Loading…
Loading…
9,489 results • Latest
HAS-MAJN Sec: Elimination of unmanned LC No. 78 at km.119/600-700 by diverting road traffic through ROB No. 444
SPGR-ASK SECTION: PROPOSED CONSTRUCTION OF RUB IN LIEU OF LC NO. 72 AT KM 122/500-600 BETWEEN BSN-RDI STATIONS
MLF RS 20498 EMD RS 61494 AREA 678.52 sqft Vacant as on Dt 28-02-2027
SUPPLY OF BANANA LEAFS AND ARECANUT PLATES TO MANDARTHI SRI DURGAPARAMESHWARI TEMPLE UDUPI DIST
Sub Work 1: Provision of a Redundant OFC Path (2x48 core) between Kushtagi (KHTI) Linganabandi(LNBI) section, in connection with new line between Gadag- Wadi.Sub Work 2: Provision of telecom arrangements at Kushtagi (KHTI) station in connection with the new line between Gadag-Wadi.Sub Work 3: Provision of telecom arrangements for the conversion of Kerakalamatti Halt station into crossing station on the Bagalkot-Kudachi (BGK-KUD) new line, and the construction of a new crossing station at Pothnal in the Ginigera-Raichur (GIN-RC) section.Sub- Work 4: Provision of telecom arrangements for crossing station at Malavi (MVY) in the AVC-VC section.
MLF RS 14311 EMD RS 42933 AREA 137.89 sqft
MLF RS 14792 EMD RS 44376 AREA 137.89 sqft
MLF RS 12446 EMD RS 37338 AREA 924 sqft Vacant as on Dt 28-02-2027
Supply, installation testing and commissioning of new mobile workstation for the relay testing/communication works and conducting other diagnostic tests of equipments at Kadra and Kodasalli Power House
MLF RS 5932 EMD RS 17796 AREA 119.97 sqft Vacant as on Dt 09-01-2027
E TENDER FOR MALLAPURA RESERVOIR MALLAPURA VILLAGE GANGAVATI TALUK KOPPAL DISTRICT FOR 5 YEARS FROM 01/07/2026 TO 30/06/2031
MLF RS 5492 EMD RS 16476 AREA 119.97 sqft Vacant as on Dt 09-01-2027
MLF RS 3661 EMD RS 10983 AREA 117.71 sqft Vacant as on Dt 09-11-2026
SUPPLY OF VEGITABELS TO MANDARTHI SRI DURGAPARAMESHWARI TEMPLE UDUPI DIST
Supply Installation and Commissioning of High Resolution Atomic Force Microscope
EMD RS 50000
EMD RS 50000 Vacant as on Dt 14-02-2027
EMD RS 50000 Vacant as on Dt 14-02-2027
EMD RS 50000 Vacant as on Dt 07-10-2026
EMD RS 50000
Construction of Cistern and laying of HDPE pipeline for Drinking water purpose at Ward No 11 and Construction of Cistern at Ward No 17 in Sirwar Town
1) Shimoga Town - Augmentation/Upgradation of existing Running room at Shimoga Town (SMET) with additional 19 bed capacity. 2) Construction of 20 bed new Running room at Chikkamagalur (CMGR) Mysuru division. 3) Construction of 20 bed new Running room at Talguppa (TLGP) Mysuru division.
Drilling of New Borewell and Providing and fixing of Motors Near Anjaneya Temple at Ward No 01,Near IB at Ward No 02,Near Tayamma Camp at Ward No 04,Near Shanthkumar house in Rajivnagar at Ward No 07,BB Patil colony at Ward No 10,Near Bangle Halla at Ward No 16,At Ward No 20,At Anjaneya Temple road and Near Musleppa Math at Ward No 05 in Sirwar Town
Providing and laying of HDPE Pipeline for Drinking water purpose from Jambaldinni Veerangouda house to Kattegadde Basha house to kariyappa house at Ward No 03 and Vijayanagar colony main road to Tanaji layout Ibrahim house at Ward No 06 and Borewell to Ismailsab house at Ward No 08 and Goudru field to Godown at Ward No 09 and Panchayat Garden borewell to Yamunappa house at Ward No 12 and Mounesh shop to Church at Ward no 13 14 15 and Uppar Amaresh house to Uppar Venkatesh house at Ward No 18 and Mantanna field to Reddappa gouda field at Ward No 19 in Sirwar Town
SUPPLY OF DINASI ITEMS TO MANDARTHI SRI DURGAPARAMESHWARI TEMPLE UDUPI DIST
Supply Installation and Commissioning of Multifunctional Floor Mounted Xray Diffractometer
Procurement of Mac Mini (01 No) and BenQ Monitor (01 No)
MULTILAYER CHIP CAPACITORS
Annual maintenance works for the year 2026-27 for the FRP boat shed and Water Quality Laboratory (Level-2) building of the Silt and Sediment Investigation Sub-division, Munirabad.
Annual Maintenance of the Hydraulics Division office premises and surrounding models areas for the year 2026-27
HIRING OF WORKS FOR CANOPY REPAIR, MAINTENANCE AND SIGNAGE/RVI WORKS AT COCO CNG STATIONS, GAIL GAS BENGALURU CGD PROJECT FOR A PERIOD OF TWO YEARS ON ARC BASIS
Selection of agency for providing GIS consultants
Establishing 2x12.5MVA, 66/11kV Sub-station at Paduvalahippe village along with construction of 66kV LILO line on 110kV DC towers using coyote conductor for a distance of 1.520Km from the existing 66kV Kadavinakote-Hanagarahally-Hassan line-1 to proposed Padavalahippe substation in Holenarasipura Taluk, Hassan District on Partial Turnkey Basis including Supply of all Materials/Equipments (Excluding supply of 2x12.5MVA 66/11kV Power Transformers and 11kV Switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning.
Refilling and servicing of fire extinguishers on annual maintenance contract at Shiva HES for a period of One year (Extendable by one more year on satisfactory service).
CONSTRUCTION OF TWO CLASS ROOMS FOR SCHOOL IN KHPS KATABALI IN HUKKERI TALUKA OF BELAGAVI DISTRICT UNDER 4059-80-051-0-29-386 DEPARTMENT BUILDINGS
Supply, Installation & commissioning of Hydraulic Press Vertical C- Frame of 100 Ton capacity
Providing manpower service to KFD DCF Forest Mobile Squad Sirsi uttara kannada 2026-27
Manufacture and Supply of 1.1 kV Polymeric Pin Insulator LT
Supply, Installation, Testing and Commissioning of Muffle Furnace with N2 Gas Supply and Accessories under Pradhan Mantri Uchchatar Shiksha Abhiyan PM-UShA Scheme at Karnatak University, Dharwad
Supply, Installation, Testing and Commissioning of Particle Size Analyzer with Zeta Potential and Accessories under Pradhan Mantri Uchchatar Shiksha Abhiyan PM-UShA Scheme at Karnatak University, Dharwad
Supply, Installation, Testing and Commissioning of Laboratory Equipments and Accessories for the Department of Forensic Science and Criminology under Pradhan Mantri Uchchatar Shiksha Abhiyan PM-UShA Scheme at Karnatak University Dharwad
Supply, Installation, Testing and Commissioning of an Impedance Analyzer with Accessories under the Pradhan Mantri Uchchatar Shiksha Abhiyan PM-USHA Scheme at Karnatak University, Dharwad
Supply, Installation, Testing and Commissioning of Laboratory Equipments and Accessories for the Departments of Life Sciences under Pradhan Mantri Uchchatar Shiksha Abhiyan PM-UShA Scheme at Karnatak University Dharwad
Advance work for Raising of ANR Model-II Plantation (2027 rains) including raising PB seedlings) in Salkod F Sy No 396 P-II, 20Ha. of Honavar Range during 2026-27.
Advance work for Raising of ANR Model-II Plantation (2027 rains) including raising PB seedlings) in Salkod F Sy No 396 P-I, 20Ha. of Honavar Range during 2026-27.