Loading…
Loading…
5,458 results • Best match
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot thermoplastic compound 2.5mm thick Centre line in km 6/000 to 6/600
Initial Rectification, Periodic Renewal with 25mm thick Bituminous Concrete and Five Years Routine Maintenance in KM 0/0 to 1/225) under PMGSY Performance Incentive 2024-25
P/L 30mm thick bituminous concrete in kms 0/0 to 1/0 including G-III in patches interlocking paver block, C/O drain and thermoplastic strips.
Initial rectification , periodic renewal with 25mm thick bituminous concrete and five year routine maintenance in Km. 0/0 to 4/200) under PMGSY Performance Incentive 2025-26
P/L 30mm thick Bituminous Concrete with Paver Finisher in KM 10/00 to 11/00, 11/00 to 11/200 and 11/200 to 13/00
P/L 30mm thick Bituminous Concrete with Paver Finisher in KM 29/00 to 30/00, 31/800 to 32/00 and 32/00 to 33/00
(Sh- P/l 30mm. thick bituminous concrete in Km. 0/00 to 1/00 and v-shape drain with E/wall RD 0/00 To 0/100)
(SH - P/l 30mm. thick bituminous concrete in Km. 3/00 to 4/00 and v-shape drain with E/wall RD 2/120 To 2/220)
SH-Providing and laying 30 mm thick Bituminous Concrete in between km. 4/00 to 5/500 ) ( under PMGSY Road approved AMP for the FY- 2021-22 )
SH- Providing and laying 25mm thick bituminous concrete WBM G-III and thermoplastic paint in Km 16/00 to 17/00 and 17/00 to 18/00
Initial Rectification, Periodic Renewal with 25mm thick Bituminous Concrete and Five Years Routine Maintenance in KM 0/0 to 4/00) under PMGSY Performance Incentive 2024-25
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot thermoplastic compound 2.5mm thick Centre line in km 3/000 to 4/000
P/L 25mm thick bituminous concrete and Thermoplastic line in Km 15/00 to 16/00, 16/00 to 17/00 and 17/00 to 18/00
SH-Providing and laying 30 mm thick Bituminous Concrete in between km. 0/00 to 0/650 ) ( under Road approved Additional AMP for the FY- 2021-22 )
SH providing and laying bituminous concrete 30 mm thick in km. 0/0 to 1/500) (DRRP No-HP-03-03 VRooo3) Under PMGSY with paver finisher
Providing and laying 25mm thick Bituminous concrete at RD. 68/0 to 69/0 73/0 to 74/0 and 74/0 to 75/0 3.000 kms)
Providing and laying G - III, SS - I, and 30 mm Thick Bituminous concrete, in km. 49/00 to 51/00 MDR road ADDL. (Under AMP 2024 - 2025)
Repair of pot holes and providing 10cm wide road marking and 30 mm thick bituminous concrete in km 9/00 to 10/00,11/00 to 15/170 ).
Providing and laying 30mm thick bituminous concrete, PCC drain in K.M. 0/0 to 1/0, 1/0 to 2/0 and 2/0 to 3/0
Providing and laying 30mm single layer bituminous concrete (HP0404VR013715205) in km. 5/0 to 6/0, 6/0 to 7/0 and 7/0 to 7/150
Providing and laying, G-III for correction of existing surface, repair of pot holes, 30 mm thick bituminous concrete between in K.M. 0/00 to 3/500
Initial rectification , periodic renewal with 25mm thick bituminous concrete and five year routine maintenance in Km. 0/0 to 4/200) under PMGSY Performance Incentive 2025-26
Providing and laying renewal coat using Bituminous Concrete 25mm thick i/c rectification of surface and Thermoplastic Paint Strip between KM RD 0/0 to 7/0
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot thermoplastic compound 2.5mm thick Centre line in km 4/000 to 5/000
Providing and Laying Penetration, tack coat and 25 mm thick Bituminous concrete in km. 5/00 to 5/600(Under Addl. AMP for the year 2025-26).
(SH Providing and Laying 30 mm thick Bituminous Concrete and Hot Thermoplast line in km. 3/0 to 4/0 and 4/0 to 5/) 2.00 km)
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 0/200, Km 0/270 to 0/470 and 0/600 to 0/850
P/L 25mm thick Bituminous Concrete with Paver Finisher in KM 0/0 to 0/750, 0/750 to 1/00 and 1/00 to 1/300
Providing and laying BUSG Bituminous Concrete in Km. 8-0 to 12-900 and const. of PCC Hill side drain in 500 mtr. Length) and edge line.
Providing and laying BUSG , Bituminous Concrete in Km. 0/0 to 3/760 and const. of PCC Hill side drain in 300 mtr. Length) and edge line.
Initial Rectification, Periodic Renewal with 25mm thick Bituminous Concrete and five year Routine Maintenance in KM 0/0 to 2/060 under PMGSY Performance Incentive 2025-26
SH- Providing and laying 30mm bituminous concrete, thermoplastic paint in Km. 62/0000 to 63/000, 68/000 to 71/000 and 83/000 to 85/000.
SH- Providing and Laying Tack Coat, bituminous concrete 30mm thick including profile correction Km. 0/0 to 2/0 under PMGSY incentive for the Year 2023-24)
Providing and laying 30mm thick Bituminous concrete in Km 5/00 to 6/00 , 10/00 to 11/00 and 15/00 to 17/00 4.00 Kms)
P/L bituminous concrete 30mm thick in km. 1/0 to 2/0 and 3/0 to 4/0) (DRRP NO. HP-03-05VR0048) (With paver finisher)
Initial rectification , periodic renewal with 25mm thick bituminous concrete and five year routine maintenance in Km. 0/0 to 6/345) under PMGSY Performance Incentive 2024-25
SH Providing and laying bituminous concrete 30 mm thick in km 0/0 to 3/760) DRRP No HP-03-03 VR0060) Under PMGSY with paver finisher
(Sh - P/l 30mm. thick bituminous concrete in Km. 0/00 to 0/400 and v-shape drain with E/wall RD 0/30 To 0/230)
P/L 30mm thick bituminous concrete in kms 2/0 to 3/0 including G-III in patches, interlocking paver block, C/O drain and thermoplastic strips.
Providing and laying 30mm single layer bituminous concrete (HP0404VR010715305) in km.1/300 to 2/000, 2/000 to 3/000 and 3/000 to 3/770
Periodical Renewal for the year 2023-24 on T01 to Dangoh Khas road (SH.Providing and laying 30mm thick Bituminous Concrete in Km. 0/0 to 2/0)
(SH- Providing and laying 25mm. thick Bituminous concrete in km. 0/040 to 1/0 including profile correction). Under Annual Maintenance Plan for the year 2025-26.
P/L 30mm thick bituminous concrete in kms 0/0 to 0/940 including 80mm thick ISI marked paver block in kms 0/940 to 1/0
Providing and laying 30mm Thick Bituminous concrete at RD 26/600 to 27/00, 29/00 to 30/00 and 30/00 to 31/00 2.400 Kms.)
Providing and laying BUSG , Bituminous Concrete in Km. 5-0 to 6-0 and const. of PCC Hill side drain in 100 mtr. Length) and edge line
P/L bituminous concrete 30mm thick in km. 18/0 to 19/00 and 30/0 to 31/0)(DRRP NO. HP-03-03MDR063) (With paver finisher)
Providing and laying BUSG , Bituminous Concrete in Km. 4-0 to 6-440 and const. of PCC Hill side drain in 300 mtr. Length and edge line.
SH - Providing and Laying 30mm thick Bituminous Concrete laying with Paver Finisher and hot thermoplastic compound 2.5mm thick Centre line in km 5/000 to 6/000
P/L 30mm thick Bituminous concrete on Proun to Rangar Road Km. 0/00 to 3/0 and Ghanala Saloun Road Km. 14/0 to 17/0
Providing and laying BUSG , Bituminous Concrete in Km. 0/0 to 2/0 and const. of PCC Hill side drain in 200 mtr. Length) and edge line.