Loading…
Loading…
5,458 results • Best match
SH Providing and laying 30mm thick bituminous concrete including profile correction, V-shape drain and road marking in Km 0/0 to 1/0 and 6/0to 7/630.
Providing and laying Tack coat and 25 mm thick Bituminous Concrete in Km. 0/000 to 1/000, 2/000 to 3/000 and 6/000 to 7/000
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 2/00 to 3/00 and 5/00 to 6/00
Providing and Laying bituminous concrete 25 mm thick in KM 0/00 t0 2/00, 7/00 to 10/360, 0/00 to 1/00 Respectively with paver finsher)
(SH- Providing and laying 25mm thick Bituminous Concrete in km. 7/0 to 8/0, 9/0 to 10/0 and 17/0 to 19/0 including profile correction).
P/L 30mm thick bituminous concrete in km 4/000 to 5/200 i/c interlocking paver block at km 4/310 to 4/365 and Thermoplastic paint strips)
Providing and Laying Water Bound Macadam Grading -II ( 63 TO 45 mm ) , Primer Coat ,Tack Coat and 30 mm thick Bituminous concrete at Km 1/00 to 1/780
SH. Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 0/00 to 1/00 ,1/00 to 2/00
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 10/700 to 11/00 and 11/00 to 11/300
P/L 30mm thick Bituminous Concrete on Torri nallah to Bheri Road Km. 0/00 to 2/650 and Cholthra to Kothi Road Km. 0/00 to 2/0)
Providing Renewal coat by 25 mm thick Bituminous concrete a/w hot applied thermoplastic compound 2.50mm thick edge line in km 5/00 to 6/00). AMP-2025-26
Preparation of sub grade, P/L GSB, WMM andP/L 30mm thick Bituminous concrete in approaches at RD 3/820 to 3/885, 3/893 to 4/300) ( Under SCSP
Providing and laying BUSG for correction layer, bituminous concrete in km3-0 to 5-0 providing and laying hot applied thermoplastic edge line and construction of PCC Hill side drain
Special repair of Link Road to Langar at Deotsidh District Hamirpur HP SH Providing and laying bituminous concrete 30mm thick in Km 0/0 to 0/682 with paver finisher
Providing and laying bituminous concrete including profile correction in km 0/0 to 1/0, 3/0 to 4/0,8/0 to 9/0 AND 11/0 to 12/0)
providing and laying built-up spray grout layer for pot hole and 25 mm thick bituminous concrete in km 0/0 to 1/00 and 2/00 to 7/00
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound 0/0 to 2/490 including 5 year routine maintenance after completion of work
Providing and laying built-up spray grout, tack coat, bituminous concrete 25 mm thick and thermoplastic strip in Km 8/0 to 9/0 and 9/0 to 10/0
P/L HPC 900 MM Dia along with toe walls and wing walls, interlock tiles, bituminous concrete, V-shape drain,, protection work etc in km 0/0 to 6/400
SH- Providing and laying 30 mm thick Bituminous Concrete in km. 2/00 to 3/00 ) AMP under PMGSY Incentive under (Financial incentive 2019-20 for the year 2020-21)
(SH- Providing and laying 25mm. thick Bituminous concrete in km. 1/0 to 3/0 including profile correction, drain and Grating). Under Annual Maintenance Plan for the year 2025-26.
Providing and Laying 25 mm Bituminous concrete at km-1/000 to 1/650, 1/800 to 2/670 and Cement Concrete Pavement at km-1/650 to 1/800 )
Providing and laying built-up spray grout, tack coat, bituminous concrete 25 mm thick and thermoplastic strip in Km 7/0 to 8/0 and 8/0 to 9/0
P/L 30mm thick bituminous concrete in kms 0/0 to 2/0 I/c G-III in pot holes and P/L interlocking paver block 80mm thick (ISI marked)
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound 0/0 to 1/510 including 5 year routine maintenance after completion of work.
Providing and Laying bituminous concrete 25 mm thick in km 0/00 to 5/00 with paver finisher) (package No. HP-03-47) (Under PMGSY Incentive) with five year maintenance
AMP for 2020-21 for Barotiwala Gunai road SH P/L renewal coat by provding 30 mm thick bituminous concrete thermoplastic edge line in km 13/0 to 14/0
Initial rectification , periodic renewal with 25mm thick bituminous concrete and five year routine maintenance in Km. 0/0 to 7/500) under PMGSY Performance Incentive 2024-25) HP-04-164
P/L 30mm thick bituminous concrete in kms 3/0 to 5/0 and wet mix macadam in pots holes and cement concrete paver block and Const. of side drain.
Providing and Laying Built up spray Grout Single layer, Tack Coat and 30 mm thick Bituminous Concrete at Km 2/0 to 3/0 and 3/0 to 4/0)
P/L WBM-GII 63mm to 45mm Built Up spary Grount Single Layer Tack coat and 30mm thick Bituminous Concrete at Km 0/0 to 3/0 (Incentive 2023-24
P/L bituminous concrete 30mm thick in km. 0/0 to 1/0 and 1/0 to 2/0) respectively (DRRP NO. HP-03-05VR0090 and VR0023) (With paver finisher)
Providing and laying 30mm bituminous concrete pavement, road side drain and C.C. pavement in various reaches on DSS Kandi road, portion Sarotari Aprehar road, Kanda Munda road (Under Telecom Deposit)
SH P/L 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coatbTack coat and thermoplastic layer on PMGSY Road Chruhun to Batali road km 0/0 to 1/0
P/L 30mm thick bituminous concrete in kms 3/0 to 4/500 I/c G-III in pot holes and P/L interlocking paver block 80mm thick (ISI marked)
SH- Providing and laying 30 mm thick Bituminous Concrete in km. 5/00 to 6/00 ) AMP under PMGSY Incentive under (Financial incentive 2019-20 for the year 2020-21)
P/L 25mm thick bituminous concrete and Thermoplastic line in Km 3/00 to 4/00,8/00 to 9/00,9/00 to 10/00 and 10/00 to 11/00).
(SH Providing and Laying bituminous concrete 30 mm thick in km. 0/ 0 to 1/00 Respectively). (DRRP No-HP-03-05 VR0001 and VR0120) Under PMGSY with paver finisher
P/L 30mm thick bituminous concrete in kms 0/0 to 2/0 I/c G-III in pot holes and P/L interlocking paver block 80mm thick (ISI marked)
Providing and laying 25 mm Thick Bituminous concrete, Penetration, in km 1/00 to 2/00 and 2/00 to 3/00) Village road ADDL. Km. (Under AMP 2024 - 2025)
Providing and Laying 30mm thick Bituminous Concrete alongwith providing and laying of Hot Applied Thermoplastic compound 2.50 mm thick for edge line in between km. 0/00 to 1/00)
M/T on Himatpur Dabli Kheel (Basholu road) in Km. 0/00 to 6/135 (SH P/L WBM-G-III, Open Garded Premix Carpet 20mm thick with seal coat at Rds 0/585 to 1/365, C/O Parapets, V-Shape drain, B/Wall and P/L Hume Pipe Culvert at Various Rds)Deposit work
Providing and laying 20mm thick premix carpet with seal coat at RD 1/460 to 1/550, 1/570 to 1/825, 1/985 to 2/150 and cement concrete pavement at RD 1/550 to 1/570 and 1/825 to 1/870 on Pukharbar 1410 Dam area to village Khabbal road km 0/0 to 4/0
SH Metalling/Tarring on RD 0/0 to 0/410
Metalling and Tarring in kilometer 0-0 to 1-0
Metalling and Tarring in Km 0/000 to 0/400
Metalling/Tarring work at Rd. 1/00 to 1/630
C/O Sub Structure,super structure, approaches and metalling tarring
SH Mettaling and Tarring Improvement of Road and C.D work