Loading…
Loading…
3,124 results • Best match
Repairing of Hand Pump Under Jugsalai Nagar Parishad,Jugsalai, Jamshedpur.
Provision of 125 x 100 mm dia bore well at P N T Colony, Lalpur Ranchi.
Flushing of two nos. bore well and providing submersible pump 2HP under Ashok OCP, Piparwar Area.
Repairing of 10 HP. 01 No. Bore Well Summersible Pump Set Only of Central Magazine Center
Drilling and providing 4 inch/5 inch dia. 14 nos handpump with tubewell at complete at various places of urjanagar colony,under Rajmahal area.
Construction of 125/115 mm dia with 70 mtrs deep drilled tube well with installation of IM-II Hand pump on turnkey basic in different Block in Palamau district for the year 2023-24 under D.W. and S. Division, Medininagar. (Group No-MED/DT/70mtr.-04)
Construction of 125/115 mm dia with 70 mtrs deep drilled tube well with installation of IM-II Hand pump on turnkey basic in different Block in Palamau district for the year 2023-24 under D.W. and S. Division, Medininagar. (Group No-MED/DT/70mtr.-03
Construction for 125/115 mm dia drilled Tube Well for drilling in all kinds of soil rock for installation of hand pump at different Block under D. W. and S. Division Ranchi West, Ranchi for the Year 2020-21 (Group D/T RW-03) 50 Nos
Construction of 125/115 mm dia with 70 mtrs deep drilled tube well with installation of IM-II Hand pump on turnkey basic in different Block in Palamau district for the year 2023-24 under D.W. and S. Division, Medininagar. (Group No-MED/DT/70mtr.-02)
Construction of 125/115 mm dia with 70 mtrs deep drilled tube well with installation of IM-II Hand pump on turnkey basic in different Block in Palamau district for the year 2023-24 under D.W. and S. Division, Medininagar. (Group No-MED/DT/70mtr.-01
Group no LTR DT 01 Construction of Tube Well of 125 x 115 mm dia 60 Mtrs deep with installation of IM II Hand Pump all complet in the District of Latehar under DW and S Division Latehar for the year 2020 21 For 100 nos DT
Relocation of 125/115 mm. Dia. with. 90 mtrs. different average deep drilled tube well with IM-II Hand Pump and 32 mm dia. medium class riser pipe by DTH Rig Machine with 125 mm. dia. Blue UPVC casing pipe, construction of platform and drain etc
Relocation of 125/115 mm. Dia. with. 120 mtrs. different average deep drilled tube well with IM-II Hand Pump and 32 mm dia medium class riser pipe by DTH FDK/KPO/COPCO Rig Machine with 125 mm. dia.UPVC casing pipe, constn of platform and drain etc
Group no LTR DT 04 Construction of Tube Well of 125 x 115 mm dia 60 Mtrs deep with installation of IM II Hand Pump all complet in the District of Latehar under DW and S Division Latehar for the year 2020 21 For 100 nos DT
Group no LTR DT 02 Construction of Tube Well of 125 x 115 mm dia 60 Mtrs deep with installation of IM II Hand Pump all complet in the District of Latehar under DW and S Division Latehar for the year 2020 21 For 100 nos DT
Group no LTR DT 03 Construction of Tube Well of 125 x 115 mm dia 60 Mtrs deep with installation of IM II Hand Pump all complet in the District of Latehar under DW and S Division Latehar for the year 2020 21 For 100 nos DT
Drilling of 2 Nos. Borehole for Colony water supply under Kusunda Area.
Construction of sampling room, other rooms and service buildings including Bore wells at New Kuju Siding under Topa R-OCP of Kuju Area.
Repairing of Tube Wells in Jamshedpur East and West Constituency under Jamshedpur Notified Area Committee Jamshedpur East Singhbhum Jharkhand
ANNUAL REPAIR AND MAINTENANCE OF DEPARTMENTAL 684 Nos DRILLED TUBE WELLS IN DIFFERENT WARDS UNDER CHAS MUNICIPAL CORPORATION CHAS
Installation of a hand pump near the house of Rakesh Prasad at Sahubahiyar under Madaidih Panchayat (2) Installation of a hand pump in front of Suryaahi Akhara at Amtaand Budha Bandh under Ramakunda Panchayat (3) Installation of a hand pump near the
Construction of 7 Nos, Deep Tubewell of 125/115mm Dia,90mtrs deep Drilled Tube Well for Different Anganwadi center under D. W. and S Division Saraikela for the year 2023-24. Group-1
Construction of one no. bore hole with installation of submersible pump motor set with allied misc. works at Dispensary under GM Unit, Sirka
Complete rewinding and repairing of 225KW, 550V, 3 phase Crompton Greaves make Sl. No. NABZB3-328 Motor Madhuban Bore hole of ABOCP Mine
Casting Machining and Fitting of C.I. housing of Pullen Make Pump 170 H.P. at Bore Hole Huchuktand of Jeenagora Colliery under Lodna Area.
Installation of 04 nos. hand pumps at Jaridih west panchayat under CSR Scheme ( 2019-20) of BnK Area
Repairing and maintenance of hand pumps at different locations of area related units and Damoda under Barora Area
Repairing and maintenance of hand pumps at Hospital Colony, Nehru Chowk Colony and Area Unit under Barora Area
Installation of a solar-powered water tower at the existing borehole in Bagdaha Dhadhkitand (2) Installation of a solar-powered water tower at the existing borehole in Karitand, Daludih Panchayat
HANDPUMP AND VECHICLE ACCESSORIES
Drilling and commissioning of bore well all complete at Hijukita rehab site (Master Grp.) under Rajmahal Area.
Drilling and commissioning of 01 nos bore well all complete fitting at Taljhari village under Rajmahal Area.
Repairing of 7.5HP 01 No Bore Well Submersible Motor Pump and Accessories at Murli Nagar Town Ship.
Drilling and Commissioning of 02 nos. bore well all complete fitting with pipeline at Dakaita rehab site.
Drilling and Commissioning of 02 nos. bore well all complete fitting with pipeline at Dakaita rehab site.
Construction of 125 115 mm dia with 60 meters deep drilled tube well
RELOCATION OF 125/115 MM DIA DEEP DRILLED TUBE WELL IN EGYARKUND BLOCK
RELOCATION OF 125/115 MM DIA DEEP DRILLED TUBE WELL IN NIRSA BLOCK
Construction of 125 115 mm dia with 60 meters deep drilled tube well
Repairing and maintenance of 150 Nos. Hand pump at Urjanagar colony.
Repair of hand pump of near by village near Rajmahal Area.
Relocation of 19 nos defunct DT Well by construction of TubeWell of 125 x 115 mm dia 60.00 Mtrs deep drilled tube well under DWSD Chaibasa for the year 2024-25 (CBSA/SR-01)
Installation of a solar-based water tower at (1) the old hand pump outside Loko Bazaar Shiva Temple under Khesmi Panchayat (2) Installation of a hand pump near the house of Mohan Das under Khesmi Panchayat (3) Installation of a hand pump beside the
Repair and maintenance of 3.3 KV Overhead Line for separate dedicated power supply from CRO Substation to Borehole 43 and tapping point to Borehole 24 under Churi UG Project, NK Area
Drilling, development n providing, welding and fixing casing pipe for 4nos. deep bore/tube well near TP-10.
Drilling of 10 nos. bore hole in mine area sainik patch quarry no. II to ascertain the soil strata under Ashok Project Piparwar Area.
Drilling of bore hole 3 numbers of 8 inch dia upto 180 metres depth with submersible pump set at Tetulmari township at Sijua area
Repairing of 150mm dia pipe line from Jogidih Kali Mandir(Bore Hole) to Chitahi Basti ( near Chitahi Dham) in Jogidih Colliery under Govindpur Area
Revival of defunct IM-II Tube Wells by changing of 32mm dia Rotten Riser Pipe ETC. GROUP NO. RRP-03
Revival of defunct IM-II Tube Wells by changing of 32mm dia Rotten Riser Pipe ETC. GROUP NO. RRP-01