Loading…
Loading…
1,713 live1,164 closing this weekmost from Zilla Parishad and Rural Development and Panchayat Raj Department
1,713 results • Best match
Repair and Rewinding of Skope make Sub. P/Sets for various tubewells in Tughlakabad Village, Harkesh Nagar and Okhla Phase-II under Tughlakabad Constituency AC-52.
Providing of Mechanical Lifting Arrangement for day to day maintenance of Various Tubewells in Ward No- 188 and 189 in Okhla Constituency AC-54. .(Re-invite)
Custom Bid for Services - OUTSOURCING OF SUPPORT SERVICES FOR RESIDENT GEOLOGIST, SURVEYOR AND RESIDENT PHYSICIST IN CARRYING OUT GEOLOGICAL SURVEY BOREHOLE LOGGING AND SAMPLING WORK AT RG OFFICE CAMP KHANDELA ROHIL PROSPECT SIKAR DISTRICT RAJASTHAN Similar Category Manpower Outsourcing Services - Minimum wage
Custom Bid for Services - OUTSOURCING OF SUPPORT SERVICES FOR HELPING RESIDENT GEOLOGIST, SURVEYOR AND RESIDENT PHYSICIST IN CARRYING OUT GEOLOGICAL SURVEY BOREHOLE LOGGING AND SAMPLING WORK AT RG OFFICE CAMP HURRA KI DHANI JHUNJHUNU DISTRICT RAJASTH.. Similar Category Manpower Outsourcing Services - Minimum wage
handpump maintance me karaye jane wale karya ka naam jaise compressor lagana platform banana giri fisi line nikalna padistal lagana gravil dalna ward 01 to 47
Drilling of new Borewell ,Motor and pipe line work Near Karuppanasami Kovil Sangampalayam H/O Rajampatty THOPPAMPATTY BLOCK
Providing New Borewell and Erection of Pumpset and Pipe line to 100000 OHT at Thethampatti, H/O Paralipudur
SARVAJANIK TUBEWELL KA NIRMAN AVAM Commissioning KARYA NAKHAT BANNA MANDIR RASISAR PUROHITAN BAS
Sinking of tube well (200 mm X 150 mm) upto required 90 m depth with installation of nos. vertical wet type submersible pump with necessary fittings at Naranda Maity para at Ward No-05 and resinking of submersible pump near Kesiyaribhuniabar Prym
Sinking of 3 nos 100mm dia. X 50mm.dia. 100m deep sustainable Indian Mark - II tube well at Mouza- Shripur, Village- Shripur, GP- Shripur-I, Block- Ratua-II, at Mouza- Bahirkap, Village- Bahirkap, GP- Debipur, Block- Ratua-I and at Mouza- Damaipur, V
Replacement of 200 mm dia. all through Tube Well at Head Work site (110 M Deep) by D.R. Rig. Method using P.V.C. Pipe filter including supply of materials of KADIRPURPiped Water Supply Scheme at Habibpur Dev. Block under Malda Division, PHE Dte. G
Laying of Rising main in between Tube Well -2 (at OHR site) and Distribution Line and FHTC AND PIPE LINE AT JENARAR PARA under BHATAR Z-I PWSS in BHATAR Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. (SM/08033)
Replacement of 200 mm dia. all through Tube Well at Head Work site (120 M Deep) by D.R. Rig. Method using P.V.C. Pipe filter including supply of materials of Rajarampur Piped Water Supply Scheme at Habibpur Dev. Block under Malda Division, PHE Dt
MR to Basudebpur Section office and Sinking of 200mm X 100mm dia Deep tube well including supply and installation of pump sets and necessary connection with water distribution line with necessary Electrification of KCSD No IX of K C Division No III
Re-boring of 3 nos. of tubewells in Malai mandir camp, Sonia Gandhi camp and Sector 07 R.K.Puram in R.K.Puram constituency(AC-44) under EE(C )28
Providing New Borewell and Erection of 7.50 HP Pumpset and Pipe line to OHT at Indiracolony, H/O Kottaiyur
Modification of Tubewell Pipe Lines inside Sonia Vihar WTP to Facilitate Fire-Fighting Requirements
Sinking of tube well (200 mm X 150 mm) upto required 90 m depth with installation of nos. vertical wet type submersible pump with necessary fittings at Garpurusottampur near Kaderiya Masjid at Ward No-14 and laying of pipe line at Uttar malik par
Sinking of tube well (200 mm X 150 mm) upto required 90 m depth with installation of nos. vertical wet type submersible pump with necessary fittings at Hut para behind Police Station at Ward No-04 and resinking of submersible pump at Pal Para wa
Annual Mtc of Water Supply Schemes Radaur Town for the year 2026 2027. For One Year Repair of Pumping Machinery of Existing Tubewells and all other works contingent thereto.
TN 04 - 01 /2026-27 Extension of Pipeline from Boothanatham Anchaneyar Kovil near Existing Borewell to OHT H/O Boothanatham)
Drilling of Borewell and Providing Submersible pump set with all accessories and pipe line to Perusomala village of Sanjamala Mandal
Drilling of Borewell and Providing Submersible pump set with all accessories and pipe line to Sanjamala village of Sanjamala Mandal
Drilling of Borewell and Providing Submersible pump set with all accessories and pipe line in Ramireddipalli village of Sanjamala Mandal
Badarpur Estimate For Prov. and installing 1 no. additional Tubewell in village Badarpur, Distt Kurukshetra
PURCHASE OF MATERIALS FOR REPAIRING OF TUBEWELL AT DIFFERENT SANSAD UNDER MOGRA I GRAM PANCHAYAT
PABU PATHSALA KE PASS TUBEWELL KA NIRMAN AVAM COMMISNING KA KARYA GP SWARUPSAR PS PANCHOO
Ban Estimate For Prov. and installing 1 no. additional Tubewell in village Ban , Distt Kurukshetra
Development works including construction of Asphalt Roads (18m, 12m, 9m & 7.5 m wide), RCC Drains, Culverts, Sinking of Borewell with pump installation and HDPE rising main, construction of 10 LL OHT & 5 LL Sump with Pump House, Layout Electricficaton, Compound wall, and Footpath for Dr. Qamar-ul-Islam Residential Project ( 50-50 sharing porject ) at Hagaraga Village in Kalaburagi Taluku & District.
Sinking of tube well (200 mm X 150 mm) upto required 90 m depth with installation of nos. vertical wet type submersible pump with necessary fittings and laying of pipe line at Chaulya para near Sudip Chaulya house at Ward No-18 and repearing of s
Sinking of tube well (200 mm X 150 mm) upto required 90 m depth with installation of nos. vertical wet type submersible pump with necessary fittings at Gajantala at Ward No-10 and laying of pipe line at Palpara and Gumai School mat para Ward No-1
Sinking of 250 x 200 mm. dia. 150 m. deep Tube Well by D.R. Rig method using UPVC pipe (CD) and UPVC deep Well Screen (RDS) under Central Circle, PHE. DTE. (1 No.) at Bolgona Railway Par (Replacement TW-III) and Pump House at beside mirickpara ICDS
Construction of 30,000 litres Capacity RCC OHT (12m Staging) with Borewell near Perumalpuram Govt. High school at Moongilpatti, H/O Chellappanciakenpatti
Providing New Borewell and Erection of Pumpset and Pipe line to OHT near Vemparali Bus stop at Vemparali, H/O Paralipudur
Providing New Borewell and Erection of 7.50 HP Pumpset and Pipe line to 10000 lit OHT at Valasai, H/O Avichipatti
Providing New Borewell and Erection of Pumpset and Pipe line to 100000 OHT near Middle school at Thethampatti, H/O Paralipudur
Development of Indira Play Park with Toilets and Borewell with motor at Phase-IV, Vanasthalipuram, GHMC, Ranga Reddy District. (Under MPLADS)
Providing and installing 1 No. new tubewell in place of abandoned T/well at Ghail Kalah
Providing 150mm dia borewell and Errection Submersible Pump at Additional block nursery kalakudi Habitation at Koodur Panchayat in Thiruvarur Block and District
Khori Kalan -Prov. and Inst. of 2 No. Tubewells by DTH and laying of D.I. Connecting Pipeline and FHTC against CM Window Complaint no.CMOFF/N/2025/134494 and CMOFF/N/2026/031377
CONSTRUCTION OF PROPOSED SEWERAGE TREATMENT PLANT , LAYING OF SEWER LINES and CONSTRUCTION OF MAIN HOLE Drilling of Tubewells , Construction of Boosting Station , Laying of Rising Main , Internal Distribution System and Independent Feeder
Drilling of borewell and installation of motor pump and pipeline work in the area identified by Geologist in Uchchangi Ellamma Temple Ward No. 4, in front of the Jamia Masjid Ward No. 4, and in front of the Keteshwara Matha Ward No. 12 and the work of installing valves for a new pipeline in front of Basappa Hospital Ward No. 29 in chitradurga city.
Drilling new borewell at Mill Kulam , Supply and erection of Submersible pumpset with accessoreis and EPL H/O Odaippatty in Oddanchatram Panchayat union
Drilling tubewell at Payarka, Makhana & SIT & C of Pump-sets along with all Electro-mechanical Accessories at Kanpar SHW And PSLL & J 90mm Dia 6kg/cm2 PVC Pipeline For Makhana and Payarka, Providing and Supplying of Pump Cabin at, Makhana, Payarka and Vyara And Electrification at different location for Bhuj part-2 RWSS under M & R Programme 2026-27
Design, Construction and Commissioning of PEB Sheds, Structures, Buildings, Water supply arrangement, Drainage, Sewerage, Fire Fighting works, Road works, Track works, Traversers, Shower testing arrangements, Static and OH water tanks, tubewells, Parking facilities, boundary wall/fencing, EOT cranes, Supply Installation and commissioning of Machinery and Plant, Electric substations, and Power supply arrangements, General Electrical works, associated telecom & IT works etc. i.e. including all Civil, Electrical, Mechanical, IT & Telecom works in connection with construction of new Workshop at Rail Coach Factory (RCF), Kapurthala, Punjab (India) on EPC mode.
Rough Cost Estimate for Requirement of 1 No. Tubewell in MCH Building in Sector -6 Panchkula, Deposit Work
Sinking of 1 no. 250 X 150 mm dia and 240 mtr. Replacement deep tube well drilling by direct rotary method with 150 mm. dia. PVC. strainer of 30 m. length having 250 mm dia. 60 m. long PVC housing pipe 150 mm dia. 150 m. long well pipe along HWH Div
Dhandardu Village, Estimate for Providing and Installing 1 no. New Tubewell in Village Dhandardu of Block Barwala District Panchkula.
Balayacha Drilling of 01 No Tubewell and installation of 01 No Pumping Machinery in village Balayacha by DTH Rig