Loading…
Loading…
4,322 results • Latest
Construction of mini-stadium karanpur village block Jaspur in District US Nagar
Construction of a building at Government Intermediate College Pati.
Flood Protection scheme of Sirkhola and kachlakot village at Left and Right Bank of Ladhiya River in Block Okhalkanda Distt. Nainital Under SDMF. (Reach- Sirkhola village Km 0.00 to 0.550 KM and kachlakot village KM 0.00 to 0.170 KM)
Hiring of one number diesel driven vehicle model 2024 or later along with services of driver for a period of one year for departmental use for office of Executive Engineer M and G Sharda Power House Lohiahead Khatima
Flood Protection scheme in Right Bank of Loogar River in Block Okhalkanda Distt. Nainital Under SDMF. Reach KM 0.00 to 0.550 KM)
MAINTENANCE AND OPERATION OF 33/11 KV SUB STATIONS, ITS ASSOCIATED HT/LT LINES, ATTENDING BREAKDOWNS AND COMPLAINTS OF CONSUMERS UNDER 33/11 KV SUB-STATION BARKOT, BARNIGAD AND RAJSTER ALONGWITH VARIOUS OFFICE RELATED WORK UNDER EDD, BARKOT
Work of Earthing audit Health Assessment of existing AIS Substation at Dehradun
MAINTENANCE AND OPERATION OF 33/11 KV S/S HERBERTPUR, SAHASPUR AND RUDRAPUR AND ASSOCIATED HT/LT LINES AND ATTENDING BREAKDOWNS AND COMPLAINTS OF CONSUMERS UNDER EDSD, HERBERTPUR UNDER EDD, VIKASNAGAR
CONSTRUCTION WORK OF NEW 11 KV LINE FROM TIMALI FEEDER TO FATEHPUR FEEDER, UNDER EDSD, HERBERTPUR, UNDER EDD, VIKASNAGAR
Under the announcement No 708 2025 of the Honble Chief Minister a plan for the drainage of waterlogging from the rainwater drain in the Kaniya Nayi Basti and Himmatpur Dotiyal populated areas in Ramnagar block of Nainital district
Work of one number discharge gate and strengthening of berrel in naini lake at nainital
Construction work of Community Hall in Kichha (U.S. Nagar)
Supply of 8.5 Meter Long PCC Pole 40,000Nos
Supply and Fixing of NIFPS spares at 220 KV Substation Jafarpur under 220KV OandM Division, PTCUL, Jafarpur
Repair and Maintenance work of guard room at 132 KV Substation Almora under 132 KV OandM Division, PTCUL, Almora
etender for data processing pre registration 2026-27 and pre and post exam work of data processing for highschool and internediate 2028
Construction work of CC road towards village Gahana under development block Ramgarh under the area of Mandi Samiti Haldwani.
Construction work of the road from Dade Dhani Chayur Tok Gram Panchayat of Gangolihat development block of Pithoragarh district towards Malla Dade Haru temple.
Construction work of CC road from Lakhuudiar Road Painting to Lakhuudiar adjacent to NH 309 B in village Digoli of village Bhausiyachana of development block under Almora district.
Work of replacement, overhauling and testing of faulty 33 KV and 11 KV VCB Panel at 33/11 KV S/S Mahuadabra under Electricity Distribution Sub Division (First) Jaspur.
Involvement of chota kailash shiv mandir within mala mission under CM ghoshna no 667/2025
Infrastructure development of village maat kasar devi distt. almora
Work of replacement of damaged LT AB cable and laying new cable under Purvi Feeder of Electricity Distribution Sub Division (Second) Jaspur
Involvement of Gwel devta mandir Vinayak in Bhimtal Block within Mala Mishan Under CM Ghoshna No 669/2025
Construction of paking and Upgradation of Kitchen, Dining of TRH Parichay Naukuchiyatal
Work of replacement of damaged LT AB cable and laying new cable under Sarverkhera feeder of Electricity Distribution SubDivision (Second) Jaspur.
Infrastructure Facility Development of Golju Temple Ghorakhal within Manaskhand Mala Mishan Scheme
Work of replacement of damaged LT AB cable and laying new cable under Paschimi feeder of Electricity Distribution Sub Division (Second) Jaspur
Polishing and repair work in dormitory, reception, managers room and cottages in Tourist Rest House Sattal.
Site Development and Beautification of Golu Temple in Village Chaura, Someshwar Distt. Almora.
Supply of Furniture in 16 Rooms of Janta Lodge of TRH Kausani
Construction of Doormatry in TRH Tallital Nainital
Site development and Beautification work Ancient Golu Temple village Raturath Someshwar Distt. Almora
Construction work of CC from the main road to the fields of Shri Deepak Singh Negi, Shri Shailendra Negi, Shri Manoj Negi, Shri Devendra Negi, Shri Sanjeev Negi etc. in Gram Sabha Harsan under the area of Vikas Block Bajpur.
Upgradation of 02 Cottages and 03 Rooms of TRH Sukhatal Nainital
Work of replacing damaged LT AB cable and additional phase under Basai feeder under Electricity Distribution Sub Division (Second) Jaspur.
Honble CM announcement no. 536/2024 Construction work of 700 meter CC roads of internal roads of village Bajpur
Construction work of two additional classrooms in Government Inter College Namti Chetabagad.
Construction work of approach road (approximately 500 meters) for the under construction building of Sub Divisional Transport Office, Roorkee.
Construction of RCC checkdam Guide walls Supply and fixing HDPE pipe wire crates
Construction work of building for Rajkiya Ayurvedic Chikitsalaya, Bhagwanpur, Haridwar
Janpad pauri garhwal ke vikaskhan kot ke antargat khandah ooni asnoli motor marg ke km 4 wa 5 awam dehalchauri se manjinkanda motor marg ke km 1, 2 wa 3 me PC dwara Navineekaran ka karya
Construction of check dam Chaunola
Construction of 02 Classrooms and 01 Headmaster Room at Government Upper Primary School Patuli in Thalisain Development Block Pauri Garhwal District.
Construction of 02 Classrooms and 01 Headmaster Room at Government Primary School Sunar Gaon in Thalisain Development Block Pauri Garhwal District.
Supply and installation of Solar Pump with all accessories LDPE tanks HDPE pipe and Construction of checkdam
Construction of 02 classrooms and 01 Headmaster room at Government Primary School Dobri in Thalisain Development Block Pauri Garhwal District.
Construction work of playground and security wall at Govt. Degree College, Uffrainkhal (Pauri Garhwal)
Supply of Decentralized material for Shifting the electric lines in the National Highway
Construction work of boundary wall, fencing and approach road at Govt. Degree College, Lamgara (Almora)