Loading…
Loading…
2,453 results • Latest
REPAIR / MAINTENANCE OF COOLING APPLIANCES AND OTHER CONNECTED WORKS UNDER GE (S) TEZPUR
Civil material rate contract
Electrical Material Rate Contract
EOI Concept for Unipole on PPP Model for DDK Guwahati Cluster
SET OF BRAKE PIPE ARRANGEMENT OF FIAT BOGIE AS PER RCF DRG. NO. LW36005,
SET OF HIGH TENSILE SOCKET HEAD CAP SCREW FOR AIR SPRING ASSEMBLY CONSISTING OF 03 ITEMS :- (1) High tensile hexagonal socket head cap screw, M20X55 long, IS: 2269-2006 with latest revision and amendment, class 10.9 or higher, QTY = 01NO (2) Hardened and tempered washer with 300 HV class (300 HV - 370 HV) hardness. A 22, lS:2016-1967(Reaffirmed2021) with latest revision and amendment, QTY = 02 NOS (3) Prevailing torque type hexagonal nuts (with non metallic insert), M20:B, lS: 7002-2005 with latest revision and amendment class 10, QTY = 01 NO. Surface finish of fasteners:-All fasteners (screws, washers & nuts) shall be Zinc electroplated to A3L finish of lS:1367, Part -11- 2002 with latest revision and amendment.