Loading…
Loading…
3,123 results • Best match
For 8 inch dia Bore Hole and fitting lowering Submersible Pump Set with Pipe and Cable and Final Commissioning for water supply at CISF Barrack Central Magazine Sijua Area.
Relocation of defunct Tube Well of 125 / 115 mm dia 60 Mtrs deep drilled tube well with installation of IM II Hand Pump IS 15500/ part II 2004 with 32mm dia medium class GI Riser pipe by DTH FDS/ K PO / COPCO Rig machine with 125 mm dia blue U
Installation of new submersible pump-motor including bore-hole in CISF camp Badjana Colliery
Lowering and Installation of Submersible pump of Bore Hole Near Goshala Under Bastacolla Colliery.
Hand Pump Spare Parts
Construction of water supply Scheme with 2.0 HP AC Submersible motor pump complete set for 200mm x 165 mm x 300 meter deep bore well (HYDT) at HEALTH CENTRE DUMARIA situated in old building of Dumaria block under D.W and S Division,Jamshedpur 2023-24
Lay. and fit. of new GI Pipe 150 mm dia delivery pipeline range from 63L borehole to 65L/15WD through 60L/15DW and disman. of already existing del. range from 65L/15DW to 63L bore hole, and continuous dewatering of mines water under Churi Colliery
Supplying of light goods carrier motor vehicle like Mahindra pick up van of equivalent with all applicable POL including driver one no tube well mistry and two nos of labour for ordinary repairing of hand pumps in different blocks Group 03
Supplying of light goods carrier motor vehicle like Mahindra pick up van of equivalent with all applicable POL including driver, one no. tube well mistry, and two nos. of labour for ordinary repairing of hand pumps in different blocks Group 02
Supplying of light goods carrier motor vehicle like Mahindra pick up van of equivalent with all applicable POL including driver, one no. tube well mistry and two nos. of labour for ordinary repairing of hand pumps in different blocks Group 01
Repairing and maintenance of the 04no n 05no Bore hole at 32L under Ray UG mine under Ray Bachra Project Piparwar Area
Providing and laying PVC pipe in bore hole at Coal dump colony under Katras Area
PROPOSAL FOR SVA TOILET WATER SUPPLY SYSTEM- DIGGING OF BOREWELL ANDINSTALLATION OF HAND PUMPS
Construction of Drilled Tube Wells of 125 mm X115 mm dia X 60.00 Mtr. avg. depth with installation of India Mark II Hand Pump in different places of District Hazaribagh under D. W. and S. Division Hazaribagh Head Untied Fund
Construction of Drilled Tube Wells of 125 mm X115 mm dia X 60.00 Mtr. avg. depth with installation of India Mark II Hand Pump in different places of District Hazaribagh under D. W. and S. Division Hazaribagh Head DMFT Fund
Lowering and commissioning of 04 submersible pump in existing bore well with 01 no. new borewell with pump house at different places of Hatia rehab site under Rajmahal Area..
DEEP DRILLED TUBE WELL OF 125/115 MM DIA, 60 MTRS WITH INSTALLATION OF INDIA MARK II HAND PUMP FOR THE YEAR-2023-24 UNDER D.W. AND S. DIVISION NO.-1, DUMKA GROUP-SRDT-1
DEEP DRILLED TUBE WELL OF 125/115 MM DIA, 60 MTRS WITH INSTALLATION OF INDIA MARK II HAND PUMP FOR THE YEAR-2023-24 UNDER D.W. AND S. DIVISION NO.-1, DUMKA GROUP-SRDT-1
DEEP DRILLED TUBE WELL OF 125/115 MM DIA, 60 MTRS WITH INSTALLATION OF INDIA MARK II HAND PUMP FOR THE YEAR-2023-24 UNDER D.W. AND S. DIVISION NO.-1, DUMKA GROUP-SRDT-2
DEEP DRILLED TUBE WELL OF 125/115 MM DIA, 60 MTRS WITH INSTALLATION OF INDIA MARK II HAND PUMP FOR THE YEAR-2023-24 UNDER D.W. AND S. DIVISION NO.-1, DUMKA GROUP-SRDT-2
HAND PUMP WITH INBUILT NRV & STRAINER, HAND PUMP WITH INBUILT NRV WITH PRESSURE 50 BAR, HAND PUMP WITH INBUILT NRV WITH PRESSURE 100 BAR
Installation of a hand pump in (1) Bartand in front of Meena Devi house under Maheshpur Panchayat. (2) near the Amtar pond road under Maheshpur Panchayat. (3) in front of Ramchandra house under Govindadih Panchayat and other 2 hand pumps
BPCL invites quotation from vendors for the job of: "INSTALLATION OF DIGITAL FLOW-METERS IN BOREWELLS AND REMOVAL-REINSTALLATION OF 15HP BOREWELL AT BPCL TATANAGAR DEPOT".
Repair of WC, Bath and Bore Well, Water Supply at Bengabad P.S. and Bore Well, Water Supply Work at Saria P.S. in the district of Giridih
Towards Repairing Renovation of one no. of Bore Hole (Dia 300mm Depth-90 Mtr) for Operation of Submersible of Pump at Loyabad Colliery
Relocation of Defunct Tube well (SR-KAN)
Relocation of Defunct Tube well (SR-GOV)
Relocation of Defunct Tube well (SR-KAL)
Lowering and Installation of 150 HP Submersible Pump of Bore Hole at Sahanapahari under Dobari Colliery.
Drilling of one non-coring bore hole from surface to K.M.Seam for dewatering at Lakhimata Colliery.
Lowering of CPVC pipes, rope etc. at Bore hole at CISF residential quarters under Bokaro Colliery.
Drilling/construction of one no bore hole for installation of Peizometer at Jarangdih Colliery, Kathara area.
Construction of 125 x 115 mm dia and 70M deep drilled Tube Well with installation of India Mark II hand pump etc. all complete work under DWS Division, Simdega for the Year 2023-24 (SIM_DT_70M_Gr.03)
ESTIMATE FOR TW OF 125115 MM DIA 90 Mtr DEEP DRILLED TUBE WELL WITH INSTALLATION OF INDIA MARK II IS 15500 Part 2 2004 HAND PUMP WITH PLATFORN AND DRAIN under D.W. and S. Division Seraikela
Construction of 200/165 mm Dia 270 mtrsHigh Yeild Drilled Tube Well (03 Nos) with IM II Hand pump, Platform and Soak Pit for recharging of water For Dist- Pakur, Block- Hiranpur (Group No-HIR 01)
Construction of 200/165 mm Dia 270 mtrsHigh Yeild Drilled Tube Well (02 Nos) with IM II Hand pump, Platform and Soak Pit for recharging of water For Dist- Pakur, Block- Hiranpur (Group No-HIR 02)
Construction of Extra deep drilled Tubewell with Installation of IM II Hand Pump Platform sock pit and drain etc work Group No 02
INSTALLATION OF SIX NO HAND PUMPS IN DHADHU PANCHAYAT LATEHAR UNDER CSR
Repairing and maintenance of hand pumps at Budora Colony under Phularitand Colliery
Supply of Spare parts of Deep Well Hand Pumps India Mark-II
Construction of Solar based Rural water supply Scheme in PVTG with 1.0 HP DC Solar motor pump complete set AND Construction of 300 mm x 125 mm x 90.00 m deep GPT Bore well with installation of hand pump etc.
Installation of hand pump in front of Manik Singh house in Birajpur Panchayat (2) Installation of hand pump in Hirapur under Birajpur Panchayat Installation of hand pump in front of Koranga house (3) Installation of hand pump in Babudih
Repairing of 7.5HP, 01 No bore well Submersible Motor of Murlinagar.
Drilling and commissioning of bore well all complete at Basdiha village.
Drilling of 3 Three Nos. of NX Size pilot Bore hole and 2 Two Nos. of Bore hole 14 inch Dia reaming from surface to Kalimati Bottom Seam for installation of submersible pump at Kapasara OCP, Depth upto 134m.
Construction of 125/115mm dia 70/90 Mtr deep drilled tube well with installation of IM-II mark Hand Pump with drain and platform under DWS Division Adityapur GR No.-ADP/DT/70Mtr-2/Boram(2nd call)
Construction of 125 x 115 mm dia and 90m mtrs. deep drilled Tube Well with installation of India Mark II hand pump etc. all complete work under DWS Division, Simdega for the Year 2023-24 (SIM_DT_90M_Gr.02)
Construction of 125 x 115 mm dia and 70m mtrs. deep drilled Tube Well with installation of India Mark II hand pump etc. all complete work under DWS Division, Simdega for the Year 2023-24 (SIM_DT_70M_Gr.01)
Construction of 125 x 115 mm dia and 120m mtrs. deep drilled Tube Well with installation of India Mark II hand pump etc. all complete work under DWS Division, Simdega for the Year 2023-24 (SIM_DT_120M_Gr.01)
Construction of 125 x 115 mm dia and 90m mtrs. deep drilled Tube Well with installation of India Mark II hand pump etc. all complete work under DWS Division, Simdega for the Year 2023-24 (SIM_DT_90M_Gr.03)