Loading…
Loading…
2,536 results • Best match
Provision of Air Conditioners, Water Heater, Insect Killer, Oil Heater, Room Heater, RO Water Purifier, Refrigerator, Decorative Poles with lights concealed lights and LED Flood Light etc. have been taken in this estimate
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repair of Air Conditioner Split Type 2 Ton; Air conditoner; Service Provider, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Repari of ... of Window AC 1 ... Ton; Window AC ; ... - Air Conditioner spilt ...
AC and RO plant
Providing and fixing of Window AC 1.5 ton of 3 star rating complete in all respect in HSVP Division No.3, Sector12, Faridabad and all other works contingent thereto
AMC of various electrical appliance installed under Electrical Sub Division PWD BandR Br., Narnaul for the year 2026-2027 (AMC of the Air Conditioners and Water Cooler installed at various site under ESD Narnaul)
Mtc. of various electrical appliances installed under Electrical Sub Division PWD BandR Br., Nuh for the year 2026-2027 (AMC of various Air Conditioners installed under ESD PWD BandR Br. Nuh in Distt. Nuh)
SERVICING OF AC, GAS REFIL IN AC, REPAIR OF PCB BOQ Title BOQ BOQ
Custom Bid for Services - Tender for Services, repairing and overhauling of 90 TON Capacity AC Chiller Plant Similar Category Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System)
Misc. Civil Work and Electrical work AC Installation in Geo Lab Near Mann Hospital M.C Rohtak
Executive revolving chair, Paper Shredder, Revolving chair for work station, Inverter with double battery 12 Volt, Split AC 1.5 Ton, Glass Appt Board, Desert Cooler BOQ Title BOQ BOQ
Estimate for SITC of VRV Air conditioning in classroom of 2nd and 3rd Floor (prefab room) of Computer Science and Engineering Department in the J.C. Bose University of Science and Technology YMCA Faridabad.
Construction of Iron Prefab Structure Office Space (Q3), Tile Work with Material (Q3), Bison Board Interior Work For Office Shelter Walls (Q3), Electrical work with material for office space (Q3), False Down Ceiling (Q3), Commercial Cassette Air Conditioner ... Cassette Air Conditioner 3 ...
Tower Type AC of capacity 2 ton, 3 Star rating, floor standing, Split Type AC of capacity 1.5 Ton, 3 star rating, SS Stand for inner unit suitable for 2 Ton tower AC, MS Stand for outdoor unit suitable for 1.5 Ton AC, Installation charge for 2 Ton ... Ton tower AC , ... AC, Installation charge ... Ton tower AC , ...
Wall Paper, Air Conditioner 1.5 Ton, Electronic Voltage Stabilizer, LED TV 106cm, Audio Speaker, Refrigerator 253 ltrs, Water Purifier 10 Ltrs, Chair Plastic Cushion, Sofa, Side Table, Magazine Stand
Supply and replacement of non repairable air conditioner in the office of Sub Divisional Engineer HSVP Electrical Sub Division Faridabad. Including 1 year defect liability period free of cost.
Annual Maintenance for electrical installation (E.I), 2 Nos. 250 KVA D.G. sets, ACB and VCB, Central Air Conditioning System and transformer in HSVP Conventional Centre cum Exhibition Hall in city Centre Sector-12 Faridabad.
Annual Maintenance for electrical installation (E.I), 2 Nos. 250 KVA D.G. sets, ACB and VCB, Central Air Conditioning System and transformer in HSVP Conventional Centre cum Exhibition Hall in city Centre Sector-12 Faridabad.
Annual Maintenance for electrical installation (E.I), 2 Nos. 250 KVA D.G. sets, ACB and VCB, Central Air Conditioning System and transformer in HSVP Conventional Centre cum Exhibition Hall in city Centre Sector-12 Faridabad.
Customized AMC/CMC for Pre-owned Products - UPS; Vertiv; Comprehensive Maintenance Contract (CMC); Quaterly; No, Customized AMC/CMC for Pre-owned Products - Split AC; Vertiv; Comprehensive Maintenance Contract (CMC); Quaterly; No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Supply of 11 KV, 800 Amps HT vacuum circuit breaker Bus Coupler, indoor panel conforming to IEC 62271, 200, 25 KA for 3 sec, all as mentioned in specification and as directed, Installation, Testing and commissioning of 11 KV, 800 Amps, HT vacuum circuit breaker, Bus Coupler indoor panel, Supply of HT bus trunking chamber adopter panel of capacity 12 KV 800 Amp or nearest higher rating bus bar totally sheet metal enclosed matching with HT panel including busbar, Installation, testing and commissioning of HT bus trunking chamber adopter panel of capacity 12 KV 800 Amp, Shifting of existing 8 Nos VCB for installing of Bus coupler between existing VCB and connect the Bus coupler complete
Revamp and Upgradation of air Conditioning system of Training Centre, HR reception, Pipeline Research Lab, PKM Block (North) and PMMA shed along with allied civil and electrical works at IOCL. R and D Centre Faridabad
Repair and servicing of Air Conditioner including parts of reputed make, ISI mark i.e Voltas, LG, Whirlpool, Hitachi etc. and labour installed in various kiosks at 220kV S-Stn. HVPNL, Chormar
Automatic Washing Machine, LG QLED TV 55, 4K UHD TV 43, 25ltr water gyser electric, Split AC 1.5 ton 5star, Kent RO, Microwave Owen, Inverter Set, Desktop Computer, Intercom facility of beetel
PROVISION OF PARKING SHED AT CATERING SECTION DEFICIENT UTENSIL RACKS IN SMQs AIR CONDITIONERS FOR OLD UNIT COMPLEX TWO SUN SHELTERS HARDSTANDING AT SMALL ARMS RANGE AND CHAIN LINK FENCING AT STN LGS SECTION AND FIRE SECTION AT AF STN SIRSA
Custom Bid for Services - Comprehensive Annual Maintenance Contract of STULZ Make HVAC Systems at NRPL Agra for a Period of Three Years Similar Category Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System)
Pdg. street light, solar light and AC only
Construction of EVM/VVPATs warehouse in the campus of Mini Sectt. at Narnaul (Pdg. Fire Alarm system, water cooler with RO CCTV System and Air Conditioner) (Rs. 15.45 Lac) (Pdg. CCTV Cameras only)
Repair and Overhauling Service - REPAIR OF FIRE ALARM; REPAIR OF FIRE ALARM; Yes; Buyer Premises, Repair and Overhauling Service - REPAIR OF RO WATER PURIFIER; REPAIR OF RO WATER PURIFIER; Yes; Buyer Premises, Repair and Overhauling Service - REPAIR ... OF SPLIT AC 2 ... OF SPLIT AC 2 ...
ELECTRIC WORKS, WHITE WASH, WATER DISPENSER, SPLIT AC 1 POINT 5 TON, ELECTRIC BOARD 2 POINT 5 X 3, ALUMINIUM DOOR, LCD SAMSUNG 52 INCH, ALUMINIUM WINDOW, MASSAGE CHAIR, WALL PANELING, SIDE WALL CONSTR WORK
Construction of EVM/VVPATs warehouse in the campus of Mini Sectt. at Narnaul (Pdg. Fire Alarm system, water cooler with RO CCTV System and Air Conditioner) (Rs. 15.45 Lac) (Pdg. Fire Alarm System only)
Annual maintenance of duct-able air conditioning system in HSVP Office building sector-3, Rohtak for operation maintenance for the year 2022-23 from 1-9-2022 to 30-11-22 and 15-2-23 to 31-8-23.
Annual maintenance of Central Air Conditioning system in GMDA building and repairing replacement of equipments AHU FCU FCU Controller by Providing of 04 Nos. manpower of AC Operator AHU FCU FCU Controller Upto the complete satisfaction of Engineer in
Annual Running Contract for Operation Maintenance of AC Plants, Evaporating Cooling Plant, Ventilation system, Window / Split AC, Exhaust Fans and Desert Coolers installed at 2x300 MW DCRTPP, Yamuna Nagar plant and Residential Colony for the year
Pdg and Fixing of 11 KV Line 200 KVA Sub Station for Electric connection, Campus Illumination, 36 Watt LED Light and Fan Fixtures, Surveillance System, Fire Alarm System Air Conditioning System DG Set and Lift in Gymkhana Building, Sector-14 Bhiwani
Special Repair of Poly Clinic Building in Sector 6 Jhajjar Providing Fixing of aluminium Door Termite Treatment on Walls PVC Wall panels Installation of Air Conditioner complete in all respect and all other works Contingent thereto
sinchai bhawan was constructed approx 20years ago and at that time Air conditioning system was installed in Block B. Cooling tower also installed at that time which controls the whole cooling system of Block B.Due t passage of time cooling tower beco
AC BLUE STAR ONE AND HALF TON, AC LLOYD 1 TON, STABILIZER FOR AC, INSTALLATION CHARGES OF AC, NAME PLATE DIGITAL FOR ALL OFFICES
IRON BOX, SPLIT AC 1 TON VOLTAS, STEBLIZER, FLEX BOARD 4X6 WITH FRAME, FLEX BOARD 8X4, SAMIYANA COMPLETE WITH IRON POLE AND CLOTH, ACP SHEET BOARD WITH VINAY LAMINATED PRINTING 6X4, ROPE JUTE, COTH SAND AND MAROON BOQ Title BOQ 2
Job No.1286/2026 (HEW) Providing and installation of LLYOD 1.5 Ton 5 Star Window Air Conditioner with 4KVA digital stabilizer including loading, unloading and carriage complete in satisfaction on Engineer-in-Charge in O/0 executive Engineer (Hort
inch, Copper pipe 4 inch, Copper pipe 8 inch, Copper pipe 5 8 inch, Thermostat coil window or Split, PCB for window AC 1 point 5 Ton, PCB for window AC 2 Ton, PCB for split AC 1 point 5 Ton, PCB for split AC 20 Ton, PCB for Invertor split AC 1 point ... Invertor split AC 2 ... type split AC 240 ... type split AC 240 ... for window AC 1 ... for split AC 1 ... for split AC 1 ... for split AC 2 ...
Providing and fixing of Air conditioner, 4 KVA stabilizer, Ceiling fans, Exhaust fan and underground Cable 25sqmm x 4 Core and all other allied items in HSVP Office Building Sector-12 Faridabad. (Including 1 (One) year defect liability period free of
Custom Bid for Services - Annual Maintenance Contract for Rice Lake make Weighbridges at PTA Terminal, PPMC, Panipat Similar Category Annual Maintenance Contract for Network Security Devices ANNUAL MAINTENANCE SERVICE - AUDIO CONFERENCING SYSTEM ... Precision Air Conditioners
WATER TANK 300 LTR, WINDOW AC 1 TON, WHITE BOARD 4 X 3 FT, SOFT BOARD 8 X 6 FT, EXHAUST FAN, WALL FAN, AC STABLIZER 4 KVA, WATER RESISTAND CLOTH FOR SHELTER, CURTAINS BLINDS 3 X 2 FT, FLOORING 15 X 8 FT
Work for supply and installation of 04 Nos. battery, 01 No. Air Conditioner and purchase of 01 No. office table, almirah in O,o E.E. H HSVP Sector-1 and purchase of indoor pot plants for various Govt. functions at UE Rohtak
Rotary Rack Oven 40 Tray with Trolley, Addl 40 Tray Extra, Three Deck Oven 6 Tray, Proofer 32 Tray, Double Door, Display Rack, Stainless Steel Racks for Product Layout, Movable Stainless Steel Rack with Caster Wheels, Air Conditioner 2 Ton Hot and Cold with Installation
Ductable AC 8.5 TR, Refrigerant piping as above for 8.5 TR Machine, Drain Piping 25 MM Dia, Supply and Fabrication of MS Structure to Support the Machine, Outdoor and Ducting, Control Cable, Power Cable 4C X 6 SqMM, Power Cable 4C X 50 SqMM, MS Cable ... Portable Air Conditioner Capacity ...
Machine, PLFD 65, PLFD 55, PLFD 43, Water geyser, Split AC 1.5, Refreigerator, Microwave oven, Battery and Inverter Set, Desktop, Intercom, Air Cooler, RO UF TDS Control UV LED, Audio Speaker for conference room, CCTV- IP Camera 4MP 4TB, Big room heater, Drinking water cooler with RO 150 ltr.
Wooden Almirah, Single Bed Mattress, Hot and Cold Air Conditioner with stabilizer and installation, Study Table, Curtain, Cushion Chair, Pillow and Bedsheet, Wall Clock, Emergency Light, television, Chain Link Fence, Fiber Sheet, Iron Patti and Angle, Parking Shed with Plinth, Water Dispenser, Coffee Machine, Refrigerator, Interlocking Tiles, Drainage System
Custom Bid for Services - Non Comprehensive Annual Maintenance Contract for DAIKIN Make 300 TR Capacity Air- Cooled & Water Cooled chillers, installed at NHPC Limited, Office Complex, Sector-33, Faridabad for a period of two year as per scope of work ... And Air Conditioning System)
Operation Maintenance and repair of pumping machinery repair of all civil structures repair of AC PVC DI pipeline in rising main and distribution system, repair of sluice valve, repair of FHTC including all other works contingent thereto Recall