works at Goripalya and surrounding Areas in Ward No-137 Rayapuram of Chamarajapete Assembly Constituency.
Comprehensive Development of Road, Drains and Providing Water Supply and other Allied works at Mominpura and surrounding Areas in Ward No-136 JJR Nagara of Chamarajapete Assembly Constituency.
Recarpeting of Sindagi - Kodangal State highway (SH-16) Main Road from KM 129.60 to 130.00,140.00 to 142.50 and 153.00 to 155.40 in Selected Reaches, Widening of Road at Gurumitkal City and Construction of Bridge, Beautification of Gurumitkal City and Construction of Modren Bus Stop in Gurumitkal Taluka, Yadgir District (Under KKRDB MICRO (General) (Infrastructure) for the Year 2025-26)
Inviting tender as per OPEX Model for outsourcing Photocopier Services by installing Copier Machines on Cost/Rate per page basis in the Kalaburagi, Aland, Afzalpur, Chincholi, Chittapur, Jevargi, Sedam and Shahabad Taluk Courts.
SUPPLY OF A TRANS CATHETER VALVE SYSTEMS FOR PERCUTANEOUS VALVE TREATMENT ON A CONSIGNMENT BASIS
Re-Surfacing of MDR Road from BM Road Junction to Bidadi Industrial Area, 2nd Phase, Sector-1 and 2 Junction (Shanumangala Village), Bidadi Hobli, Ramanagara Taluk, Bengaluru South District (Four Lane) (Ch. 0.00 to 1.90Km)
Widening and Improvement work to Challakere (NH-150A) to Vishwanathanahalli road (State Highway-243) from Km 73.07 to 76.10 and Km 77.95 to 84.40 of Challakere constituency in Challakere Taluk
Improvements To Road SH-177 Muddebihal Taluk Border to NH150(A) Km 154.70 to 156.97 in Shorapur Taluk Yadgir District(Road Safety Works)And Improvements to Road Hunugunda Surpur Road Km 127.00 to 129 and Construction of Protection wall (Road Safety Work) in Shorapur Takuk Yadgir District.
Empanelment of Third Party Consultants for Quality Assurance Audit and Control of Development works funded by KKRDB in Bidar, Yadgir Districts & KKRDB
PROVIDING INFRASTRUCTURE FACILITIES AT B WING OF NEW CHILLY MARKET AT ALADAHALLI VILLAGE OF APMC BALLARY UNDER RIDF-31 SCHEME 2025-26
Improvements to road Budagumpa-Gedigera Major District Road from Km 1.99 to 6.70(Working Ch. 1.990 Km to 5.970 Km) in Yelburga Constituency in Koppal District.
Providing LMV air conditioned vehicle for District treasury Kalaburagi on monthly rental basis
Repairs of Toilet and Installation of Grills at Sub Treasury Office in Gudibande Town, Chickballapura District
Road development work adjacent to VTU college in Rammanahalli town panchayat limit
Resurvey of Neralamane RF Block I & II Reserved Forest, with its boundary length measuring approximately 31.70 Km in Hosanagara Range, Sagara Division, during 2026-27.
Resurvey of Ubburu MF Reserved Forest, with its boundary length measuring approximately 10.20 Km in Mandagadde Range, Shimoga Division, during 2026-27.
Resurvey of Mahishi MF Reserved Forest, with its boundary length measuring approximately 17.50 Km in Thirthahalli Range, Shimoga Division, during 2026-27.
Resurvey of Kamaruru MF Reserved Forest, with its boundary length measuring approximately 9.10 Km in Anavatti Range, Sagara Division, during 2026-27.
Resurvey of H Hunasavalli RF Reserved Forest, with its boundary length measuring approximately 9.70 Km in Hosanagara Range, Sagara Division, during 2026-27.
Resurvey of Kalmadka Extn Block I Proposed Reserved Forests Notified U/s 4 of KFA-1963 with its boundary length measuring approximately 7.50 Km in Puttur Range, Mangalore Division, during 2026-27, in order to provide technical support to the FSO & the DCF during the process of settlement and preparation of Settlement Map to be signed jointly by the both and also for preparation of Tie-line Map and Draft Notification proposed U/s 17 of KFA 1963.
Resurvey of Salur MF Reserved Forest, with its boundary length measuring approximately 7.00 Km in Ambligola Range, Sagara Division, during 2026-27.
Resurvey of Haridravathi Block Reserved Forest, with its boundary length measuring approximately 23.07 Km in Hosanagara Range, Sagara Division, during 2026-27.
Resurvey of Basapur Block Reserved Forest, with its boundary length measuring approximately 10.00 Km in Shikaripura Range, Sagara Division, during 2026-27.
Resurvey of Haranahalli Reserved Forest, with its boundary length measuring approximately 18.50 Km in Shikaripura Range, Sagara Division, during 2026-27.
Resurvey of Kamalapura MF Reserved Forest, with its boundary length measuring approximately 6.60 Km in Soraba Range, Sagara Division, during 2026-27.
Demarcation of Guruvanakote Block Reserved Forest by Formation of Cairns in 60 Nos along its Re-Surveyed Boundary in Byndoor Range, Kundapura Division, during 2026-27.
Demarcation of Kadike Reserved Forest by Formation of Cairns in 50 Nos along its Re-Surveyed Boundary in Byndoor Range, Kundapura Division, during 2026-27.
Demarcation of Puthila RF Reserved Forest by Formation of Cairns in 20 Nos along its Re-Surveyed Boundary in Uppinangadi Range, Mangalore Division, during 2026-27.
Demarcation of Harkur RF Extn Block IV Reserved Forest by Formation of Cairns in 20 Nos along its Re-Surveyed Boundary in Kundapura Range, Kundapura Division during 2026-27.
Demarcation of Virakamba Block Bit-I & II Reserved Forest by Formation of Cairns in 66 Nos along its Re-Surveyed Boundary in Bantwala Range, Mangalore Division, during 2026-27.
Demarcation of Padnur RF Reserved Forest by Formation of Cairns in 100 Nos along its Re-Surveyed Boundary in Panja Range, Mangalore Division, during 2026-27.
Demarcation of Albady Block II Reserved Forest by Formation of Cairns in 20 Nos along its Re-Surveyed Boundary in Hebri Range, Kundapura Division, during 2026-27.
Demarcation of Subramanya Block in Inakidu Village Reserved Forest by Formation of Cairns in 50 Nos along its Re-Surveyed Boundary in Subramanya Range, Mangalore Division, during 2026-27.
Demarcation of Harkur RF Reserved Forest by Formation of Cairns in 20 Nos along its Re-Surveyed Boundary in Kundapura Range, Kundapura Division, during 2026-27.
Demarcation of Albady Block Bit III A & B Reserved Forest by Formation of Cairns in 40 Nos along its Re-Surveyed Boundary in Hebri Range, Kundapura Division, during 2026-27.
Demarcation of Albady Block Reserved Forest by Formation of Cairns in 30 Nos along its Re-Surveyed Boundary in Hebri Range, Kundapura Division, during 2026-27.
Demarcation of Jomblukadu Block-I & II Reserved Forest by Formation of Cairns in 64 Nos along its Re-Surveyed Boundary in Hebri Wildlife Range, Kudremukh Wildlife Division, during 2026-27.
Demarcation of Surveyed Boundary of Harkur RF Extn Block-IV Reserve Forest by Construction of 10 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Kundapura Range of Kundapura Division during 2026-27.
Demarcation of Surveyed Boundary of Harkur RF Extn Block Bit I II III Reserve Forest by Construction of 18 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Kundapura Range of Kundapura Division during 2026-27.
Demarcation of Surveyed Boundary of H Hunasavalli RF Reserve Forest by Construction of 19 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Hosanagara Range of Sagara Division during 2026-27.
Demarcation of Surveyed Boundary of Bakudi Extn to Bakudi RF Extn Block Reserve Forest by Construction of 19 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Shankaranarayana Range of Kundapura Division during 2026-27.
Demarcation of Surveyed Boundary of Abbigudde RF Extn Block I & II Reserve Forest by Construction of 14 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Kundapura Range of Kundapura Division during 2026-27.
Demarcation of Surveyed Boundary of Talagadde MF Reserve Forest by Construction of 20 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Anavatti Range of Sagara Division during 2026-27.
Demarcation of Surveyed Boundary of Neralamane RF Block I & II Reserve Forest by Construction of 55 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Hosanagara Range of Sagara Division during 2026-27.
Demarcation of Surveyed Boundary of Albady Block Reserve Forest by Construction of 18 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Hebri Range of Kundapura Division during 2026-27.
Demarcation of Surveyed Boundary of Ankaravalli MF Reserve Forest by Construction of 20 RCC Pillars of specified dimensions at the given locations along the Notified Forest Boundary in Soraba Range of Sagara Division during 2026-27.