Loading…
Loading…
3,123 results • Best match
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_21
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_18
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_07
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_17
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_11
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_08
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_22
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_04
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_13
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_10
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_03
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_02
Relocation of defunct tube well of 125/115 mm dia with. 70.0 mtrs deep drilled tube well India mark II Hand pump etc. complete in Medininagar district for the year 2026-27 under D.W.and S.Division, Medininagar. (Group No - MED/SR-3) 50 Nos.
Relocation of defunct tube well of 125/115 mm dia with. 90.0 mtrs deep drilled tube well India mark II Hand pump etc. complete in Medininagar district for the year 2026-27 under D.W.and S.Division, Medininagar. (Group No - MED/SR-6) 35 Nos.
Relocation of defunct tube well of 125/115 mm dia with. 90.0 mtrs deep drilled tube well India mark II Hand pump etc. complete in Medininagar district for the year 2026-27 under D.W.and S.Division, Medininagar. (Group No - MED/SR-7) 35 Nos.
Relocation of defunct tube well of 125/115 mm dia with. 70.0 mtrs deep drilled tube well India mark II Hand pump etc. complete in Medininagar district for the year 2026-27 under D.W.and S.Division, Medininagar. (Group No - MED/SR-4) 50 Nos.
Relocation of defunct tube well of 125/115 mm dia with. 70.0 mtrs deep drilled tube well India mark II Hand pump etc. complete in Medininagar district for the year 2026-27 under D.W.and S.Division, Medininagar. (Group No - MED/SR-2) 50 Nos.
Relocation of defunct tube well of 125/115 mm dia with. 70.0 mtrs deep drilled tube well India mark II Hand pump etc. complete in Medininagar district for the year 2026-27 under D.W.and S.Division, Medininagar. (Group No - MED/SR-5) 42 Nos.
Relocation of defunct tube well of 125/115 mm dia with. 70.0 mtrs deep drilled tube well India mark II Hand pump etc. complete in Medininagar district for the year 2026-27 under D.W.and S.Division, Medininagar. (Group No - MED/SR-1) 50 Nos.
Construction of deep bore well with solar power operated submersible pump set , pump house, Recharge pit etc. for drinking water in Pipra Tola, Mahli Bandh of Kathara area under CSR scheme 21-22 of CCL, Kathara area.
Construction of 02 nos. deep bore well solar power operated submersible pump set, pump house and recharge pit etc. for drinking water in Kumrangkhurd and Kumrangkala village under CSR scheme 2020-21 of A-C Area, CCL
Construction of Drilled Tube Well 125 X 115mm diaX90 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_ DEEP_DT_03
Construction of Drilled Tube Well 125 X 115mm diaX90 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_ DEEP_DT_01
Construction of Drilled Tube Well 125 X 115mm diaX90 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_ DEEP_DT_02
Relocation of Tube Well by Drilling 125/115 mm dia and 90 Mtr deep drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Gumla for the year 2026-27 No of DT 36 Nos
Relocation of Tube Well by Drilling 125/115 mm dia and 90 Mtr deep drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Gumla for the year 2026-27 No of DT 36 Nos
Relocation of Tube Well by Drilling 125/115 mm dia and 70 Mtr deep drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Gumla for the year 2026-27 No of DT 47 Nos
Lifting repairing submersible pump set flushing set flushing bore well lowering the pump and recommissioning etc of different borewells situated in the mines area of Ashok OCP piparwar area
Supply of Spare Parts for Deep Tube Well Hand Pump India Mark-II with latest amendment under D.W. and S. Division, Lohardaga for the year 2025-26 (Spare Parts)
Construction of 02 nos. well and 5 nos. deep bore well providing and commissioning of submersible pump motor with all electrical panel, starter and construction of panel room at kalyanpur R and R site under Ashok OCP, Piparwar Area.
Construction of 05 nos deep bore well providing and commissioning of submersible pump motor with allelectrical cable panel starter etc ,construction of panel room at Basant vihar colony new miners 48 ashok vihar colony and subhash nagar colony under
Construction of 13(thirteen) nos. of Deep Bore-Well, each with Solar Power Operated Submersible Pump set, Pump house, Re-charge pit etc. for drinking water in different project affected villages of Magadh-Amrapali Area under CSR 2019-20.
Repair of old Building , Toilet, Construction of parking shade, Septic tank 2 Nos., Soak pit 2 Nos., Assembly Stage, Boundary Wall with Concertina Wire, Main Gate, Rain Water Harvesting and Installation of Deep Bore Well at Middle School, Rupan
Supplying and installation of Solar power based mini water supply scheme for 02 units of existing deep bore well at high steel str. For mounting water storage tank having capacity 5000 ltr. At Lohandia rehab site under Rajmahal Area.
Construction of HYDT 200mm X 165mm Dia x 250.00 Mtrs deep bore well with 1.0 HP DC Solar motor pump complete set and Square Tube Steel Structure and HDPE Water Tank 6.00 mtr Staging Capacity-2000 Ltr. for Tola Lukayatand
Provision of 05 nos. Deep bore well along with installation of solar panel at Gram Rikiwa Parguta Tola, Religara Mangali Tola, Gidi DuTalla, Kishan Majdoor uchha Vidyalaya GidiC (with RO filter) and Satkariya village in front of Toladas Manjhis house
CONSTRUCTION OF 200 X 165 MM DIA 200 MTRS DEEP HIGH YIELD DRILLED TUBE WELL WITH INSTALLATION OF HAND PUMP UNDER UNTIED FUND GR UNTD HYDT CTR 01 2ND CALL
CONSTRUCTION OF 200 X 165 MM DIA 200 MTRS DEEP HIGH YIELD DRILLED TUBE WELL WITH INSTALLATION OF HAND PUMP UNDER UNTIED FUND GR UNTD HYDT CTR 02 2ND CALL
Relocation of tubewell of 125 mm x 115 mm dia x 60 mtr deep (av) drilled tube well complete with installation of India mark-II hand pump wiyh 32 mm dia medium class G.I. Riser Pipe by DTH Rig Machine with 125 mm Blue UPVC Casing pipe
For driilling of a bore hole dia150 mm and depth 65 mtrs. From Surface to II Seam Bottom of Tetulmari Colliery under Sijua Area.
HAND PUMP PARTS
HAND PUMP PARTS
Construction of tube wells, installation of hand pumps with platform and Supplying of Tanker with tractor for drinking water purpose near Baghmara Bus stand and other places on the occasion of Shrawani mela 2025 under D.W. and S. Div Deoghar 2025-26
Relocation of Tube Well by Drilling 125/115 mm dia and 90 Mtr deep drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Simdega for the year 2026-27 No of SRDT 41 Nos Gr No SR-III
Relocation of Tube Well by Drilling 125/115 mm dia and 90 Mtr deep drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Simdega for the year 2026-27 No of DTSR 42 Nos Gr no SR-II
Relocation of Tube Well by Drilling 125/115 mm dia and 90 Mtr deep drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Simdega for the year 2026-27 No of SRDT 42 Nos Gr no SR-I
Replacement of Pipeline at Saphi Tola Bore Hole under Purnadih Project, NK Area.
Special Tools (Deepwell Hand Pumps Components) asper IS15500 (Q3)
Supplying and installation of Solar power based mini water supply scheme for 01 unit of existing deep bore well at high steel str. For mounting water storage tank having capacity 5000 ltr. At Kadu tola, Dumaria village under Rajmahal Area. (Hurra C)
Repairing of hand pump and flushing of old tubewell with installation of submersible pump at colony area of DVC ,Hazaribag