Loading…
Loading…
5,458 results • Best match
SH-P/L WBM G-I,II, III and Tarring PCC V-shape drain in km. 0/00 to 01/300).
Formation cutting, Passing places, Retaining wall, CD work, Granular Sub Base, G-II, G-III, Tarring work, Side Drain and Parapets
SH ROFD CD Works WBM G I G II G III and tarring in K m 0 0 to 1 0
Formation cutting, passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, Tarring work, CC Pavement, side drain and parapets
Formation cutting, passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, Interlocking Paver, side drain and parapets
Construction of Balance work of formation cutting, Retaining wall, Edge wall, U-Shape drain, Cross Drainage, Parapets, Metalling and Tarring etcetera
Formation Cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
Removal of formation deficiencies C/o passing places, Missing CDs Side drains, parapets CC pavement, interlocking paver blocks and tarring work
Improvement, Passing Places, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, CC Pavement, Interlocking Paver block, Tarring and Road Signs etcetra)
Removal of formation deficiencies C o passing places, Missing CDs Side drains, parapets CC pavement, interlocking paver blocks and tarring work
Metalling Tarring works, Construction of Retaining wall, Breast wall, Cross Drainage work, OCC drain and PCC Parapets under NABARD RIDF XXXV
P/L Metaling and Tarring in Km. 0/0 to 1/0 C/O R/Wall and side Drain) (Under SCSP)
Formation cutting, Passing places, Retaining wall, CD work, Granular Sub Base, WBM-II, WBM-III, Tarring work, Side Drain and Parapets
C/o Retaining wall in km. 0/280 to 0/292 and Tarring in km. 0/0 to 0/600 DMFT
Construction of balance work of formation cutting, retaining wall, cross drainage work, V-shape drain, parapets and Metalling and Tarring etc
Removal of formation deficiencies C/o passing places, Missing CD Side drains, parapets CC pavement, interlocking paver blocks and tarring work
P/L Metalling and Tarring works bw at RD 1/310 to 1/570 and 2/0 to 2/650). SCSP
Metalling and Tarring, R/Wall in Wire Crate and C/O Road side drain in Km. 0/0 to 1/220
SH Formation Cutting Construction of Passing Places Side Drain Parapets Cross drainage Metalling Tarring work etc. including five year routine maintenance
Formation Cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
SH- Providing and laying G-I, G-II andG-III and Tarring in Km. 5/225 to 6/825 UNDER SPMRM.
Formation Cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
Formation Cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
Formation Cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
Formation cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
Formation Cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
Formation Cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
Formation cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
P/L renewal coat by providing mix seal surface at RD 0/00 to 1/00
Formation deficiency, Providing Cross Drainage M/T of road
Providing and laying Grade -III in Km 0/00 to 1/00
Periodic Renewal on Bhadyara to Kahru road (SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 0/0 to 1/0 VR009113101 and Karu to Timal road in Km 1/0 to 2/0 an 3/0 to 3/500 VR012113102 and 012113104) Under State Head
P/L 30mm thick bituminous concrete in kms. 0/0 to 0/600 and 0/640 to 1/0 I/c 80 mm thick ISI marked paver block at RD 0/600 to 0/640 and u-shape drain in kms. 0/520 to 0/545 and thermoplastic strips
P/L 25mm thick Bituminous concrete on Ratti Meramasit Leda road km 0/0 to 4/0, Troh to Pipli road km 2/0 to 4/0, Sidhyani to Patha road km 2/0 to 3/0), Ratti to Behal road km 0/0 to 2/0 (Under PMGSY).
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km 24/140 to 25/00, 25/00 to 26/00, 26/00 to 27/00, 27/00 to 28/00
Annual Maintenance Plan for the year 2026 27 on Patta Beja Masoolkhana road in Km. 0/00 to 17/500.(SH P/L Renewal coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 0/00 to 3/00 and 80mm thick interlocking tile pavem
Annual Maintenance Plan for the Year 2025-26 on Barotiwala to Gunai road in Km. 0/00 to 19/120.(SH Providing and laying renewal coat by provding 25mm thick Bituminous concrete and thermoplastic edge line in Km.7/00 to 8/00 and 9/00 to 10/00)
P/L 25mm Thick Bituminous concrete, Thermoplastic Road Marking and Maintenance of Side Drain on Shambuwala to Nehrla Kun road km 1/0 to 3/840,Jabal ka Bag to Amrion Bakarla(Nahan Kandaiwala Jabbal Ka Bag road) km 2/0 to 4/230) and Burma Papri to Jang
AMP for the year 2026-27 on Joharji Mallah road in Km. 0/00 to 27/460(SH P/L renewal coat by providing 30mm thick bituminous concrete and thermoplastic edge line in km. 0/00 to 2/00 and 80mm thick interlocking tile pavement at slusly reaches
Providing and Laying bituminous concrete 25 mm thick in Km 2/00 to 4/00, 0/00 to 1/00 , 2/00, to 2/600, 0/330 to 1/00, 0/00 t0 1/00, 4/00 to 4/620 0/00 to 1/500 Respectively with paver finisher
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound(Painting line)and V-Shape drain between Km 40/500 to 41/0, 41/0 to 42/0 , 45/0 to 46/0 and 47/0 to 48/0
(ii) AMP on Hamirpur on Link road to Guhal road(VR047). KM 0/0 to 3/00. (iii) AMP on Hamirpur on Nalti to Dakohal road (VR041). KM 0/00 to 2/00 (SH P/L 30mm thick Bituminous Concrete 80mm thick paver block and V-Shape drain etc.).
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 0/00 TO 1/200, 0/00 TO 1/00, 2/00 TO 3/250 AND 0/00 TO 1/00, 2/00 TO 3/00 RESPECTIVELY WITH PAVER FINISHER) (DRRP NO. HP-03-05- VR0021, VR0023 AND VR0112).
Construction of Retaining wall with PCC toe wall at RD 2/380 to 2/395 and 3/030 to 3/045, Removal of slips in various reaches and Providing and Laying GSB, G-II, G-III, 50mm thick DBM, 20mm thick Bituminous concrete and 2.5mm thick (10cm wide) Therm
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 0/0 TO 1/00, 0/0 TO 1/900, 0/0 TO 4/0, 0/0 TO 2/0, 0/0 TO 0/700 RESPECTIVELY WITH PAVER FINISHER) DRRP NO. HP-03-05 VR0028, VR0022, VR0033, VR0131, VR0109.
P/L 30mm thick bituminous concrete in kms. 0/0 to 0/230 and 0/270 to 1/0 and 80 mm thick ISI marked paver block at RD 0/230 TO 0/270 AND U-shape drain in kms. 0/080 to 0/120 and thermoplastic strips
(SH- Providing and laying 30mm thick bituminous concrete and repair of pot holes at Kaffota to Kando Cheyog road in km. 4/0 to 6/0 and 7/0 to 10/0 and Solan Meenus road in km. 111/00 to 113/00) For the year 2023-24.
Annual Maintenance Plan for the year 2026-27 on on Parwanoo Kasauli Dharampur Subathu Solan road in Km. 0/00 to 57/320.(SH P/L Renewal Coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 19/00 to 21/750, 24/200 to 25/
P/L 30mm thick bituminous concrete in kms 0/0 to 0/350 and 0/390 to 1/300, 1/340 to 2/0 including 80mm thick ISI marked paver block in kms 0/350 to 0/390, 1/300 to 1/340 along with U-shape drain
C/O R/wall at RD 2/530 to 2/550, P/L CC Pavement at RD 1/970 to 1/990 2/715 to 2/740 P/L bituminous concrete 30mm thick in between km 0/00 to 3/00 on Dhar Dheli Jassai road) (under PDNA Head)