Loading…
Loading…
482 live51 closing this weekmost from Chief Engineer, PWD (R and B) and Chief Engineer, Rural Development Department
Published at tripuratenders.gov.in, Tripura's official e-procurement portal.
482 results • Latest
Rate Contract for End-to-end Recruitment Process Management for the recruitment to the post of Lower Division Clerk (LDC) in Tripura Renewable Energy Development Agency, Agartala, Tripura
Development of road from NH 08 to NH 08 via Shymaprasad Mukerjee lane and Mohan Saha house Total L 730 00 mtr under Scheme for Special Assistance to States for Capital Investment for 2026 27 SH Paver Block Patch GSB WBM Carpeting Seal coat
Building portion including internal water supply, sanitary installation, sewage and drainage works.
Maintenance of Govt. residential building during the year 2026-27/ SH Repair /maintenance of Type - I (63 nos) Qtrs and Type - II (151 nos) Qtrs at KTS under Central-IV Sub-Division, Kunjaban, Agartala.
Construction of RCC Pillar based water reservoir (20,000 ltrs. capacity) and sinking of mini deep tube well at Fire and Emergency Services HQ Complex, Agartala
Development of road from Laldhar SB School to Saidacherra W 04 Length 0 930 Km Ch 0 360 km to 0 510 km under Rajnagar GP under Special Assistance for Capital investment during the year 2026 27 within the jurisdiction of Ganganagar PWD R and B S
Development of road from Laldhar SB School to Saidacherra W 04 Length 0 930 Km Ch 0 510 km to 0 930 km under Rajnagar GP under Special Assistance for Capital investment during the year 2026 27 within the jurisdiction of Ganganagar PWD R and B S
Development of road from i NH 08 to Uttar Pabiacherra via Pijush Das house at Ward No 8 T L 600 00 mtr and ii NH 08 to Deo river via Tapan Das house at Ward No 07 T L 150 00 under Scheme for Special Assistance to States for Capital Investment for 202
Empanelment of Agencies for Supply of Outsourced Manpower and Allied Services
Repairing and Maintenance of Tepania Food Go-down under Tepania RD Block.
Development of road from Kumarghat Fatikroy road near RCC bridge to Nedevi Berry in c allied roads Total Length 700 00 mtr under Scheme for Special Assistance to States for Capital Investment for 2026 27 SH Protection work at approaches and w
Development of road from Laldhar SB School to Saidacherra W 04 Length 0 930 Km Ch 0 00 km to 0 360 km under Rajnagar GP under Special Assistance for Capital investment during the year 2026 27 within the jurisdiction of Ganganagar PWD R and B Su
Maintenance and repairing work
Temporary construction of vehicle shed for 2-Water Tender, 01-Water Bowser, 01-Multiporpose Tender and 2- Light vehicle in the vacant land between Type-III Type-II Quarter at Udaipur Fire Station, Gomati District.
Sub Submission of estimate for the work Development of the road from Parimal Das house to Nikhil Das house via Mithun Das house under Ambedkarnagar GP SH E Filling GSB WBM 2 WBM 3 Carpeting etc under Scheme for Special Assistance to States for
Submission of estimate for the work Mtc of road from i Harimohan Sinha Sarani road to Animesh Sinha house road and ii Harimohan Sinha Sarani to Bijoya Sinha house road during the year 2025 26 SH RCC Pavement
Mtc Of Type I and Type II Quarters under Kumarghat PWD R and B Sub Division during the year 2026 27 SH Dismantling Plastering Painting etc
Mtc Of Type III and Type IV Quarters under Kumarghat PWD R and B Sub Division during the year 2026 27 SH Dismantling Plastering Painting etc
Construction of Market Shed at Lembucherra under Lefunga Agri. Subdivision, West Tripura
Construction of 02(Two) units toilets near Tepania Food Go-down.
Installation live demonstration and commissioning of Moisture analyzer meter Vegetable analyzer meter microscope and other basic assaying equipment in 3 Nos Agri Produce Markets at Kalyanpur Bishalghar and Melaghar under the scheme of eNAM in Tripura
Installation live demonstration and commissioning of Moisture analyzer meter Vegetable analyzer meter microscope and other basic assaying equipment in 3 Nos Agri Produce Markets at Natun Bazar Garjee and Barpathari under the scheme of eNAM in Tripura
Development of road from PWD Road to Sashanghat via Samir Malakar Length 0 520 Km Ch 0 260 km to 0 520 km under Saidarpar GP under Special Assistance to State for Capital investment during the year 2026 27 within the jurisdiction of Ganganagar PWD
Development of road from PWD Road to Sashanghat via Samir Malakar Length 0 520 Km Ch 0 00 km to 0 260 km under Saidarpar GP under Special Assistance to State for Capital investment during the year 2026 27 within the jurisdiction of Ganganagar PWD
Construction of a separate entrance point on the first floor of the Court building of the District and Sessions Judge, Khowai Tripura under the Vulnerable Witness Deposition Centers VWDC scheme during the year 2026 27 SH Earth work PCC RCC works Tru
Repair of Type-4 old government Residential Quarters 2 Nos at Chebri PHC Khowai Tripura during the year 2026 27 SH Repairing of quarter building under PWD RandB, Khowai Division 27 Promodnagar Kalyanpur Constituency.
Maintenance of Kalyanpur Communication office Building by providing some new GCI sheets in roof woods works ,Plastering Doors, Windows hardboard ceiling etc, including ,Painting inside and outside at the premises of Kalyanpur Police Communication
Providing and fitting fixing of electrical accessories, spare of panel board of different water supply schemes at different locations under Bokafa RD Block area within the jurisdiction of DWS Sub-Division Santirbazar during the year 2026-27.
Construction of RCC Double Cell Box Culvert 6m x 5m at Nursery Para near the house of Shri Bikash Paul Ward No 8 under Panisagar Nagar Panchayat
Providing E.I works for 3 phase load distribution at O/o the Commissioner of Taxes P.N. Complex Gurkhabasti Agartala
Extension of different dia with repairing of leakage and washing of existing pipeline and other works in DTW schemes at different locations under Santirbazar municipal Council under DWS Sub-Division Santirbazar during the year 2026-27 (Deposit Work).
Development of Road Under Ward No.17 of 7-Ramnagar AC i)TCS building to Jumpoi Shop at Old Kali Bari Lane Ch.0.00 m to 420 m, ii HO Sudip bhattacharjee to Ho Dibakar Debnath L 162.00 m iii HO Biplab Acharjee to Ho Nirmal Sarkar Near Nabagraha Mandir
Providing Special repair Maintenance to E.I work in the EMR School and in attached hostels BoyGirls Khumulwng Jirania West Tripura SITC of outdoor Street light Fixtures
Construction of Temporary structure at roof of existing new Degree Campus of TIT during the year 2025-26 SH Constn of RCC Brick work Tiles work Aluminium works GCI sheet Providing Internal Electrification on the roof of the existing building
Construction of Retaining Wall back side of Market Stall near District Hospital at Ward No-05, Santirbazar under Santirbazar Municipal Council
CONSTRUCTION OF C.C ROAD INCLUDING FORMATION OF ROAD, BRICK SOLING, SIDE DRAIN, FROM WEST PWD ROAD TO UJAN NIMAI PARA VIA PADARAI PARA AT EAST TAKARJALA VC UNDER JAMPUIJALA R.D BLOCK. (L-1375 MTR), SEPAHIJALA DISTRICT, DURING THE YEAR 2026-27.
Estimate for Bamboo Palasiding at different locations of Panisagar Nagar Panchayat
Construction of 02 Two N0s Deep Tubewell near the land of Piter Debbarma So Satindra Debbarma near the land of Jyotsna Debbarma Do Nirmal Debbarma at Ward No 01 of Suttermura VC under Charilam RD Block during the year 2026 27 under WR Sub Division
Running maintainance of different L I schemes at Melaghar Municipal Council Sonamura Nagar Panchayet during the year 2026 27 under W R Sub Division Melaghar Repairs of pump motor suction delivery line including panel board equipment re winding
Renovation of the Office Room of Chief Engineer PWD Water Resource Kunjaban Agartala including replacement of existing doors with new doors tiles work installation of walling false ceiling renovation of toilet block repairing of plumbing system and o
Running maintenance of different MI Schemes within Dukli RD Block under WR Sub Division Agartala Repairing of pump motors suction line delivery line inc panel board equipments and rewinding of motors etc and other allied works during the year 2026 2
Shifting of Shibnagar II LI Scheme at K K Nagar GP under Bishalgarh R D Block during the year 2026 27 SH Re construction of pump house and other allied works under WR Sub Division Bishalgarh
Mtc Of different M I scheme during the year 2026 2027 under W R Sub Division Agartala SH Mtc of PVC distribution system of different L I schemes washing of pipe line of different M I schemes and other allied works under AMC area
Construction of 2 two nos Deep Tube Well under NABARD RIDF XXVIII during the year 2022 23 SH Construction of 2 Two Nos Pump house installation of Submersible pump motors PVC distribution system during the year 2026 27 at DTW scheme at Kala Cherra
R/Mtc DTW schm Wthin MTB/ SH- Remodelng, Mtc demaged piplne at Chandrapur R/F GP, Chandrapur Colony GP, Kunjaban GP, Purba Kunjabn GP, Simsima GP, Jowalikhamar GP, Holakhet GP undr DWS SD-II, durng year 2026-27.
Development of road from Halaimura road near the house of Biswajit Das to Manu river Sangam via Bhairabthali in c allied roads Total length 900 00 mtr under Scheme for Special Assistance to States for Capital Investment for 2026 27 SH Patch GSB
Patch WBM, Grouting, Re-carpeting , seal coating, Protection work and road side pucca drain etc.
Construction of following road using Paver Block 1 NH to Samiran Das house Ward No 2 2 Radha Krishna Palli Road to Sandip Das house Ward No 1 3 Ananta Das house to Kamal Baidya house Ward No 5 4 Malik Bari to Karuna Das house Ward No 2 under PNS NP
RWS schemes in North Tripura District under 16th FC state fund 2026-27/ SH- Maintenance of existing pipeline and other allied works within the jurisdiction of Panisagar RD Block under DWS Sub-Division Panisagar
Construction of Paver Block road 1 Sukendhu Nath to Rajendra Nath house Ward No 8 2 Uttam Shil house to RCPE gate Ward No 9 3 Kripesh Nath house to Rajendra Nath Lane Ward No 12 4 BSF Rd to Biplab Paul house Ward No 8 5 Old Post Office rd to Mrinal B