Loading…
Loading…
1,32,261 results • Latest
Operation and maintenance of Street Light and High Mast lights including replacement of faulty luminaries installed at Ward office and different Borough offices,Community centers, Compactor stations and other services under BMC for 365 days ward-11
Annual Mtc. Of pipeline and other misc works related to pipeline of Rajabhat WSS under Alipurduar Division, P.H.E. Dte. (For 12 months)
INSTALLATION OF SOLAR LIGHT NEAR DAS PARA HARI MANDIR, HANUMAN JEW MANDIR, BHUNIA PARA MANASA MANDIR, PINTU DAS HOUSE(APAS/01/213/59/0010)
Construction of cover drain from the house of Susen Dey to the house of Swapan Saha, SWAMI VIVEKANANDA, PS NO.-137 (APAS/01/131/137/0003)
Repairing work of the existing toilet of BLDO under Ratua-II Dev Block
RAISING MANHOLE COVER, SICP COVER CATCH PIT COVER AT B.M.ROAD,A.C.B ROAD,R.R. M. ROAD AND DIFFERENT LOCATION IN WARD NO.- 034
UPGRADATION AND INTERIOR WITH FURNITURE AND FITTINGS VILLAGE id-
REPAIRING AND UPGRADATION OF ROAD TO A CC ROAD OF 50 M LONG WITH 3.0 M WIDTH FROM THE PWD ROAD TO SARIFUL HOUSE AT HOSNABAD
C.C. ROAD FROM ASTANA TO BAIJAT KHANS HOUSE, (VIA SERAJUL KHAN) PLOT NO. - 722 TO 737 UNDER BOOTH No. 199 - Aamdai Kaderia Primary School
Annual Mtc of AC Machine at different places of Circuit House,DM ADM(G) ADM(LR) ADM(Dev) and SDO Bungalow under JE-1 Krishnagar
Annual Mtc. Of pipeline and other misc works related to pipeline of Jaigaon (Zone-I,II,IIIA,IIIB, IV, VA, VB and Old) WSS under Alipurduar Division, P.H.E. Dte. .(For 12 months)
Upgradation of concrete road from ICDS centre to the house of Palash Maity, SWAMI VIVEKANANDA, PS NO.-137 (APAS/01/131/137/0002)
Caretaking, attend of Guest including maintaining of Guest register, making close contact with office and other allied works for Bongaon Office Rest House under Bongaon Sub-Division P.H.E.Dte. Period form-01.02.2025 to 31.01.2026 (365 Days)
REPAIRING CC ROAD FROM THE HOUSE OF SANJOY HORE TO H/O OF HARU KAHAR KALITALA BHAWANIPUR MATHPARA. (APPROX -300 FT)
IMPROVEMENT OF DRAINAGE SYSTEM FROM 16/3 TO 16/15A DR SURESH CH. BANERJEE ROAD IN WARD- 34
Operation and maintenance of Street Light and High Mast lights including replacement of faulty luminaries installed at Ward office and different Borough offices,Community centers, Compactor stations and other services under BMC for 365 days ward-9
Special repair of external face of South Block (four storied building) and West Block (ten storied building) of Jalasampad Bhawan at Salt Lake City, PS-Bidhannagar North, Dist- North 24 Pgs
Annual Mtc. Of pipeline and other misc works related to pipeline of Tasti TG WSS under Alipurduar Division, P.H.E. Dte. .(For 12 months)
CC ROAD FROM ARATI RANJIT LAND TO KARTIK RANJIT HOUSE, PLOT NO.1491under Booth No.207 - Barada Magunicharan Junior High School.
WASHING AND PAINTING OF GUARD RAILING INCLUDING KERB AT A.P.C.ROAD FROM SHYAMBAZAR 5 POINT CROSSING TO KHANNA CROSSING UNDER BR-II.
INSTALLATION OF HIGH-MAST SOLAR STREET LIGHT NEAR THE HOSNABAD JUMMA MOSQUE(24.257585,88.386722) AT HOSNABAD
CONSTRUCTION OF NEW CC ROAD FROM THE HOUSE OF SANAT SARKAR TO HOUSE OF SUBIR SARKAR BHAWANIPUR MATHPARA. (APPROX - 60FT)
SUPPLY AND LAYING OF 150MM DIA SW PIPE AT UNPIPED ZONE OF 23B/1, R.R. MITRA ROAD TO 33/1A, ABINASH SASHMAL LANE AND SURROUNDING AREA IN WARD -034
CONSTRUCTION OF CONCRETE ROAD FROM GOUR GHORAI HOUSE TO RADHASYAM MALI HOUSE, , MOUZA- PURUNDA, PLOT. NO.- 674 TO 675 under Booth No.-202 - PurundaSarbamangala Primary School (Uttarangsha) within RBC GP
EI works with SITC of Single phase split AC machine for the newly constructed conference room at ZARS Krishnagar-- EI Work
Sinking of one number tube well 100mm X 50mm with Installation of 1HP Submersible pump with motor set and allied works at Amoragori CCC Under Howrah Division II in the District of Howrah
Operation and maintenance of Street Light and High Mast lights including replacement of faulty luminaries installed at Ward office and different Borough offices,Community centers, Compactor stations and other services under BMC for 365 days ward-9
Annual Mtc. Of pipeline and other misc works related to pipeline of DakshinRangalibazna WSS under Alipurduar Division, P.H.E. Dte. .(For 12 months)
Construction of drain from west side of Bisadu house to Bura Dharla at Jongra Mouza JL No-228 under Haribhanga Gram Panchayat.
CONSTRUCTION OF BURNING CHULLY AND INSTALLATION OF TUBEWELL AT KATHANDARI PASCHIM SAMSAN and others 4
REPAIRING OF PAVER BLOCK FOOTPATH FROM 140 TO 152 AND 1 TO 131/12/1 R.R. MITRA ROAD IN WARD 34 DISTURBED AND UNDULATED DUE TO NATURAL WEAR AND TEAR
CONSTRUCTION OF CONCRETE COVER DRAIN FROM RAHUL MONDAL HOUSE TOWARDS MAIN DRAIN AT SEHARAKURI
CONSTRUCTION OF CONCRETE ROAD FROM SABESWAR BHUNIA HOUSE TO MANGOBINDA BHUNIA HOUSE, , MOUZA- PURUNDA, PLOT. NO.- 512/1961 TO 518 under Booth No.-202 - PurundaSarbamangala Primary School (Uttarangsha) within RBC GP
1. Repairing work of Permanent poly-net house tubular structure 200 sqm at Krishi Bhavan Premises, Abash, Paschim Medinipur 721102. 2. Repairing work of Permanent poly-net house tubular structure 200 sqm at PVS(M) Farm, Anandapur, Paschim Medinipur
Annual Mtc. Of pipeline and other misc works related to pipeline of Uttar Rangalibazna WSS under Alipurduar Division, P.H.E. Dte. .(For 12 months)
INSTALLATION OF SOLAR LIGHT NEAR KANAI SASMAL HOUSE, DEBASIS ADAK HOUSE, MANDAL PARA SUBMERSIBLE, PHANIBHUSAN BERA HOUSE, RAJKUMAR BHUNIA HOUSE(APAS/01/213/59/0012)
CONSTRUCTION OF NEW CC ROAD FROM THE H/O ATANU SHAI TO H/O SANJOY KARMAKAR.
Sinkining of community level 5Nos different Place Tubewell with platform soak pit at Natungram
Operation and maintenance of Street Light and High Mast lights including replacement of faulty luminaries installed at Ward office and different Borough offices,Community centers, Compactor stations and other services under BMC for 365 days ward-8
Construction of ACR at Hazratpur 2 Pry School 19081106704 jl-118 plot-652 under Khoyrasole Block
SUPPLY OF SERVICES OF ELECTRICAL SYSTEM FOR OPERATION AND ROUTINE UPKEEPING OF STREET LIGHTING SYSTEM IN WARD NO.-63, UNDER BR-VII..
Implement of safe drinking water point with soakpit at Gouranga Bazaar Swasan ghat at Haribhanga mouza JL no 229 Booth No-132 under Haribhanga Gram Panchayat.
Construction of 280 Capacity Auditorium at Karimpur Nadia --- Additional work for AC System
CONSTRUCTION OF CONCRETE COVER DRAIN FROM AJAD MIYA HOUSE TOWARDS FULJAN MIYA HOUSE AT SEHARAKURI
REPAIRING OF TAP WATER PLATFORMS AT 28/1 M.P ROAD, 1 SREE KRISHNA COLONY AND DIFFERENT UTTARAN LOCATIONS IN WARD NO.-32
Annual Mtc. Of pipeline and other misc works related to pipeline of Dimdima (Z-I AND II) WSS under Alipurduar Division, P.H.E. Dte. .(For 12 months)
Extension of road from SHIKHARPATRBAR OCC pucca road to GOPAL JANA HOUSE APAS/01/213/32/0013
- WASHING AND PAINTING OF GUARD RAILING INCLUDING KERB AT BIDHAN SARANI FROM GALLIF STREET TO BEADON ST CROSSING UNDER BR-II.
CONSTRUCTION OF CONCRETE ROAD FROM SANKAR JANA SHOP TO KANAI DAS SHOP, , MOUZA- PURUNDA, PLOT. NO.- 822 TO 832 under Booth No.-202 - PurundaSarbamangala Primary School (Uttarangsha) within RBC GP
Installation of 1 Nos high-mast solar street light near the Natungram Jumma Masjid at Natungram