Loading…
Loading…
3,123 results • Best match
Construction of Gravel Packed Tube Well with Installation of Hand Pump including Construction of Platform sock pit and Drain etc work Group No 03
Construction of Gravel Packed Tube Well with Installation of Hand Pump including Construction of Platform sock pit and Drain etc work Group No 05
Construction of Gravel Packed Tube Well with Installation of Hand Pump including Construction of Platform sock pit and Drain etc work Group No 04
6inch Dia Deep Bore Well and Installation of 3 HP New Submersible Motor Pump Set with Pipes at 16 Different Place under the Project Rashtriya Krishi Vikas Yojana RKVY under BAU, Kanke Ranchi
Four (04) nos of deep bore well with submersible pump(solar power) and water storage for water supply facility at Magadh and Amrapali Project under CSR Scheme 2016-17 of M-A Area
Construction of 02 Nos. deep bore well solar operated submersible pump set, pump house and recharge pit etc. for drinking water in different village under CSR Scheme 2020-21 of A-C Area
Installation of 01 no. solar deep tube well each in Janardandih GP in west Bengal area and village Kastabad and Installation of 01(one) no. Deep Tube Well hand pump each at Adivasi Tola (Ledaharia GP) and Khokrapahari
Construction of deep bore well with solar power operated submersible pump set , pump house, Recharge pit etc. for drinking water at Khetko of Kathara area under CSR scheme 21-22 of CCL, Kathara area.
Construction of deep bore well each with solar power operated submersible pump set, Pump House, Re-charge pit etc. for drinking water under Sarubera Panchayat under CSR Scheme 2019-20, Sarubera Colliery, Kuju Area.
Construction of Deep Bore Wells with solar power operated Submersible pump set, Pump house ,Recharge pit etc . For drinking water at Bhama Shah Dharmshala, Palihari Gurudih of Kathara Area Under CSR Scheme 2021-22 of CCL at Kathara Area.
Renovation or remaining of one no. of old bore hole 72 mtr depth from surface to 2nd seam bottom Tetulmari Colliery
Construction of 02 nos. Deep bore well providing and commissioning of submersible pump motor with all electrical, cable panel, starter etc and construction of panel room at DAV School Bachra under GM Unit Piparwar Area.
Providing 01 No. Deep bore well and installation of 10 HP submersible pump with pump house near Hotel Hill Pahari Public place at Hesagarha chowk under CSR Scheme 2019-20 under Pundi Project, Kuju Area.
Construction of 02 nos. Deep bore well providing and commissioning of submersible pump motor with all electrical, cable panel, starter etc and construction of panel room at area hospital Bachra under GM Unit Piparwar Area.
Construction of deep bore well with solar power operated submersible pump set , pump house, Recharge pit etc. for drinking water at Sadam Purvi of Kathara area under CSR scheme 21-22 of CCL, Kathara area.
Construction of 02 nos. Deep bore well providing and commissioning of submersible pump motor with all electrical, cable panel, starter etc and construction of panel room at Panchwati guest house under GM Unit Piparwar Area.
Relocation of Tube Well by Drilling 125/115 mm dia drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Gumla for the year 2023-24 No of DT 47 Nos
Relocation of Tube Well by Drilling 125/115 mm dia drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Gumla for the year 2023-24 No of DT 41 Nos
Relocation of Tube Well by Drilling 125/115 mm dia drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Gumla for the year 2023-24 No of DT 42 Nos
Relocation of Tube Well by Drilling 125/115 mm dia drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Gumla for the year 2023-24 No of DT 50 Nos
Relocation of 35 nos defunct Drilled tube Well by construction of 125 x 115 mm dia 60.00 Mtrs deep drilled tube well with installation of IM-II Hand Pump under D.W.and S. Division, Chaibasa for the year 2022-23. (Group - 3)
Relocation of 35 nos defunct Drilled tube Well by construction of 125 x 115 mm dia 60.00 Mtrs deep drilled tube well with installation of IM-II Hand Pump under D.W.and S. Division, Chaibasa for the year 2022-23. (Group - 1)
Relocation of Defunct Tube Well 125 x 115 mm dia and 90 mtr deep Drilled Tube well with installation of IM-II Hand pump PCC Platform and 3.0 mtr long drain on turnkey basis (1st Call) Group No-02 (55 Nos)
Relocation of Defunct Tube Well 125 x 115 mm dia and 90 mtr deep Drilled Tube well with installation of IM-II Hand pump PCC Platform and 3.0 mtr long drain on turnkey basis (1st Call) Group No-03 (50 Nos)
Relocation of Defunct Tube Well 125 x 115 mm dia and 70 mtr deep Drilled Tube well with installation of IM-II Hand pump PCC Platform and 3.0 mtr long drain on turnkey basis (1st Call) Group No-01 (41 Nos)
Re-location of Defunct Tube well with installation of India mark II Hand pump riser pipe blue casing UPVC pipe with drain. Group NO- Relocation-05
Re-location of Defunct Tube well with installation of India mark II Hand pump riser pipe blue casing UPVC pipe with drain. Group NO- Relocation-03
Re-location of Defunct Tube well with installation of India mark II Hand pump riser pipe blue casing UPVC pipe with drain. Group NO- Relocation-04
Re-location of Defunct Tube well with installation of India mark II Hand pump riser pipe blue casing UPVC pipe with drain. Group NO- Relocation-02
Relocation of Tube Well 125 x 115 mm dia and 60 mtr av. deep Drilled Tube well with installation of IM-2 Hand pump etc. all different rural habitation in Garhwa district for the year 2022-23 (2nd Call) (Group No. 04) 40 Nos
Relocation of Tube Well 125 x 115 mm dia and 60 mtr av. deep Drilled Tube well with installation of IM-2 Hand pump etc. all different rural habitation in Garhwa district for the year 2022-23 (1st Call) (Group No. 01) 50 Nos
Relocation of Tube Well 125 x 115 mm dia and 60 mtr av. deep Drilled Tube well with installation of IM-2 Hand pump etc. all different rural habitation in Garhwa district for the year 2022-23 (1st Call) (Group No. 03) 40 Nos
Relocation of Tube Well 125 x 115 mm dia and 60 mtr av. deep Drilled Tube well with installation of IM-2 Hand pump etc. all different rural habitation in Garhwa district for the year 2022-23 (1st Call) (Group No. 02) 50 Nos
Drilling bore hole 4 nos .of 8 inch dia with submersible pump set upto 180 m depth bore hole at Nichitpur township under Sijua area.
Drilling and providing 4 inch/5inch dia Hand pump 07 nos. Tube well with all complete including pipe work at Ganga Sagar rehab site under Rjamahal Area.
Relocation of Tube Well by Drilling 125/115 mm dia drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Simdega for the year 2023-24 No of DT 30 Nos (Group 02)
Relocation of Tube Well by Drilling 125/115 mm dia drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Simdega for the year 2023-24 No of DT 30 Nos (Group 01)
Construction of 03 nos. Deep bore well providing and commissioning of submersible pump motor with all electrical, cable panel, starter etc and construction of panel room at Sangam Vihar Colony house under GM Unit Piparwar Area.
Drilling of Borewell, Supply and Installation of One number of hand pump and one solar submersible DC pump, 1.0 HP, alongwith PV modules, Construction of One Water Tank Staging, One Drinking Water Platform and One Handpump Platform
Drilling and providing 4/5 inch dia hand pump tube well with all complete at Urjanagar colony 10 (ten) Nos. at Rajmahal Area. NHS and B Type.
Supply of Spare Parts for Deep Tube Well Hand Pump India Mark-II under D.W. and S. Division, Lohardaga for the year 2023-24 under State fund.
Construction of Drilled Tube Wells with installation of India Mark-II Hand Pump in different Schools in the District of Hazaribagh for the Year 2020-21 District Deposit Head Group No.- HZB_School_02
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_23
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_09
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_05
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_06
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_19
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_14
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_12
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_20