Loading…
Loading…
1,860 results • Best match
Construction of compound wall, Road and Play ground to SC ST Residential Govt. First Grade College at Gundepalli (K) Village (2) Dismantling and Construction of New 4 Class Room for Govt. Lower Primary School at Gopanpalli Village (3) Construction of New 2 Class Room for Govt. Higher Primary School at Sityanayak TandaVillage in Sedam Taluka under KKRDB Micro for the Year 2024-25
ok
Providing and Fixing MS steel fabric mesh fencing to Compound wall of TE building at White field Bangalore nit no 24
Construction of compound wall for bifurcated land parcel Between the BSNL and Auctioned Part at CTSD Yard-2 Magadi Road, Bangalore.
Reconstruction of collapsed compound wall between Postal and MAX-1 TE compound and other allied civil work at Udupi (3rd call).
Construction of Compound
Reconstruction of collapsed compound wall foundation, including providing barbed wire fencing in superstructure, adjacent to Admin building at main TE compound, BELGAUM.
Periodical maintenance and allied civil works and rising of compound wall with UV stabilized sheet at E18 Staff quarters, WMS compound, Bangalore
Reconstruction of damaged compound wall in between Adarsh palace apartment and back side of E16 staff quarters at WMS compound Jayanagar Bangalore
Supply of material for Construction of compound wall on the east side part 2 of Governament high School at H Hosahalli Village
Supply of material for Construction of compound wall on the east side part 1 of Governament high School at H Hosahalli Village
Supply of material for Construction of compound wall on the west side part 1 of Governament high School at H Hosahalli Village
Supply of material for Construction of compound wall on the south side part 1 of Governament high School at H Hosahalli Village
Construction of Precast Compound Wall and repair works in Biogas Plant, Construction of CC Road in Tippu Masjidh Road 2nd Cross near Anganavadi road, Construction of CC Road and laying of UGD pipeline adjacent to Universal public school, Construction of Deck Culvert in different locations in Ward 23 and Construction of Storm water drain from Nice road connecting to Seer halla in the limits of CMC Ramanagara.
Construction of an arch, construction of a compound wall around the building, construction of CC drain, installation of an interlock, installation of a new door at the main entrance of the building, repair of the toilet on the ground floor, repair of the toilet on the first floor construction of a new watchman room at the commercial Tax Deputy Commissioners office building in Chikkmagalur town
Providing New Gate with Approach Compound wall for Amusement area for Heavy Vehicle from the MG Road side, Providing New Drain and Deck Slab near Dragon pond circle and ZP Pavilion Circle, Desilting and Repair work, Providing and Fixing of FRP Sheet cover for Dragon Pond Front entry area, and Repair works for P.Kalinga Rao Ganamantapa Toilet and Green Rooms inside KEA Premises, Mysuru.
ARMO Works for the year 2024-25. SH- General maintenance works and repainting with new color code to compound wall at FSD Hassan.
AS PER BOQ AND TENDER DOCUMENT
GOODS INDENT
Package 4-1)Construction of Compound wall to Angnawadi centre at Apral (continuation work) 2) construction of toilet block to anganawadi centre at lingadahalli village 3) Construction Of Toilet Block to Anganawadi Centre-6 at Jalahalli 4) construction of toilet block to gram panchayatha awarenes centre at Gugal village in Deodurga Taluk of Raichur District. Under TP Grant for the year 2025-26 (RESERVED FOR CAT-II A)
Cleaning, Sanitation and Disinfection Service - Outcome Based - Substation Boundary wall colony area store area etc; Vegetation plants uprooting cutting cleaning and disposal; Outdoor
Providing and Fixing GI Chain link Fencing to fallen portion of the Compound wall in front of Old CSC Building at Kushalnagar, Kodagu Dist.
Construction of Compound wall at Lingayat Smashan Old PB road Khasbag, Pavers Road at Chambarwada near Netalkar Factory Khasbag, Providing Half round pipe to existing drain and repairs to pavers road at Sai Nagar 2nd Cross, Providing Half round pipe to existing drain at Khasbag Shanti Badawane, Providing RCC drain at Bazar Galli Khasbag cross road opposite Balaji Temple in Ward No.21, Belagavi. (RESERVED FOR SCHEDULED CAST (SC) ONLY)
Construction of Kitchen Room to Govt Lower primary School at Madarnaagasnapalli village (2) Construction and Upgradation of 02 Rooms to Govt Higher Primary School at Hayyala village 3) Construction of 02 Rooms to Govt High School at Kurkunta village ... and Compound wall to ...
Construction of compound wall to school at 1)govt. HS Aurad (B) 29050100132, 2)Govt. LPS Urdu Torana 29050114609, 3)Govt. HPS Nandibijalgaon 29050112201, 4)Govt. HRPS Manur (K) 29050110301, 5)Govt. GHPS Raipalli 29050112701, 6)Govt. HPS Dongaon (M) Wadi 29050123001, 7)Govt. LPS Dudaknal 29050103601, 8)Govt. HS Ekamba 29050104504, 9)Govt. HPS Beldal 29050100701, 10)Govt. HPS Gadikushnoor 29050105001 and 11)Govt. LPS Shivpur 29050110506. BDR251211276.
Construction of office Building ( II ) Construction of Security Building ( III ) Construction of Toilet Building ( IV ) Development of Rain Water Harvesting ( RWH ) ( V ) Construction of Compound Wall & Gate (VI ) Sinking of Borewell and Installation of Submersible Pump (VII ) Construction of Weigh Bridge Flatform ( VIII ) External electrification works( IX ) Constrction of Internal CC Road ( X ) Constrction of Internal CC Drain at Propsed SWM Site in the limits of Byndoor TP
Providing and Fixing GI Chain link Fencing to collapsed portion of the Compound wall on the rear side of TE building at Kollegala, CHAMARAJANAGAR Dist.
GOODS INDENT
Installing a rainwater Installing a rainwater harvesting system at the sports school hostel in K. Chandaragi village (Ramdurg Taluk Belagavi district) installing G.I. sheets on the roofs of four classrooms at the Higher Primary School in Toranagatti ... a compound wall a ...
Providing barbed wire fencing on top of west side compound wall, demolishing GM DGM car parking and miscellaneous civil works in CTO Compound, camp area, BELAGAVI.
Above Main Building terrace, Along Compound Wall of Khanapur Bus Stand, No of Horadings-9, Size-As per tender documents, MLF Rs.8160, EMD Rs.24480
Package02- Repairs of Govt Pre-Metric college at Alabanur, Repairs of 4 rooms to Govt High School at Timmapur, Repairs of compound wall to Govt High school at Alabanur, Repairs of anganwai center-2 an development of ply ground at Haretanur village, Repairing of Anganwadi Center-3 developing the playground and construction of the compound at Raithanagar Camp village in Sinhanur Taluka of Raichur istrict. Under TP grant for the year 2025-26
AS PER BOQ AND TENDER DOCUMENT
Repair
Goods Indent
Goods Indent
Goods indent
Providing two wheeler parking pavement, disposal of surplus earth behind telephone house, kerb stone patch and repairs to compound wall (press club side) at CTO compound Bangalore.
Painting to compound wall and MPLS NOC Room at FF replacement of water supply line connected to BWSSB line at BG East Telephone Exchange Lazor Road Bengaluru
Basic fecility work at Belavadi Public Buriyal Ground ( Construction of Compound wall ,Public waiting shead,watersupply and Watchmen Room and approach road work) in Hootagalli CMC Limit
SW-I: ADEN/Mandya Sub division: Proposed construction of Boundary wall at km 13/200-15/300 Up and 15/700-15/850 Up and Down for a total length of 2400 meter in SSE/Pway/Kengeri section. SW-II: KSR Bengaluru: Proposed provision of women crew lounge in first floor of existing crew lobby at PF 1 and proposed LPS room at PF - 5. Maintenance period is 6 months. (Composite Tender)
As per Tender
Goods Indent
Asphalting Road work at Ward No 21 of Nayar layout Ganapati stage to Rina Disouza houses infront straight road and Orvil house to Church Compound Wall and Asphalting Road work at Ward No 21 of Petkar layout from Dengil dsouza house to Gouda farm straight road and from Fatima ugargol house to Ramdas hanabar house 2 cross roads and Construction of CC Road work from infront of Urdu school to Mahbub house in Haliyal TMC Limits
Construction of RCC Drain at ward no 17 Kadam home to kalavant home ward no 14 Mailarlingeshwar temple to walikar home ward no 03 Articulture dept compound wall to kanakadas circle and gadi home to walikar home,jidagannavar home to mukkannavar home ward no 08 mahamad shavali darga to mabusbhani darga ward no 18 kuri home to kubasad home and Near Fire dept and ward no 08 CD work Near chandsad mulagund home in shirahatti town limits