Loading…
Loading…
24,025 results • Latest
Earthwork, Cement Concrete, Reinforced Cement Concrete, Single under reamed piles and RR Stone Works
RD road to Amaramunda _Road_Boxcell Culvert -1x3x3-At 1.000 km
Construction of cement concrete road from old pump house to sani temple and infron of crematorium at Samanta sahi in w.no01
Repair and restoration work deposited by WATCO for the following Roads 1. OERC to Srikrishna Nagar Basti from ch. 0.00km to 0.500km 2.BPCL Petrol pump to Niladri vihar 3. ATM square to Sailashree Vihar from ch. 0.00km to 0.675km 4. OMFED square to Ni
Construction of Chikili to Hariharpur Road in the District of Kalahandi under Scheme Mukhya mantri Sadak Yojana MMSY for the Year 2026-27
Operation and maintenance of existing sewerage system of different areas (SS Vihar Phase-7, Kanan Vihar Ph-1, Prasanta vihar, Prasanti Vihar-1,Chirgaltola Slum, Prasanti Vihar Slum, Sikharchandi Cluster-1,3, Jalimunda Sahi and Bajaranga Basti areas)
Construction of road from PWD Road to Anadhua Road in the Dist of Bhadrak Under the Scheme MMSY (Mission Powar) for the year 2026-27
Improvement such as widening and strengthening of Mangalpur-Narigaon road from 0/000 km to 7/162 km in the district of Jajpur under State Plan
Supply, Installation, Testing and Commissioning of 125 KVA DG set at Dialysis ward at DHH, Angul for the year 2026-27
Repair to Bridge over Local Nallah at 1.200km on Bhaler to Kurul road _Road_Pothole repair, Painting, Renoveting Post, repair to railing, WMM and SDBC on Approach 0.000 to 1.000
Bridge over Badjore Nallah at 4th km on Paunsia-Patrapada-Sialighaty Road_Road_Repairing to wearing coat ,Railing,post and Revetment portion including approach road with PMC and Seal coat.At 4.000 km
S/R to RD Road T-02 to - Suruguda for the year 2026-27
Repair to Bridge over Local Nallah at 2nd Km on SH-14 to Kurlupali _Road_Pothole repair,Painting, Renoveting Post, repair to railing, WMM and SDBC on Approach, repair to railing0.000 to 0.600
Construction of Govt. Ayurvedic Dispensary GAD building at Mahulapal in Bhuban Block of Dhenkanal District
Construction of road from PWD Road to Badhugadia Road in the Dist of Bhadrak Under the Scheme MMSY (Mission Powar) for the year 2026-27
S/R to Bridge over Sonegarh River on Tapren to Bandhpada road for the year 2026-27
Construction of (S plus 7) Storied Building near MHI for Infrastructure of Centre of Competence, SCB Medical College and Hospital, Cuttack.
Repair to Nimapada-Astaranga road from 21/00to30/738bush cutting and20/100to20/350,20/500to20/750,20/900to21/300,22/110to22/300,22/400 to22/520,22/650to22/780,22/780to22/900,23/200to23/310,29/400to29/500 BUSG BC repair in Patches for the year 2026-27
42/6665-S/R to Dungura to Turanipada Road BT surface repair with BUSG and SDBC 0.500 to 1.100 2.800 to 4.000 for 2026-27
Bridge over river Gangahar at 2nd km on Deuli-Patisari-Balichilima Road_Road_Repairing to wearing coat ,Railing,post and Revetment portion including approach road with PMC and Seal coat.At 2.000 km
Redevelopment of Crematorium Yard Near Rushikulya,Ward no-03 Under Hinjilicut Municipality
Construction of road from RD Road to Jaisinghpur Road in the Dist of Bhadrak Under the Scheme MMSY (Mission Powar) for the year 2026-27
El to Construction of 11kv line and 100KVA S/S for District Local Fund Audit Office, Angul for the year 2026-27.
Tarva-Panimura to Laxmimunda_Road_Providing depression filling with WMM, SDBC and Berm dressing_3.000 to 5.000
Khari-Kumunde R.D Road to Paikbahal_Road_Providing depression filling with WMM, SDBC and Berm dressing_ 0.000 to 1.000
S/R to Road from Batagaon Chhak to Medical square for the year 2026-27 Such as Restoration of damaged B.T. Portion of Road Due to heavy Rainfall in patches from ch.0/520kmto0/570km3/280kmto3/330kminLHS and0/530kmto0/800km and1/000Kmto1/195KmRHS
Baghuapal to Jagannathpur_Road_Pothole repair and SDBC1.500 to 6.000
Kasipada To Mahulapalli Road
Construction of PWD Road to Muhanpada Road in the Dist of Bhadrak Under the Scheme MMSY (Mission PoWaR) for the year 2026-27.
S/R to HL Bridge over Sonegarh River on Sikuan to Arda road for the year 2026-27
S.L RD Road to Ghatkaintara_Road_Providing depression filling with WMM, SDBC and Berm dressing_ 0.000 to 1.200
CONSTRUCTION OF EXECUTIVE HOSTEL FOR STATE INSTITUTE OF DISASTER MANAGEMENT (SIDM) AND CONSTRUCTION OF EXECUTIVE HOSTEL FOR ODISHA DISASTER RAPID ACTION FORCE (ODRAF) AT SIDM CAMPUS, GOTHAPATANA ROAD, BHUBANESWAR
Construction of weir adjacent to bridge over local nallah at 3.22 km on PWD road to Raikelaposh road in the district of Sundargarh for the year 2024-25
Repair to Nimapada-Astaranga road from 0/00km to 21/00km bush cutting, 18/200 to 20/050km BUSG BC Patches repair and road marking with thermoplastic compound from 0/00 to 30/738km only on rumbles and Humps for the year 2026-27
Sargaj to Jurabandha_Road_Providing depression filling with WMM, SDBC and Berm dressing_ 0.000 to 3.000
Construction of 01 No D type Quarter building at Tahasil Office at Gurundia
S/R to Bridge over Sonegarh River on Antarla to Pipalpadar road for the year 2026-27
S/R to HL Bridge over Sonegarh River on Kuthurla to Siletkani road for the year 2026-27
SH-19 to Subarnamanjari Road _Road_Renewal Coat with SDBC including Potholes and depression filling with BUSG and Raincuts filling with earthwork.1.300 to 5.300
Repair to Pipili-Nimapada-Gop-Konark road from 14/00km to 20/00km for the year 2026-27 (Such as clearing and bush cutting road marking with thermoplastic compound )
Repair to Pipili-Nimapada-Gop-Konark road from 10/100 to 10/240, 10/550 to 10/800,11/900 to 12/180,12/950 to 12/980 and 13/700 to 13/900km patch and pothole repair and 8/00 to 14/00km bush cutting for the year 2026-27
Nuagaon to Tampada_Road_Drain0.300 to 0.500
Building Work
Renovation of Building
Building Work
Jhartarva to Bijapadar -Panimura-_Road_Providing depression filling with WMM, SDBC and Berm dressing_ 6.000 to 7.200
N.A Road - Villideuli_Road_PMC Seal Coat_ 1.580 to 2.350
S/R to road from RD Road to Bhagapada Ch 0/000 to 1/750 Km in the district of Sambalpur for the year 2026-27.
Building Work