Loading…
Loading…
5,458 results • Best match
P/L 30mm thick bituminous concrete km 5/00 to 8/00 i/c interlocking paver block at RD 6/195 to 6/245 and Thermoplastic paint strips)
SH Providing and laying renewal coat by proving 30mm thick bituminous concrete and road marking in km 4/0 to 5/0 and 5/0 to 6/0
Construction of retaining wall, providing and laying G-I,G-II Surface Dressing SS-I, RS-I and Bituminous concrete in at RD. 8/000 to 9/075
SH Providing and laying renewal coat by providing 30mm thick bituminous concrete and road marking in km 3/0 to 4/0 and 4/0 to 5/0)
Providing and laying 30mm thick Bituminous Concrete with Paver Finisher on Km 0/000 to 1/000, 1/000 to 2/000 and 2/000 to 2/840
P/L 30mm thick bituminous concrete in kms 0/0 to 1/0 I/c interlocking paver block 80mm thick (ISI marked) and G-III in pot holes.
Providing and laying Tack coat and Bituminous Concrete in Km 44/900 to 44/990, Km 54/0 to 54/380 and Km 57/800 to 57/830.
Providing and laying Bituminous concrete with tack coat surfacing in Km 0/000 to 8/829 (BT portion only) including five year maintenance after completion of construction work).
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 0/00 to 1/00 ,3/00 to 4/00
Providing and laying 30mm thick Bituminous Concrete with Paver Finisher on Km 5/000 to 5/065, 5/100 to 5/210 and 5/300 to 6/000
Providing and laying 30mm thick Bituminous Concrete with Paver Finisher on Km 0/000 to 1/000, 7/000 to 8/000 and 9/000 to 10/000
Providing and Laying BUSG for correction layer, Bituminous concrete in kilometre6-0 to 10-0,Providing Laying Hot applied Thermoplastic edge line and const of hill side drain
Providing and laying 25mm thick bituminous concrete with Paver Finisher in KM 0/0 to 1/00, 2/00 to 3/00 and 4/00 to 6/00
Providing and laying built up spray grout layer for pot holes and 30 mm thick bituminous concrete in Cholthera to Kothi Road Km 7/000 to 11/720
Providing and laying G - III, SS - I, and 25 mm Thick Bituminous concrete, in km 0/00 to 0/440) Village road ADDL. Km. (Under AMP 2024 - 2025)
Providing and laying 30mm thick Bituminous Concrete with Paver Finisher on Km 0/000 to 1/000, 1/000 to 2/000 and 2/000 to 2/900
SH Providing and laying renewal coat by proving 30mm thick bituminous concrete and road marking in km 31/0 to 32/0 and 32/0 to 33/0
SH PL 30mm thick Bituminous concrete, Wet Mix Macadam WMM Priming coat and Tack coat and Providing and applying thermoplastic layer in km 0 0 to 3 740
Providing and laying 30mm thick bituminous concrete and PCC drain in K.M. 52/0 to 53/0, 55/0 to 56/0 and 56/0 to 57/0
(SH Providing and laying renewal coat by providing 30mm thick bituminous concrete and road marking in km 5/0 to 6/0 and 6/0 to 7/500)
Providing Patch work with 30 mm Bituminous Concrete on Kufri Chail Road Km 0/000 to 2/000 and Kufri Bazar road Km 0/000 to 0/720
Providing and laying tack coat and 30mm thick bituminous concrete in km. 48/0 to 48/590, 49/0 to 49/400 and 52/0 to 52/510
Repair and Restoration of Rain Damages on Link road to Village Tatehra in GP Tatehra km 000 to 2250 SH Re laying Metaling and Tarring due to road crust damage and Drain Km 0200 to 0500 Under PDNA 2023
Const of and MT link road Harijan Basti Lower Lohara km 000 to 1250 SH CO 900mm dia RCC HP culvert at RD 0210 and 0430 and PL GSB WMM and Tarring between km 0050 to 0550 under SCCP
Restoration of rain damages on Dehri College road Km. 0.00 to 1.300 SH Metalling Tarring in extra damaged portion RD 0.00 to 0.667 U shape drain at RD 0.300 to 0.565 and railing of Dehri Bridge and flooring etc
Construction of Barnali to upper Nari via Lower Nari road Km. 0/0 to 3/650 (SH. C/o R/wall, 900mm dia Hume Pipe culverts, P/L GSB and Metalling and Tarring at various RDs) under Industrial Corridor.
C.O LER TO THAN ROAD UP TO PANCHAYTA SHANTLA KM 0.0 TO 1.700 SUB HEAD C.O 900MM DIA HUME PIPE CULVERT AT RD 0.700 TO 0.935 AND P.L GSB -II AND TARRING IN KM 0.500 TO 1.0 UNDER OTMNP
Construction of link road from Mohalla Gujjran Pukhru to Swan RiverTatha Wad from km 000 to 4580 SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and Vshape drain etc including five
Const and MT link road from Panjoa to Kuthiari road Km 000 to 0981 SH Const of 900mm dia RCC hume pipe culvert at RD 0840 and PL GSB WMM and tarring between Km 0345 to 0981 Under MMGSY
CONSTRUCTION OF LIK ROAD CHAPLAH TO SARD OGRI VIA LDOA 0.0 TO 7.00 SUB HEAD METALLING TARRING WORK INKM 2.430 TO 3.420 AND C.O CC PAVMENT AT RD 1.555 TO 1.600 V SHAPE DRAIN IN KM 0.900 TO 1.015
Re-Metalling and tarring of road leading to main Girls Hostel Complex by providing bituminous carpeting (R.D 0/0 to 0.160.00) mts and by providing cement concrete from R.D 0/160.00 to 0/370mt.) in H.P. University, Shimla-5
Metalling and Tarring on extended portion Hill/valley side on NH 22 (new NH 05) from Dhalli Tunnel to Mashobra Junction in km 153/180 to 155/045 and km 24/180 to 24/250 on Shimla Bye Pass
Correction layer G-I, G-II metalling and tarring
C/O wire crate, U-shape drain, tarring etc.
Metalling, tarring, V-shape drain, RCC hume pipe culvert.
C/O H-pipe culvert and Metalling and tarring.
Mettalling and tarring RD 1/970 to 2/495
Formation Cutting, C.D. work, providing and laying metalling/tarring
SH C.O G.S.B grade I WBM GII and tarring.
Metalling/Tarring in km 0/0 to 0/250
C/O R/ wall and B/wall, C/O Wire crate wall, CD work including W/W , P/L WBM G-I, WBM G-II and G-III , premix carpet, C/O V.Shape Drain, C/O PCC parapet and logo sign board and kilometre stone km. 0/00 to 6/255)Under NABARD RIDF-XXV
Providing and laying soling Grade-I in Km. 0/0 to 0/250, wearing Grade-II in Km. 0/0 to 0/250 and Km. 0/360 to 0/400, 20mm thick premix carpet in Km. 0/0 to 0/400 and construction of U-shape drain in Km. 0/155 to 0/400).
Rofd,P/L GSB, G-II, G-III and open graded Premix Carpet from RD 0/850 to 2/250 and Construction of 1.50mtr span RCC slab culvert at RD. 2/045 , V-shape drain at Rd 0/750 to 0/910 and Breast wall at Rd.0/325 to 0/350).Under SCSP
Construction of link road from Dehrian to Balah km 0/0 to 3/450 Formation cutting Passing places Retaining walls Breast wall Crash barrier Cross Drainage Works GSB WBMII WBMIII Tarring works Cement concrete pavement Interlocking paver block Drain Pa
C.O PUCCA BHARO TO LOWER SWANA ROAD KM 0.0 TO 2.100 IN DISTT KANGRA H.P SUB HEAD FORMATION CUTTING C.O R.WALLS CD WORKS P.L GSB WBMII.WMBIII TARRING PCC DRAIN PARAPTES ROAD SIDE FURNITUTRE INCLUDING FIVE YEAR MAINTENANCE UNDER NABARD RIDF XXIX
Repair Restoration from link road Nehri to Santoo Tilla km 0300 to link road Baba Bhuri Wala Temple km 00 to 3000 SH PL GSB WMM and metalling tarring at RD 000 to 0300 Mohal Nehri Naranga against DC deposit
Construction of Bridge at Luna RD 150 450 on NH 154A in the State of Himachal Pradesh SH 41 5 m Span Steel composite Bridge, Bailey Bridge Dismantling of Bailey Bridge Formation Cutting and Filling Protection work Metalling and Tarring
Special repair on link road to sada Shiv Mandir Km 000 to 2000 SH Co Retaining Wall V shape drain extension of hume pipe culvert and Providing and laying GSB WMM and tarring for extra widening on curves at various Rds
Construction of Khanotiyo Bassali road km 0/0 to 13/0 (SH Metalling Tarring Formation cutting Retaining wall, Breast wall CD works, RCC slab culvert, CC V-shape drain parapets in km 0/0 to 13/0) under NABARD RIDF- XXV
Up-gradation of Marredi Sillagharat Road km 0/000 to 13/800 Formation Cutting, C/o Passing Places, Missing CD, Side Drain, Parapets, CC Pavement and Tarring work under PMGSY-II, (Batch - I, 2019-20) under Package No. HP-02-03.