Loading…
Loading…
4,834 results • Best match
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur from (Ch.00.00m to 20.00m).
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Chainage 260.00m to 280.00m).
Dismantling the existing damaged Masonry rain water rain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur from (Chainage 360.00m to 380.00m)
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Ch.100.00m to 120.00m).
Providing Tiles Flooring in Govt High School at Unnamalaikadai and Construction of Compound wall and Maintenance of Roof work in Govt High School at Kanjiracode in Unnamalaikadai Town Panchayat
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur from (Chainage 300.00m to 320.00m)
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur from (Chainage 240.00m to 260.00m)
Dismantling the existing damaged Masonry rain water rain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur from (Chainage 340.00m to 360.00m)
Special Repairs to damaged compound wall in the East side Stage Extension and other connected repair works Government Higher Secondary School for Girls located at Ashok Nagar Chennai 83
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Ch.80.00m to 100.00m).
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur from (Chainage 320.00m to 340.00m)
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur from (Chainage 280.00m to 300.00m)
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Ch.40.00m to 60.00m).
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Ch.20.00m to 40.00m).
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur from (Chainage 220.00m to 240.00m)
- Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Chainage 200.00m to 220.00m).
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Ch.60.00m to 80.00m).
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Ch.180.00m to 200.00m).
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Ch.140.00m to 160.00m).
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Ch.160.00m to 180.00m).
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur from (Chainage 380.00m to 400.00m)
Special repairs to the damaged flooring and other works and compound wall in the existing 7 nos of ARS in Guruvappa Dairy farm campus at Ayanavaram in Chennai City.
Construction of compound wall at Kamaraj Nagar OHT East and South Side and Providing Motor Arrangement in Existing borewell at Attrankarai Vazhi Nadappu in Thirubuvanam Town Panchayat, Thanjavur District
Improvements to the Burial Ground at Thatarapatti Waiting Shed - Rs.4.50 Lakhs, Compound Wall 30m - Rs.2.44 Lakhs CC Pavement 68m x 3m) - Rs.3.22 Lakhs H/O O.G.Halli
Dismantling the existing damaged Masonry rain water drain and Providing new RCC drain at Southern side of compound wall for 400KV SS at K.R.Thoppur. from (Ch.120.00m to 140.00m).
Can be seen in the tender documents
22/2020-20 of SE GCC CBE
Special Repairs to Compound Wall, Openyard pavement, Walls. Sunshade, shelter, ramp and certain other works in Madras High Court Guest House at Malligai Campus at Greenways Road, Adyar, Chennai-28.
Special Repairs to damaged flooring2nd floor male toilet, Compound wall, Parking shed, drain cover slab and other repair works in Regional Workshop at State Health Transport Department,Guindy,Chennai-32.
Providing Deep Borewell with Mini Power Pump Room at Elukadai Bazar ,Kilakullam west side of Govt.Hospital Construction of Compound wall at Bus stand OHT in Veeravanallur Town Panchayat, Tirunelvelli District.
EXTENSION OF HDPE PIPELINE AT VADAKKANANDAL MARIYAMMAN KOIL OHT TO KK NAGAR, JOTHI NAGAR AND VIJAYAM NAGAR AND CONSTRUCTION OF COMPOUND WALL AT GOMUKHI DAM OPENWELL IN VADAKKANANDAL TOWN PANCHAYAT
Colour washing and painting to the outer wall surfaces in the existing control room and writing in the name board at the entrance of compound wall at K.R.Thoppur 400 K.V.SS.
Construction of Workers shed , Compound wall with Retaining wall , Providing Electrical Arrangements, Formation of BT road and Filling With Gravel at Resource Recovery Park in Muthupet Town Panchayat, Thiruvarur District.
Construction of compound wall with RR masonry on south side of NCTPP-III near Clive building in the collapsed portion for a length of 30RM/5m Height with pile foundation
Repair and Manitenance and Painting , construction Of compound wall for OHTs at Lalakudiyiruppu , Thavanai ,South kathiravan colony , Mundruvaikkal, Mundru vaikkal sekkadi, Mottai , Melapudur pump Room in Pudur(s) Town Panchayat
Construction of spiral ladder at ward no 1 samykaan parthiyar colony,providing OHT inside access ladder at puthugrammam OHT and construction of north theroor OHT Compound wall inTheroor Town Panchayat
As per BOQ
Construction of 8 Additional Class Rooms , 2 Additional Labs, Additional Toilets for Boys 3 Nos Girls 3 Nos and Compound Wall in Government Higher Secondary School at Paranam in Ariyalur District .
Dismantling of existing damaged Masonry rain water drain and Providing the RCC drain from Southern side of SS yard road to compound wall at K.R.Thoppur 400KV SS.(Ch.00.00m to 13.00m).
Dismantling of existing damaged rain water drain and Providing the RCC drain from Southern side of 100KV SS yard road to compound wall at K.R.Thoppur 400KV SS.(Ch .45.00m to 58.00m)
Providing Mill rejects in the portion between eastern side compound wall and Silo road from MTPS II Silo gate to Skew bridge from Ch.0.00-Ch.210.00 to curtail jungle growth.
Maintenance and special Repairs Work to Bharathi nagar Corporation Middle School Boys Toilet in ward no.53 and Construction of Compound wall at Janasakthi nagar Elementary School in ward no.57
Providing Mill rejects in the portion between eastern side compound wall and Silo road from MTPS II Silo gate to Skew bridge from Ch.210.00 -Ch.530.00 to curtail jungle growth.
Dismantling of existing damaged Masonry rain water drain and Providing the RCC drain from Southern side of SS yard road to compound wall at K.R.Thoppur 400KV SS.(Ch.13.00m to 26.00m).
Construction of ward no 6 Burial Ground Compound wall at Near Theppakulam, and Repairs to the Storm water Drain at ward no 5 8 13 and 14 in Sendamangalam Town Panchayat
Construction of compound wall at fci colony oht , Karamadai street OHT ,Perumal naidu layout oht , old pillaiyar kovil street oht and Andipalayam oht premises in Vedapatti Town Panchayat, Vedapatti, Coimbatore -641007
Can be seen in the tender documents
Construction of 8 Additional Class Rooms 2 Additional Labs, Additional Toilets for Boys 3 Nos Girls 2 Nos and Compound Wall in Government Model Higher Secondary School at Sendurai in Ariyalur District
Special Repairs to Damaged Pathway Flooring, Kerb Walls, Manhole Chamber in rear side, Lift wall tiles, damaged walls, Ceiling, Staircase Handrails, Compound wall and other repair works in Singaravelar Maligai, Chennai 01
Providing cycle shed with recovered materials Renovating Sump and Pump rooms Facelift to the compound wall and providing CPVC water lines to connect corporation water supply to sump in PGMO Compound Coimbatore