Loading…
Loading…
5,458 results • Best match
SH Providing and Laying GSB, wearing coat G-II and Tarring works in km 0/0 to 0/500
SH - Construction of approaches both side of bridge, Providing and laying Soling, wearing and tarring work etcetera (Balance Work)
SH Providing wearing coat GSB G II G III and Tarring works in km 0/00 to 0/700
Formation cutting, passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, Tarring work, side drain and parapets
SH C/o ROFD CD works and Providing and laying Metalling Tarring in km 1/760 to 2/0
Providing and Laying Metalling and Tarring in Km 7/410 to 7/550 and 8/220 to 8/330)
Construction of Improvement, Passing places, Missing CD, Side drain, Parapets, Cement concrete pavement, Interlocking paver Block and tarring work
/L WMM and Tarring from R.D . 0/0 to 0/300 and Edge walls at various RDs. (D.C. Deposit)
P/L GSB, G-II, G-III, Metalling and Tarring at RD 0/100 to 0/700). (Industrial Corridor)
Improvement of curves, passing places, missing cross drainage work, PCC drain, PCC pavement interlocking paver block and tarring work
Improvement of curves, passing places, missing cross drainage work, PCC drain, PCC pavement interlocking paver block and tarring work
( SH- P/L GSB,G-II, G-III Metalling and tarring work at RD 29/00 to 31/00)
Improvement of curves, passing places, missing cross drainage work, PCC drain, PCC pavement interlocking paver block and tarring work
SH Providing and Laying GSB, wearing Coat G-II and Tarring works in km 0/0 to 0/630
P/L Tarring work in damaged portion and C/o B/wall at Rd 5/700 to 5/780
SH Providing and laying metalling/tarring CD work and V shape drain in km 0/0 to 0/420
Removal of formation deficiencies, construction of retaining walls, including metalling and tarring, construction of V-shape drain and parapets.
(SH- Providing and laying WBM G-II and Metalling at Tarring at Km. 0/200 to 1/0) SCSP
SH Providing and Laying GSB, wearing Coat G-II and Tarring works in km 0/0 to 0/600
SH Providing and laying GSB, G-II, G-III and metalling tarring at RD 0/0 to 0/400.
P/L WBM-II and Tarring work Km 0/00 to 0/450 on Jaisinghpur Bazzar Bye Pass road
(SH- Providing and Laying soling G-I, G-II Metalling and Tarring in Km. 0/600 to 1/0)
Providing and laying wearing and tarring and construction of V-shape drain in Km. 0/0 to 0/700
SH P/L Wearing Coat G II and Tarring works at RD between KM 0/00 to 0/600
(SH- F/C, Missing cross drainage works. Metalling Tarring, side drain, Parapets and road sign boards including five years maintenance).
Providing and laying GSB WMM in Km 1/400 to 1/650 Tarring in Km 0/00 to 1/650
Providing and laying Tarring in Km0/442 to 0/492 0/498 to 0/548 1/200 to 1/600
Formation Cutting, R/Walls, Ext. HPC, GSB, WMM, Tarring Work, Cement Concrete Pavement, Side Drain, Crash Barrier, Road Furniture etc.
Formation cutting, Retaining wall , Breast wall, Metalliing and Tarring , Pucca Drain , Parapets in Essential reaches and Hume pipe culvert etc.
Metalling and Tarring on approach road to helipad at Dhameuli Km.1-0 to 2-0 Deposit job no 2
Formation cutting, P/L GSB, G-II, G-III and Metalling and Tarring in Km. 0/500 to 1/00
Sub Head- ROFD, Protection of work, Metaling and Tarring, construction of road side drains, Parapets, Crash Barriers, Road Safety Measures
Formation Cutting Protection works Cross Drainage works Metalling Tarring Road side Drains Crash Barrier Parapets Km stone Dumping Sites etc
Formation Cutting Protection works Cross Drainage works Metalling Tarring Road side Drains Crash Barrier Parapets Km stone Dumping Sites etc
Sub Head- ROFD, Protection of work, Metaling and Tarring, construction of road side drains, Parapets, Crash Barriers, Road Safety Measures
Formation cutting, P/L GSB, G-II, G-III and metalling and Tarring in Km. 0/500 to 1/00
SH Providing ROFD, R/wall, U-shape drain, hume pipe culvert and metalling AND Tarring in Km 2400 to 29600).
( SH PL Tarring from NH 505 to ADC office Kaza, and petrol Pump to Jangchuk Guest House Kaza )( Under MMGSY).
Formation Cutting Protection works Cross Drainage works Metalling Tarring Road side Drains Crash Barrier Parapets Km stone Dumping Sites etc
Formation Cutting Protection works Cross Drainage works Metalling Tarring Road side Drains Crash Barrier Parapets Km stone Dumping Sites etc
C/O Hume Pipe Culvert, C/O Wing Wall, C/O R/Wall, C/O B/Walls, Metailng and Tarring
(SH Formation cutting, Passing places, R/Wall, CD work, GSB, WBM-II, WBM-III, Tarring work, side drain and parapets).
ROFD, R/walls, B/wlls, dumping site, Metalling and Tarring, CD. Works, Drain and Parapets etc.). Under NABARD RIDF XXV.
SH P L WBM G II G III Tarring and CC Drain in k M 0 0 to 1 500
ROFD Retaining walls, Breast walls, Cross Drainage work, V-shape drain, Parapets and Metalling-Tarring in Km. 0.0 to 15.840.
SH-Providing and Laying stone soiling WBM Grade-III and Metalling Tarring in between km. 0/00 to 0/450
Improvement, Construction of Passing Places,Missing CD, Side Drain, Parapets, CC Pavement, Interlocking Paver Block, Tarring work and Sign boards
Improvement, Construction of Passing Places, Missing CD, Side Drain, Parapets, CC Pavement, Interlocking Paver Block, Tarring work and Sign boards).
SH Construction of Passing places,Side Drain, Parapets, Cross drainage, Metalling and Tarring Work etcetra including five year routine maintenance.