Loading…
Loading…
4,324 results • Latest
Supply of NSC Decentralized Material under 33/11 KV Sub Station Doraha/Pipliya
Erection of Pcc Pole and Supply of Material under 33 KV Sub Station Pipliya
Erection of Pole and Installation of DTR for NSC work under 33/11 KV Sub Station Kelakhera
Erection of PCC Pole and Supply of Material in 33/11 KV Sub Station Fouji Colony
Confirmatory Survey, Design, Construction of DIP SPS and laying of sewer line, testing and commissioning with all appurtenant works for Devanchal Vihar, Lower Rajeev Nagar and adjoining area sewerage scheme Dehradun
Construction for Road restoration work for Avas Vikas Colony Indira Nagar (with one year defect liability period) of all material, labour T and P etc. for Avas Vikas Colony Indira Nagar, sewerage Scheme Dehradun under State Sector Programme
Construction of OHT Tube Wells Pump House Toilet Boundary wall and Laying and jointing of Rising Main and Distribution system of Patel Nagar (East) Water Supply Scheme under SASCI Programme.
Construction of OHT, Tube Wells, Pump House, Toilet, Boundary wall and Laying and jointing of Herbertpur Pumping Water Supply Scheme under Amrut-2.0 Programme
Construction of OHT Tube Wells Pump House Toilet Boundary wall and Laying and jointing of Rising Main and Distribution system of Sankriti Lok Colony Water Supply Scheme under SASCI Programme.
SUPPLY, INSTALLATION AND COMISSIONING OF 15 Nos SOLAR DRYER (100 KG) IN VILLAGE SITUATED AT OKHALKANDA AND BHIMTAL BLOCK OF DISTRICT NAINITAL
Construction of OHT Tube Wells Pump House Toilet Boundary wall and Laying and jointing of Rising Main and Distribution system of Indra Nagar Seemadwar Water Supply Scheme under SASCI Programme
Confirmatory Survey, Design, Construction and laying of sewer line, testing and commissioning with all appurtenant works for Saket Colony, Canal Road (Left Over area of Zone-C) sewerage scheme.
Confirmatory Survey, Design, Construction and laying of sewer line, testing and commissioning with all appurtenant works for Pathriyapeer, Neelkanth Vihar, Indira Colony, Chukkhuwala and adjoing area sewerage scheme Dehradun.
Confirmatory Survey, Design, Construction and laying of sewer line, testing and commissioning for Kaulagarh Left Over Area sewerage scheme Dehradun under State Sector Programme
Construction for Road Restoration Work in Om City, testing and commissioning with one year defect liability period with all appurtenant works Under Om City and Kusum Vihar Colony, Sewerage Scheme Dehradun.
Supply of NSC Decentralized Material under 33/11 KV Sub station Kelakhera
Installation of New DTR under 33/11 KV Sub Station Pipliya
Installation of New DTR under 33/11 KV Sub Station Kelakhera
Erection of pole and TF for NSC Work Under 33/11 KV Sub station Fouji Colony/Ittawa
Installation of New DTR under 33/11 KV Sub Station Barhani
Supply of NSC Decentralized Material under 33/11 KV Sub Station Fouji Colony/Ittawa
Erection of PCC Pole and Supply of Material in 33/11 KV Sub Station Barhani
Feeder Divided on 11 KV Sarkara Feeder and supply of material in 33/11 KV Sub Station Fouji Colony
Erection of Pole and supply of material under 33 KV Sub Station Kelakhera
Installation of interlocking tiles along the PWD road from Udham Singh Park to Devendra Singh Mongolia residence in Ward No 6
Construction work of interlocking tiles in Lakshmipuram and Prayag Enclave in Ward 99 of Doiwala Constituency of Dehradun district under State Sector.
Construction work by interlocking tiles in internal roads like Nageshwar Puram, Chitra Vihar etc. in Nakraunda under Doiwala constituency of Dehradun district under State Sector.
ANNUAL MAINTENANCE WORK OF RING MAIN UNIT AT SERAGHAT IN JAULJIBI SECTION UNDER EDSD DHARCHULA
Supply, Installation and Commissioning of ACB on 250 KVA DTR under EDSD Turner Road.
Confirmatory Survey Design Construction and laying of sewer line connection to existing sewerage network testing and commissioning for Inderlok Vihar and Capital Greenz Home Colony Dehradun
CONSTRUCTION OF 11 KV LINE TO CONNECT VILLAGE CHODIYAR TO GANURA IN GANGOLIHAT SECTION UNDER EDD PITHORAGARH
CONSTRUCTION OF 2.1 KM 11 KV LINE WITH SUPPLY OF MATERIAL FOR BELPATTI PEYJAL SCHEME IN 5 STAGES UNDER EDD PITHORAGARH
SUPPLY OF MATERIAL AND REPLACEMENT OF POLES AND INSTALLATION OF ADDITIONAL POLES IN VARIOUS VILLAGES OF GANGOLIHAT SECTION UNDER EDD PITHORAGARH
11- Construction of CC road and iron channel from Atiqurrahman house to Inamullah house in Ward No. 34.
19- Construction of Jyotiba Phule Gate on the main road in Matlabpur, Ward No. 40.
Providing of 01 Nos Clerk/ Office Assistant through outer agency under EDD Jaspur for Work of Data entry, typing on computer both in Hindi and English language, book keeping, and office record file handling and work of movement of files etc. amon
18- Construction of a road with colored interlocking tiles and drainage systems on both sides from Radhika Chakki to Garibdas house in Indira Vihar Colony, Ward No. 39.
2- Construction of an RCC slab over the drain near Solani Enclave in Ward No. 3, up to Tasty Heaven Restaurant, and construction of chambers every 20 feet.
Tender For Hiring of agency for Bus Washing/ Security/CCTV monitoring and Parking/ Cleaning of Premises with Related Man Power
Construction of large gates at both entrances of the Gihara communitys residence in Ward No. 28.
5- Construction of the main gate at the ancient temple near Chandrapuri Rickshaw Stand in Ward No. 28.
10-Construction of CC road and drain from Master Shakeel house towards Unique Dairy in Ward No. 33.
Construction of Approach Road and 6 nos type-II Residential Quarter of Judicial Department at Village Tunalka, Block Naugaon, in dist. Uttarkashi under State Sector
WORK OF REPAIRING OF WALL AND GATE OF 400 KV SUBSTATION RISHIKESH
WORK OF REPLACEMENT OF SHADE OF STORE AT 400 KV OandM DIVISION, RISHIKESH
Solar Water Lifting Pump
9-Construction of drain and CC road from Bilal Qureshi house to Bittu Tea Stall house and CC drain construction in Chuchubhai lane in Ward No. 33. 10- Construction of CC road and drain from Master Shakeel house
Construction of road in Ward No. 28, in the lane from contractor Ajay Goyal to Vijay Sharma, opposite DAV Roorkee.
Work of replacing the transformers which get damaged from time to time in 33/11 KV Electricity Substation Sitarganj
HT Line Shifting Sidcul Near Belmark Company under Electricity Distribution Sub Division II Sitarganj. (Deposit Head)