Loading…
Loading…
144 results • Latest
Balance Works for Existing Stretch between Legship and Gyalshing of NH510 Design Chainage Km 58.840 to Km 75.000 Pkg V and Legship to Gyalshing of NH-510 Design Chainage from Km 75.000 to Km 90.210 Pkg VI.
(STMC) on NH-717B for the section from Km 20.340 (Rongli Bazaar) to km 26.588 (Rongli Bypass End) and upgradation of existing road at Km 20.600 Km 26.400 for length of 0.520 km 0.554 Km of Rhenock- Menla spur under jurisdiction of PMU-Rhenock
Comprehensive mailtenance of 02 Nos. 13 Passangers (884 Kg) Lift System (Make-OTIS) for serving (G Plus 2) floor at Regional Museum for Natural History, Marchak, Gangtok, Sikkim. Subwork/Packages: Comprehensive Maintenance of 02 Nos. 13 Passanger (884 Kg) Lift System
TERM CONTRACTS FOR ARTIFICERS WORK UNDER AGE B/R-I OF GE GANGTOK
Chili (??? ?????) (Q4), Turmeric (Haldi) (?????) (Q3), Spices And Condiments - Coriander, Whole And Ground (V2) Conforming to IS 2443 (Q3), Cumin (????) (Q4), Black Pepper (???? ?????) (Q4), Cloves (????) (Q3), Large Cardamom (Badi Elaichi) as per IS 13446 (Q4), Mustard (Rai, Sarson) (???, ?????) (Q4), Dried Laurel or Dried Bay Leaf (??? ?????) (Q3), Asafoetida (Hing) (????) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Domestic Vegetable Knives-IS:3546, Tea Set (V2), Spoon (V2) Conforming to IS 16286, Smart LED TV 43 Inch, Inverter with Bty, Automatic Washing Machine (9 Kg), Steel Almirah, Bed Sheet Double Bed, Hearing Aid, CentreTable, Curtains, Plastic Stool, RO 50 LPH, Calling Bell, Rice Cooker (20 Ltr), Electric Kettle (1.5 Ltr), Foot Mat, Refrigerator, Beep, Towel Large, Umbrella, Dinner Plate, Tray, Bowl, Dining Table with Chair, Night Dress Girls, Night Dress Boys
Electrical works at 5 nos Inspection Quarter at Rajbhawan SO and Gangtok HO and WTC at Gangtok HO, Sikkim Region