Loading…
Loading…
5,182 results • Latest
Mtc of road from KCP to Dasda (L-13.30km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH- Providing, placing and laying of Brick Soling and edging etc portion 2.18km to ch 4.36km.
Urgent mtc. of road from KCP Bazar to Dasda Bazar ( L-13.30km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH- Patch WBM-3, patch Carpeting, Seal Coat etc portion from Ch. 0.00km to Ch. 13.30km.
Construction of Brick soling road with RCC drain from Baxonagar road to Sumit Das house under Bishalgarh Municipal Council WNo 9
Construction of betel leaf paan whole sale shop 06 nos at the back side of TSCB Udaipur branch UMC_UDP_2025_26 SH_ 02 block each of 03 shop.
Construction of vegetable whole sale shop 06 nos at the back side of TSCB Udaipur branch UMC_UDP_2025_26 SH_ 02 block each of 03 shop.
Development of Yard at Khayerpur Market under Old Agartala Agri Sub Division.
SH - metalling, carpeting and sand seal coat during the year 2025-26.
Temporary Protection of RCC Foot Bridge over Sonai River East Bank and West Bank from massive Erosion of Both Side at Birmohan Para Under Lefunga RD Block under R.D Mohanpur Division.
Construction of Effluent Treatment Plant (Civil work) at Manughat C.H.C under R.D Manu Division, LTV, Dhalai District, Tripura.
Maintenace of CC Road drain and construction of slab from ABC Lane to Samir Datta via Anil Chakraborty under ward no_11_UMC_UDP_2025_26 Total Length Drain 61.00 m and No of slabs 60 Nos.
Extension of pipeline at various water supply schemes along with providing FHTC and other allied works etc. under DWS Sub-Division, Manu during the year 2025-26. (Job No. TR/JJM/Coverage Fund/EE/PWD(DWS)/DIVN/AMB /07/2025-26)
Construction of CC road and Paver Block Road including masonry drain from the PWD Road to house of RanjanBanik to BikashBanik via SankarBanik at Ward No 11 UMC_UDP_2025_26 Length of Drain 77.00 m. and Length of Road 79.00 m.
Construction of Paver block road from Madhya Boxanagar Girls School to IBB road via Gani Miah house (L-0.480 km) portion from 0.315 km to 0.480 km under Boxanagar block during the FY 2025 26(2nd Call)
Construction of Cement Concrete road from Judhisthir Ghosh house to Benu Sharma house at West Laxmibill under Bishalgarh Municipal Council. WNo - 05
Construction of CC road including RCC drain with cover slab from Gopal Roy house to near Tutan Saha house at West Laxmibill under Bishalgarh Municipal Council. WNo - 05.
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using manual means and other allied works.
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using manual means and other allied works.
Construction of Open Shed with toilet block of Govt registered employees Housing Co Operative Society Ltd at Renters colony Agartala, AMC
SH -Patch metalling, re-carpeting and seal coat. (Portion from 0.00 km to 1.50km).
Construction of Paver block road including protection wall from PWD road to the house of Swadesh Datta at ward no_22_UMC_UDP_2025_26 Length of protection wall 90.00 m. and Length of Paver block road 152.00 m.
Mtc. masonry drain including cover slab and construction of paver block road from the PWD road to the house of Madhu Saha at ward no_04_UMC_UDP_2025_26 Length of road and drain 82.00 m.
Construction of paver block road with masonry drain including cover slab from the house of Biplab Deb to the house of Badal Debnath at ward no_04_UMC_UDP_2025_26 Length of road and drain 43.00 m.
Construction of Farmers Knowledge Centre at Ganki under Khowai Agri Sub Division SH Providing internal Electrification.
Supply of Major carp fingerlings (10 cm and above) to the different GP/VC, Nagar Panchayat of Sabroom Sub-division during the year 2026-27
Supply of Major carp fingerlings (7 cm and above) to the different GP/VC, Nagar Panchayat of Sabroom Sub-division during the year 2026-27
Please refer to DNIeT
Supply of 2250 kg Potash Fortified with Silicon Fertilizer during 2025-26
Construction of 48 Flood Protection Anti-erosion structures in 06 districts of Tripura Anti-errosion work of Kasba East LI Scheme of Kasba GP under Bishalgarh RD Block from the erosion of Local cherra for the length of 75 mtr Right and Left Bank
EOI for addendum-inclusion in present empanelment list of Vendor/manufacturer/authorised distributor/authorised dealer to sell organic inputs during 2024-25 to 2026-27
Shade Net 50 pc and 75 pc/UV film 200 micron/HDPE Vermi Bed/Coco peat/Vermiculite/ Perlite / Ethrel and Sodium Carbonate (For Pineapple staggering)/Pro Tray
Different developments works in newly constructed 14 plus 1 Nos Government Quarter Complex at Bhallukya Tilla Agartala under the jurisdiction of Capital Complex Subdivision No II under Capital complex Division building during the year 2025 26.
Maintenance and Modification of Water supply system , existing roof of Green House Shed with Galvalume sheet and Residence Name Board etc. including other ancillary works in the Bungalow of Hon ble Chief Justice, the High Court of Tripura at Ne
Transportation of TPS Tuberlet, ARC and G-0 ARC potato from different Agri/Horti Sub Division to different cold storages
Development of Rural Market at Gandatwisa Market 3 Storied Building at Ditch under Dhalai Tripura District
Construction of Blacktop road from AA road to Nikhil Bhowmik house via Rajendra Nama at Ward-03 under RD Kumarghat Division during fy 2025-26.
Construction of Halambasti Ayushman Arogya Mandir under Tilthai PHC under RD Dharmanagar Division
Construction of Beat Office cum Quarter at Deo RF under Manu Range under Manu Forest Development Agency
Construction of Beat Office cum Quarter at Madhya Chailengta under Chailengta Range under Manu Forest Development Agency
Upgradation of existing 200KVA DTR to 500 KVA DTR at Narikel Kunja under ESD-Gondatwisa
Construction of Coffee board building under Jampui Hill RD Block during the year 2025-2026/SH-- Construction of single storied residential building in/c construction of Toilet sanitary works etc
Mtc. of Bhelianchip village approach to Airtel Tower road under Jampui Hill Sub-Division PWD RnB during the year 2025-2026/SH-- Paver Block Earth work PCC n RCC work etc.
Urgent mtc of road from Dasda to Anandabazar road (L-12.57km) under Dasda Sub-Division,PWD(RnB) during the year 2025-26/S.H Construction of CC drain portion from ch 6.00km to ch 12.57km
Urgent Mtc of road from DSD-ABZ to Helenpur HSCL road via Dasda SPO camp (L-0.500 km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH. WBM-2, WBM-3, Carpeting, Seal Coat etc.
Urgent maintenance of all official buildings along with quarters of Kunjaban extension, Agartala under Capital Complex Sub-Division No-I during the year 2025-26.
Repair of 3(Three) nos. School under Killa and Tepania Block, Gomati District under Repair/ restoration of immediate nature of damaged infrastructure of school building
Repair of 3(Three) nos. School under Killa and Matabari Block, Gomati District under Repair/ restoration of immediate nature of damaged infrastructure of school building
Providing Electrical installation
Internal electrification work for the Construction of Ayushman Arogya Mandir (Ayush) at Kusharghat SC of Jolaibari RD Block under R.D. Santirbazar Division (Govt. Homeopathic Dispensary)
Construction of Lamps Bazar Market stall at Purba Pilak VC under Jolaibari RD Block (Ancillary and balance work) (PWD SoR 2023)
Construction of Mid Day Meal Dining Hall at Batuabari SB School under Mohininagar VC of Hrishyamukh RD Block (PWD SoR 2020)